• 제목/요약/키워드: New Project

검색결과 3,230건 처리시간 0.028초

A NESTING APPROACH IN DISCRETE EVENT SIMULATION FOR INTEGRATING CONSTRUCTION OPERATION AND SCHEDULE MODELS

  • Chang-Yong Yi;Chan-Sik Park;Doo-Jin Lee;Dong-Eun Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.400-408
    • /
    • 2009
  • Simulation applications for analyzing the productivity of construction operations at operation level and project schedules at project level are crucial methods in project management. The application at two different levels should be very tightly linked to each other in practice. However, appropriate integration at the levels is not achieved in that existing systems do not support to integrate operation models into a schedule model. This paper presents a new approach named to Discrete Event Simulation-Nesting modeling approach, which supports not only productivity analysis at operation level but also schedule management at a project level. The system developed by the authors allows creating operation models at the operation level, maintaining them in operation model library, executing sensitivity analysis to find the behaviors of the operation models when different combination of resources are used as existing DES systems do. On top of the conventional functions, the new system facilitates to find the optimum solution of resource combinations which satisfy the user's interest by computing the hourly productivity and the hourly cost of the operation. By drag-and-dropping an operation model kept in the operation model library, the operation models are integrated into an activity of the schedule model. When a complete schedule model is established by nesting operation models into the schedule model, stochastic simulation based scheduling is executed. A case study is presented to demonstrate the new simulation system and verify the validity of the system.

  • PDF

프로젝트 매트릭스 조직의 신제품개발 프로젝트에서 프로젝트 관리자의 역량이 성과에 미치는 영향 -A사 기술연구소를 중심으로- (The Effects of Project Manager's Competencies on the Performance of NPD Project in Project Matrix Organization: Focused on the Institute of Technology of Company A)

  • 윤인환;김주현;이희상
    • 디지털융복합연구
    • /
    • 제13권10호
    • /
    • pp.295-303
    • /
    • 2015
  • 본 연구는 프로젝트 매트릭스 조직의 신제품개발 프로젝트에서 해당 프로젝트 관리자의 역량을 지적, 관리, 감성 역량으로 분류한 후, 각 역량이 사전/사후 측면에서 기획 성과와 완료 성과에 미치는 영향을 실증적으로 분석하였다. 이를 위하여 프로젝트 매트릭스 조직 내 프로젝트 관리자들을 대상으로 한 설문조사 결과를 토대로 역량과 성과 간의 관계를 PLS(partial least square) 구조방정식 모형으로 확인하였다. 가설검증 결과, 프로젝트 관리자의 지적 역량은 기획 성과와 완료 성과 모두에 유의한 영향을 미치는 반면, 관리 역량과 감성 역량은 두 성과 모두에 긍정적인 영향을 미치지 못한 것으로 나타났다. 이와 같은 노력은 프로젝트 관리의 역량과 성과에 관한 연구에서 매트릭스 조직을 대상으로 구체화된 역량과 성과를 분석한 차별화된 시도이며, 본 연구결과는 최근 재조명을 받고 있는 프로젝트 매트릭스 조직 내 신제품개발 프로젝트 관리자의 선발과 교육 시 프로젝트 성과에 중요한 역량 개발에 도움이 될 것으로 기대된다.

Hermeticity and Reliability Issues in Microsystems Packaging

  • 함석진
    • 한국마이크로전자및패키징학회:학술대회논문집
    • /
    • 한국마이크로전자및패키징학회 2007년도 SMT/PCB 기술세미나
    • /
    • pp.129-146
    • /
    • 2007
  • [ ${\square}$ ] A mathematical model has been developed and used to analyze the limits of He fine leak test. ${\square}$ Uncertainties inherent in using the MIL-STD-883 guidelines for hermeticity evaluation of small packages have been demonstrated. ${\square}$ A new methodology to quantitatively characterize hermeticity has been developed.

  • PDF

국내 대학의 BIM 기반 IPD 교육 현황 분석에 관한 연구 (An Analysis of IPD Education Based on BIM in a Korean Universities)

  • 함미화;손정욱
    • 한국BIM학회 논문집
    • /
    • 제5권3호
    • /
    • pp.11-18
    • /
    • 2015
  • Integrated Project Delivery (IPD) is a new trend in the building industry and a key feature of IPD is the use of BIM to support project collaboration. Therefore, engineers should learn the use of BIM and IPD in the construction industry. In this study, the authors draw necessary components for developing an IPD course curriculum through analyzing a project case and current courses provided by universities in Korea. The authors make several suggestions for effective IPD education in universities.

DESIGN OF THE CEMENT DEEP MIXING FOUNDATION FOR THE BUSAN-GEOJE IMMERSED TUNNEL

  • Kim, Yong-Il
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회 3차
    • /
    • pp.96-103
    • /
    • 2010
  • The GK immersed tunnel as a part of the Busan-Geoje Fixed Link Project, introduced the immersed tunnel method into Korea for the first time. This challeging project to be completed in 2010 will open a new era to link oceans of the world with optimized design and safety for future use. The immersed tunnel method would possibly suitable for use in construction of a sub sea tunnel from Korea to Japan and from Korea to China that could potentially be built in the distant future. We hope the techniques learned from the Busan-Geoje Fixed Link Project can be applied to further projects in the near future.

  • PDF

ICT 연구개발 프로젝트 발굴을 위한 창의적 방법론 (An Innovative Methodology for ICT R&D Project Generation)

  • 김영명;노윤정
    • 한국IT서비스학회지
    • /
    • 제11권2호
    • /
    • pp.185-196
    • /
    • 2012
  • The rapid evolution of ICT industry brings not only new services or products but also changes from common individual life to whole human society. Coping with these situations and survival, companies cannot help regarding R&D as the most important thing. So, discovering R&D projects which are suitable for the alternation is a big issue for many companies. To resolve the issue, KT has adopted Innovative Management Methodology developed by Strategos, which is co-founded by Gary Harmel. This paper describes this Innovative Management Methodology tailored to KT R&D. The methodology consists of five phases : focusing discovery, discovery, ideas/domains, domain elaboration & aiming point and R&D project proposal. Also, it shows some interim findings that came from the Innovative Management Process. Finally, the future plan for elaborating the methodology itself and generating new R&D projects is suggested.

풍력발전단지 개발을 위한 풍자원 해석 및 단지 설계 (Analysis of Wind Energy Resource & Case study for Wind Park Siting)

  • 변효인;류지윤;김두훈
    • 한국신재생에너지학회:학술대회논문집
    • /
    • 한국신재생에너지학회 2005년도 춘계학술대회
    • /
    • pp.21-24
    • /
    • 2005
  • This study explains the procedure that should be taken to develop a successful wind park project. It Provide guideline for activities and studies to be done step by step solution. This study follow a chronological flow through the development process. They cover Technical consideration, Assessment of Wind Energy Resource, Wind park siting and Energy yield calculation. It's build on the experience gained by the Youngduk Wind Park project and give the playa role in the development of wind energy projects. It is important to understand all theses issues if a new project is to be successfully completed.

  • PDF

서해대교 감리를 마치며 (Completing the Seohae Grand Bridge Construction Supervision)

  • 전준수
    • 기술사
    • /
    • 제34권1호
    • /
    • pp.23-26
    • /
    • 2001
  • Seohae Grand Bridge is a part of the new West Coast Highway(353km) under construction, which connects Inchon and Mokpo. It is the longest bridge in Korea (7.31 km), and has 97 spans of 60m each precast segmental approach bridges, 2 main spans of 165m each free cantilever segmental bridge(500m), and 1 stay cable bridge of 990m In total length. During the seven year long construction period, many new construction technologies and methods were utilized for the first time in Korea, and gave invaluable opportunities to experience and master these in completing the project on time with safety and precision. I am proud of being a member of this project, and wish to express deep appreciations to those who participated in the project.

  • PDF

A New Team Forming Method in Engineering Design Course

  • Kim, Jongwan
    • Journal of Multimedia Information System
    • /
    • 제4권4호
    • /
    • pp.243-248
    • /
    • 2017
  • In a basic engineering design class, first year engineering department students learn about engineering design relevant theories and carry out simple projects in teams. By doing a group project in this subject, students develop basic skills such as creativity, teamwork, communication, and problem solving. Before, class proceeded in a way where teams were randomly configured in the beginning of semester and students began working on their project immediately. However, this research introduces a new method where at the beginning of the semester, students are assigned group assignments. Teammates are randomly chosen and constantly switched so that students get a chance to work with different people and experience diverse styles and characteristics. Then, they autonomously form into teams with people they work best and carry out their project. We present the behavior of a monkey robot that recognizes emotions as a case of applying the proposed method. The feedback from the students suggest that this proposed team forming method serves to be effective especially since students who were not aware of other students' characteristics can get to know one another better and form a productive team.

A Case Study of Asphalt Pavement Construction Quality Assurance Using the Quality Related Specification Software

  • Jeong, M. Myung;Jung, Younghan
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권3호
    • /
    • pp.14-21
    • /
    • 2016
  • One of the major issues in the material-based or acceptance quality characteristics asphalt pavement Quality Assurance (QA) is that the method does not have rationality to link between the individual materials and the projected performance of the pavement. A new asphalt mix QA method has been recently developed under a national research project using the probabilistic Performance Related Specification (PRS). This advanced PRS QA methodology integrates the AASHTOWare Pavement ME Design$^{(R)}$ technology with the simple performance test concept that bridges the material characteristics with the pavement performance. This paper presents a case study of asphalt pavement performance using the developed PRS QA computer program, named Quality Related Specification Software (QRSS), with an actual pavement project, to demonstrate the developed PRS procedure and to assess the robustness of QRSS in terms of the rationality of the distress predictions. The results of this limited case study show that the new PRS QA method reasonably predicts the pavement performance, properly applied the probabilistic methods, and produced rational pay adjustment.