Journal of the Korea Institute of Information and Communication Engineering
/
v.15
no.3
/
pp.501-509
/
2011
In this paper, we offer a new strategic Portfolio Model for national IT R&D project selection in Korea. A risk and return (R-R) Portfolio Model was developed using an objectively quantified index on the two axes of risk and return, in order to select a strategic project and allocate resources in compliance with a national IT R&D strategy. We strategize using the R-R Portfolio Model to solve the non-strategy and subjectivity problems of the existing national R&D project selection Model. We also use the quantified evaluation index of the IT technology road map (TRM) and the technology level Survey (TLS) for the subjectivity of project selection, and try to discover the weights using the analytic hierarchy process (AHP). In addition, we intend to maximize the chance for a successful national IT R&D project, by selecting a strategic Portfolio project and balancing the allocation of resources effectively and objectively.
Greg Duffy;Asregedew Woldesenbet;David Hyung Seok Jeong;Garold D. Oberlender
International conference on construction engineering and project management
/
2013.01a
/
pp.403-411
/
2013
Horizontal construction projects such as oil and gas pipeline projects typically involve repetitive-work activities with the same crew and equipment from one end of the project to the other. Repetitive scheduling also known as linear scheduling is known to have superior schedule management capabilities specifically for such horizontal construction projects. This study discusses on expanding the capabilities of repetitive scheduling to account for the variance in production rates and visual representation by developing an automated alignment based linear scheduling program for applying temporal and spatial changes in production rates. The study outlines a framework to apply changes in productions rates when and where they will occur along the horizontal alignment of the project and illustrates the complexity of construction through the time-location chart through a new linear scheduling model, Linear Scheduling Model with Varying Production Rates (LSMVPR). The program uses empirically derived production rate equations with appropriate variables as an input at the appropriate time and location based on actual 750 mile natural gas liquids pipeline project starting in Wyoming and terminating in the center of Kansas. The study showed that the changes in production rates due to time and location resulted in a close approximation of the actual progress of work as compared to the planned progress and can be modeled for use in predicting future linear construction projects. LSMVPR allows the scheduler to develop schedule durations based on minimal project information. The model also allows the scheduler to analyze the impact of various routes or start dates for construction and the corresponding impact on the schedule. In addition, the graphical format lets the construction team to visualize the obstacles in the project when and where they occur due to a new feature called the Activity Performance Index (API). This index is used to shade the linear scheduling chart by time and location with the variation in color indicating the variance in predicted production rate from the desired production rate.
Proceedings of the Korean Institute of Information and Commucation Sciences Conference
/
2013.10a
/
pp.805-808
/
2013
As the development type of domestic technology on information & communications have changed from following development to leading devalopment, developing new technology and creating new market through securing basic technology and IPR has been more essential than ever before. At the same time, it is required to increase the possibility of commercialization on developed technology. Therefore, it is necessary to formulate the consensus on the value and function of project at project planning phase for creative & innovative idea to be adopted into project and to be performed successfully. Accordingly, this paper proposes use case developing methodology adopted to creative & innovative project by analysing use case developing method in software engineering. Also, new methodology is appled to LASA display developing project to prove the reliability. Since the demands on new technology is henceforth expected to increase gradually, it is necessary to continue to study on the methodology of being more formal and logically related between phases as well as on that of analysing relationship among use cases and proving logical reliability of use case.
Journal of the Korean Professional Engineers Association
/
v.42
no.2
/
pp.54-60
/
2009
On January of this year, the 29th National Science and Technology Council, presided by President M.B. Lee, officially finalized a contract for a big project to build an International Science and Business Belt(ISBB) that includes the establishment of a new institute, the Asian Basic Science Institute (ABSI) and the construction of a Rare Isotope Accelerator. The government will inject more than 3.5 trillion Wan into the ISBB project. The investment to build the care laboratory for the project, the heavy ion accelerator, the first one in Korea, will be 460 billion Wan, Korea thus aiming to build an accelerator with world-class performance. This will be the sixth in the world. The construction will start from 2012, and is planned to finish by 2015. ABSI, whose construction will be finished by 2012, is planned to be a care laboratory with 3,000 scientists and staff. To. attract world class researchers and other professionals from aver the world, the project includes the creation of a new city with a superb educational, cultural environment, and comfortable living environment for an international community. The site for this new science and business city, "scientific ecosystem", has not been officially decided yet, and supposed to be announced in the first half af this year.
Proceedings of the Korean Society for Noise and Vibration Engineering Conference
/
2003.05a
/
pp.542-548
/
2003
This paper describes an overall Noise Assurance Plan(NAP) in the project for developing a new rolling stock. In this paper, the procedure for implementing noise control activities for each development stage on the basis of the NAP is also described. The NAP was developed by KITECH(Korea Institute of Industrial Technology) and ODS(${\Phi}$degaard & Danneskiold-Samsoe in DENMARK). Generally, the main objective of NAP is that noise assurance plan applies to the establishment of organization and personnel's roles and responsibilities, set-up of overall procedure and internal audit program. Here, a few comments are made to the deviations of the actual procedure(G7 Project) relative to the suggested NAP presented. The major difference between the suggested NAP and the actual procedure was the late involvement of the noise consultant resulting in suggestions for design improvements could not be implemented due to the advanced stage of the design. Similarly, the important task of preparing sub-supplier specifications was performed. The proposed NAP will be an efficient tool for noise management in the R&D project for new rolling stock. Specially, in case that several companies and institutes are involoved in the R&D team
This study aimed to identify a difference in project implementation between villages that had executed rural village community activation support work successfully and those that had quit in the middle from the new endogenous development theory perspective. As a result, it was found that the main factors used for promoting to increase endogeneous development capabilities existed more in villages that executed project implementation support work successfully than in villages that had quit in the middle. Successful villages have a difference from the villages that had quit in the middle in that they have established a participatory decision making and cooperation system for stable operation even before their support work began, they have more assets for promoting community activity, residents' interaction and communal activity are becoming more active, and reciprocity-based mutual aid culture exists in many forms. In conclusion, seeing from the new endogenous development theory perspective, villages are developed under the interaction between internal and external factors, but the outcome of project implementation depends on whether village community holds its endogenous development capability to operate and develop such whole process of development. Therefore, village community activation policies need to be reinforced in the direction toward promoting to create the main factors for enhancing endogenous development capabilities.
International conference on construction engineering and project management
/
2009.05a
/
pp.550-557
/
2009
The concepts of 'sustainable development', 'sustainable construction' and 'green building' have been elevated to priority levels in all types and phases of construction project development worldwide. Consultants and contractors are now required to seriously consider the impact of their operations on the natural environment and the society, and consequently adopt sustainable construction practices in the development process to minimize and mitigate the negative impacts of their activities. However, existing sustainability rating tools apply to the design, post-construction and operation phases of a building; no tool exists for the rating of the performance of the contractor or the project team at the construction phase. This study aimed to develop a model for evaluating the sustainability of construction operations, drawing on the global best practice standards on sustainability. Practical applications of the model were carried out through case studies to evaluate the performances of fifteen construction firms in New Zealand. The developed model and the outcomes of the case studies were presented, including potential areas of weaknesses, strengths, constraints to achievement or adoption of sustainable construction practices and areas for improvement in the operations of the firms. The successful application of the developed model in practice shows its usefulness and ease of application. It is therefore recommended for adoption as a simple but effective system for measuring and reporting on sustainability performance or sustainability of construction operations of firms in New Zealand and elsewhere.
The purpose of this study was to analyze the conflicts in fishing villages, focusing on the Fishing Village New Deal 300 Project. In order to solve the research problem, the case analysis method was selected among qualitative research methods. Interviewees were selected as the village leaders and the MP(master planner) at the center of the project contest and promotion process. Of the leaders who were in charge of the project or in the villages selected for the project, three leaders who fully understood the purpose of this study were selected. The categorized results are as follows: First, difficulties in forming regional councils due to indifference of residents. Second, demanding excessive sacrifice of the leader. Third, the leader and the residents distrust of the local government. Fourth, the non-cooperation and intentional interference of the residents. Preventing and managing these conflicts is as follows: First, the regional arrangement of experts at the national level. Second, education for improving residents awareness. Third, structuralization of pre-learning and refueling systems. Forth, participation of residents in the decision-making process, Fifth, development and application of a practical road-map.
International conference on construction engineering and project management
/
2007.03a
/
pp.311-317
/
2007
"Environmentally Sound and Sustainable Development (ESSD)" is a key word in recent years. The construction industry, have put a great influence on ergonomic and sustainable environment. Recently, "green building certifications", such as Indoor Air Quality (IAQ) and eco-friendly material regulation have been established. With this regard, new construction and aged-housing remodeling projects are required to meet these certification criteria. Multi-housing residents have great concern on eco-product, since many cases are reported that Sick Building Syndrome is caused by toxic substance from building materials. Aged-housing remodeling project is very unique in that building residents are selected prior to design phase. Therefore, the analysis of resident's need for building materials in aged-housing remodeling is relatively easy compared to new building construction. As such, it is very important to analyze their preferences for eco-friendly materials prior to project execution. The purpose of this study is to find the needs of residents and priority of their needs. Based on their needs and priority, this paper provides a new strategy in using environment-friendly materials and maximizing their satisfaction level when aged housing remodeling is constructed. In addition, this paper provide new criteria in selecting new developed environmental materials in remodeling projects for the purpose of improving the safety and health level in construction industry.
The advent of Web2.0 has believed to be the solution against many barriers in information sharing, especially wiki. Information sharing and collaboration are realized voluntarily and unselfishly with wiki. The purpose of this paper is to analyze the benefits and challenges of using wiki as a project management method in an IT/IS project. Wiki-based project management could provide project managers and members with expert knowledge collaboration for better project results. In the research model, we used TMS(Transactive Memory System) theory to define the relation of collaboration and performance of project members. Based on a survey among project members, the interactions between wiki characteristics and performance are examined in an IS project environment. Using Smart PLS 2.0, the data was analyzed to define the interactions by the structural equation modeling. From the empirical data, the mediated effect of expert knowledge collaboration is supported. We also derive the implications of wiki-based method. It is expected to bring new possibilities of Project management performance.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.