• Title/Summary/Keyword: National highway

Search Result 716, Processing Time 0.023 seconds

Tracing the Distribution of Deicer around Highway Areas using Sodium Adsorption Ratio (SAR) of Soil (고속도로 주변 토양의 나트륨흡착비(SAR)를 이용한 제설제 분포 추적)

  • Cho, Sunghyen;Lee, Dongguen;Shin, Gunhwan;Choi, Cheonil;Lee, Goontaek;Kim, Dosoon;Lee, Byeongduk
    • Journal of Soil and Groundwater Environment
    • /
    • v.27 no.3
    • /
    • pp.22-40
    • /
    • 2022
  • The goal of this study was to estimate the possible scattering distance of deicer from the highway and the impact range of deicer on soil quality in terms of plant growth. Among the major elements (Ca2+, Cl- and Na+) of deicer, Ca2+and Cl- are usually applied as fertilizer to soil. Therefore both elements (Ca2+and Cl-) were not appropriate for a tracer of deicer at the agricultural area. In this study, SAR (sodium adsorption ratio) of soil was proposed as an alternative tracer to confirm the distribution of the deicer around the highway areas. Because deicer is the main anthropogenic source of Na+ around the highway areas and does harm to the physical properties of soil and plant growth through the destruction of soil aggregate, SAR would be an recommendable tracer to access the distribution of deicer as well as adverse effect on soil quality at highway areas. The influence range of deicer based on SAR of soil was estimated to be less than 20 m distance from the highway even though the possible flying distance of deicer was found to be more than 100 m from the highway. However the deicer seriously deposited within 10 m from the highway.

Development on Fuzzy-AHP Ranking Risk Assessment Model for the monitoring systems (관제시스템 구축을 위한 Fuzzy-AHP 위험 순위 평가 모델 개발)

  • Chung, Sung-Hak;Park, Tae-Joon
    • Journal of the Korea Safety Management & Science
    • /
    • v.13 no.2
    • /
    • pp.51-59
    • /
    • 2011
  • The objective of this study is to develop an evaluation model for the National highway risky areas. Thus, for the purposes of doing this, National highway risky area evaluated targeting to provide determination ranking and suggesting rival-superiority factors as well as under-inferiority factors in ten National highway risky areas. This study developed for modules of risky areas evaluation, using fuzzy set theory and analytic hierarchy process for evaluation model of National highway risky area in transport environment. The preceding studies assess risk analysis through analysis of causal relationships by National highway safety sector not only handles rating scale development suitable for assessment area by referring to accident frequency model but also geometric structures model. As result of this study, this model of Fuzzy Ahp Risk Analysis (FARA) apply for programmable design in real time processing through easily derive strategy for improvement activities to provide a decision-making effectively. Furthermore, this study contributes frame for improvements of National highway construction for renovation's priority strategy as well as future's policy schemes.

A Study for Determining the Rehabilitation Method Group using NHPCI on Asphalt Concrete Pavement of National Highway (국도 아스팔트 포장의 NHPCI(National Highway Pavement Condition Index)를 활용한 보수공법그룹 결정에 관한 연구)

  • Son, Hyeon Jang;Kwon, Soo-Ahn;Lee, Jae Jun;Baek, Cheolmin;Lim, Jae Kuy;Sin, Hyun Jin
    • International Journal of Highway Engineering
    • /
    • v.15 no.2
    • /
    • pp.1-9
    • /
    • 2013
  • PURPOSES : The PMS(Pavement Management System) has been utilized in order to efficiently allocate the limited budget for the maintenance of national highway system. In the PMS of national highway, surface pavement condition is evaluated by using the VI (Visual Index). However, the VI is determined only by considering the cracking rate (%) and rut depth (mm), which is not reflecting the IRI (International Roughness Index) that is known as an important factor of pavement performance. In this study, the NHPCI (National Highway Pavement Condition Index) which includes the cracking rate (%), rut depth (mm), and IRI (m/km) is suggested for determining the rehabilitation methods group. METHODS : First, the rehabilitation methods performed between 2008 and 2010 on the national highway is classified and then, NHPCI is determined for each rehabilitation method. Next, the NHPCI for each rehabilitation method is grouped through the interval estimation of the population mean and T-test analysis. RESULTS : According to NHPCI range, the rehabilitation methods are divided into four categories: Not Required, Preventive Maintenance, Overlay Treatment (with or without cutting), and Full-scale Treatment (i.e., reconstruction). CONCLUSIONS : Based on this study, it is recommended that the appropriate NHPCI range should be determined through the combination of the rehabilitation categories and Decision Procedure of Pavement Distress Condition Visual Index.

Economic Evaluation of National Highway Construction Projects using Real Option Pricing Models (실물옵션 가치평가모형을 이용한 국도건설사업의 경제적 가치 평가)

  • Jeong, Seong-Yun;Kim, Ji-Pyo
    • International Journal of Highway Engineering
    • /
    • v.16 no.1
    • /
    • pp.75-89
    • /
    • 2014
  • PURPOSES : This study evaluates the economic value of national highway construction projects using Real Option Pricing Models. METHODS : We identified the option premium for uncertainties associated with flexibilities according to the future's change in national highway construction projects. In order to evaluate value of future's underlying asset, we calculated the volatility of the unit price per year for benefit estimation such as VOTS, VOCS, VICS, VOPCS and VONCS that the "Transportation Facility Investment Evaluation Guidelines" presented. RESULTS : We evaluated the option premium of underlying asset through a case study of the actual national highway construction projects using ROPM. And in order to predict the changes in the option value of the future's underlying asset, we evaluated the changes of option premium for future's uncertainties by the defer of the start of construction work, the contract of project scale, and the abandon of project during pre-land compensation stages that were occurred frequently in the highway construction projects. Finally we analyzed the sensitivity of the underlying asset using volatility, risk free rate and expiration date of option. CONCLUSIONS : We concluded that a highway construction project has economic value even though static NPV had a negative(-) value because of the sum of the existing static NPV and the option premium for the future's uncertainties associated with flexibilities.

A Study on Soil Environment in Highway Cutting Slope and Adjacent Natural Vegetation Area (고속도로 절토 비탈면과 인접 자연식생지의 토양 환경 비교 분석)

  • Park, Gwan-Soo;Jeon, Gi-Seong;Song, Ho-Kyung;Kim, Nam-Choon;Choi, Jae-Yong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.9 no.2
    • /
    • pp.16-22
    • /
    • 2006
  • This study was carried out to estimate the physical and chemical soil characteristics in highway cutting slope areas. The soil was sampled in cutting area and natural vegetation area that was located in the upper areas of the highway cutting slope. The average total soil depth, bulk density, and soil hardness were bad in the highway cutting slope sites. The sandy loam was the most soil texture in the study area. The concentration of soil organic matter and nitrogen were very low in all highway cutting areas. The concentration of exchangeable cations was similar between the highway cutting slope and the natural vegetation sites in each highway. The soil pH was higher in highway cutting slope areas than in natural vegetation sites. In conclusion, chemical and physical properties of soil were bad in the cutting slope than in the natural vegetation area because of the loss of soil by cutting of slope area and less organic matter input by less vegetation in the highway cutting slope area. We should employ possible method to reduce the loss of soil, and compost and fertilization treatment could help to increase soil nutrient content in the cutting slope area.

A Study on Analysis of Performance Life for Hot Recycled Asphalt Pavements in the National Highway (일반국도의 가열 재활용 아스팔트 포장 공용수명 분석 연구)

  • Lee, Kanghun
    • International Journal of Highway Engineering
    • /
    • v.19 no.5
    • /
    • pp.117-129
    • /
    • 2017
  • PURPOSES : The purpose of this study is to analyze the performance life of hot central plant recycling (HCPR) and hot in-place recycling (HIR) pavements applied to the National Highway for the past 20 years and compare it with conventional hot-mix asphalt (HMA) pavement. METHODS : In order to analyze the performance life of recycling asphalt pavements, a comprehensive literature review was conducted to investigate the government law and official system for the use of recycling asphalt pavement in Korea and foreign countries. Next, the application information of using a hot central plant recycling and hot in-place recycling pavements in the national highway is collected from the database of pavement management system (PMS) and then their field condition is visually surveyed. Finally, the performance life of recycling asphalt pavements in the national highway is analyzed and compared with conventional hot-mix asphalt pavement. RESULTS :Institutions are encouraging the promotion of using recycled asphalt pavement through various legal systems in Korea as well as abroad. Based on analysis results for the average performance life of hot central plant recycling pavement applied to the national highway, the average performance life is estimated to be 10.2 years. However, the average performance life of in-place recycling pavement is estimated to be 6.5 years. However, it is expected to increase performance life after the HIR construction system is modified. CONCLUSIONS : Based on the limited data analysis of the performance life of recycled asphalt pavements, HCPR shows similar performance life to conventional asphalt pavement but HIR shows shorter performance life than conventional asphalt pavement. However, it is noted that all performance life data is very limited and it should be monitored and analyzed further.

A Study on the Online Fault Detection System to construct the knowledge based Maintenance System of Intelligent Highway Information System (지능형 도로정보체계의 유지관리 지식기반 구축을 위한 온라인 고장검출 시스템 연구)

  • Ryu, Seung-Ki;Choi, Do-Hyuk;Choi, Tae-Soon;Moon, Hak-Yong;Kim, Young-Chun;Hong, Gyu-Jang
    • Proceedings of the KIEE Conference
    • /
    • 1999.07b
    • /
    • pp.677-679
    • /
    • 1999
  • This paper introduces a implementation of fault detection for national highway line 3. Fault detection system was installed and operated on national highway line 3, environmental elements caused by abnormal status or faults has often happened. Therefore, the function of fault detection system is to speedy notify fault site, cause as well as scale of fault to manager. Though the fault detection and diagnosis system has been imported in the field of process of water and electric power, it is just beginning step in the field of ITS(Intelligent Transportation Systems). In general, Maintenance system is performed the online/offline process of detection, diagnosis and measure. This paper is studied online detection process, which is realtime remote detection.

  • PDF

Construction Strategy of Road Imagery Database for the Highway Management System (도로관리통합시스템을 위한 도로영상 데이터베이스 구축 방안)

  • Jeong Dong-Hoon;Sung Jung-Gon
    • Spatial Information Research
    • /
    • v.14 no.1 s.36
    • /
    • pp.1-13
    • /
    • 2006
  • To understand road state more quickly and accurately, KICT(Korea Institute of Construction Technology) executing a project that acquire high resolution color CCD images of the whole national highway every 10m, and offer images to the HMS(Highway Management System). At this time, national highway images of the Kyeonggki-Do, Kangwon-Do and Chungcheong-Do province were linked to the HMS and being offered to user. In this paper, from acquisition using highway photologging vehicle to database construction, the whole image-related data processes are described such as match images with their positions one to one or rearrange data acquired by road line to by management office.

  • PDF

Highway flood hazard mapping in Thailand using the Multi Criteria Analysis based the Analytic Hierarchy Process

  • Budhakooncharoen, Saisunee;Mahadhamrongchai, Wichien;Sukolratana, Jiraroth
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.236-236
    • /
    • 2015
  • Flood is one of the major natural disasters affecting millions of people. Thailand also, frequently faces with this type of disaster. Especially, 2011 mega flood in Central Thailand, inundated highway severely attributed to the failure of national economic and risk to life. Lesson learned from such an extreme event caused flood monitoring and warning becomes one of the sound mitigations. The highway flood hazard mapping accomplished in this research is one of the strategies. This is due to highway flood is the potential risk to life and limb, and potential damage to property. Monitoring and warning therefore help reducing live and property losses. In this study, degree of highway flood hazard was assessed by weighting factors for each cause of the highway flood using Multi Criteria Analysis (MCA) based Analytic Hierarchy Process (AHP). These weighting factors are the essential information to classify the degree of highway flood hazard to enable pinpoint on flood monitoring and flood warning in hazard areas. The highway flood causes were then investigated. It was found that three major factors influence to the highway flood are namely the highway characteristics, the hydrological characteristics and the land topography characteristics. The weight of importance for each cause of the highway flood in the whole country was assessed by weighting 3 major factors influence to the highway flood. According to the result of MCA analysis, the highway, the hydrological and the land topography characteristics were respectively weighted as 35, 35 and 30 percent influence to the cause of highway flood. These weighting factors were further utilized to classify the degree of highway flood hazard. The Weight Linear Combination (WLC) method was used to compute the total score of all highways according to each factor. This score was later used to categorize highway flood as high, moderate and low degree of hazard levels. Highway flood hazard map accomplished in this research study is applicable to serve as the handy tool for highway flood warning. However, to complete the whole warning process, flood water level monitoring system for example the camera gauge should be installed in the hazard highway. This is expected to serve as a simple flood monitor as part of the warning system during such extreme or critical event.

  • PDF

A Study on the Failure Characteristics for the Rock Slopes (Centering Around Jungang Highway) (암반사면의 붕괴특성에 관한 연구(중앙고속도로를 중심으로))

  • Kim, Jong-Ryeol;Lee, Jin-Su;Hwang, Pung-Ju;Lee, Yong-Hee
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2005.03a
    • /
    • pp.765-776
    • /
    • 2005
  • As a result of industrial advancement and land development, a number of highway slopes have been gradually formed and numerous problems related to their stability have been frequently caused. Generally, major factors for rock slope stability are lithology, slope inclination, slope height, degree of weathering, precipitation, condition of groundwater and so onl. Many complex factors are mostly involved in the collapse of rock slopes. In this study, a database for 94 collapsed Jungang highway slopes were set up using GIS program through literature search, site investigation, geological map and Korea tectonic province map. The analyses for the collapsed factor including sort of rock(by origin), tectonic province, highway direction, slope gradient and direction, degree of weathering, slope height were carried.

  • PDF