• Title/Summary/Keyword: National Design Team

Search Result 652, Processing Time 0.044 seconds

A Study on Design for Six Sigma Methodology for Aircraft Industry (항공 산업의 DFSS 적용방법에 관한 연구)

  • Sung, Su-Gyeong;Yoon, Hee-Kweon;Kwag, Sang-Hyug;Byun, Jai-Hyun
    • Journal of Korean Society for Quality Management
    • /
    • v.40 no.3
    • /
    • pp.316-326
    • /
    • 2012
  • Purpose: In this paper, a Design for Six Sigma(DFSS) methodology based on DMADV(Define-Measure-Analyze-Design-Verify) roadmap is presented. Methods: DFSS tools are given for each DMADV phase which is suitable for the aircraft development process. A cost reduction case study of a navigation simulation is demonstrated. Results: DFSS roadmap are presented with implementation tools for each phase. Conclusion: We propose a DFSS methodology which can benefit the design and development personnel to implement DFSS not only in aircraft industry but also in other order-based industries in general.

Analysis of Learning Experience on Team-based Technology Design Project of Non-Engineering Students

  • KIM, Insu
    • Educational Technology International
    • /
    • v.15 no.2
    • /
    • pp.201-215
    • /
    • 2014
  • The design project of a technology product provides an opportunity for students to experience the inter-connectedness of academic information and ill-defined real-world problems. This study focuses on non-engineering students' activity and perception through the assistive technology design project. For this purpose, participants engaged in a team-based technology design project. Then, a qualitative research approach was adopted, which included reflective journals with 24 undergraduate students majored in Adaptive Physical Education. The analysis identified six factors (knowledge value, social value, reality value, accomplishment value, perspective value, benefit value) of perception and five stages (topic selection, function suggestion, visualization, presentation preparation, and presentation) of activity.

Reliable Design of the Frame for Tension Type CRT

  • Bae, Joon-Soo;Lee, Byeong-Yong;Cho, Sang-Myung
    • 한국정보디스플레이학회:학술대회논문집
    • /
    • 2002.08a
    • /
    • pp.355-358
    • /
    • 2002
  • The deformation behavior of the frame for tension mask CRT is investigated by experiments and finite element method. We calculate and measure the stress-strain relation at the stress concentrations. The endurance test at 100$^{\circ}C$ was performed for checking tension decrease with time.

  • PDF

CONSTRUCTABILITY IMPLEMENTATION MODEL USING DEPENDENCY STRUCTURE MATRIX

  • Youngjib Ham;Moonseo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.550-555
    • /
    • 2011
  • Utilizing construction knowledge and experiences in design phase can reduce change orders and improve productivity in construction phase. To do so, information must be made available to the design team in time. Current approaches for effective utilization of constructability knowledge, however, only focus on the formalization of constructability knowledge such as a checklist, which lacks the consideration of the appropriate use at the proper point in time. The inadequate use of constructability knowledge can result in unnecessary reworks. To deal with this problem, the design team needs to know what constructability knowledge is required for specific design activities in the design process. This paper presents a constructability implementation model using the dependency structure matrix (DSM) that focuses on information flows between design activities and constructability knowledge. For this objective, design activities in the design process are modeled in a matrix form based on their dependency. Then, constructability knowledge, which needs to be considered in the design stage, is mapped into activities and incorporated into the matrix, creating Constructability-DSM (C-DSM). Next, the partitioning algorithm is applied to C-DSM for optimal information flow. The Partitioned C-DSM is then analyzed based on the relationship between activities. Finally, the optimal utilization of construction knowledge in the design process is determined by identifying what constructability knowledge is required for each design activity, and how and when it is reflected to design for constructability. Thus, this research can help provide robust control actions to reduce unnecessary iterative cycles in design process for efficient constructability implementation.

  • PDF

A Web Design Modeling System to Improve Communication between Web Designers and Programmers

  • Lee, Ji-Hyun;Lu, Kuo-Hui
    • Archives of design research
    • /
    • v.20 no.2 s.70
    • /
    • pp.53-64
    • /
    • 2007
  • Web development has multidisciplinary features involving diverse team members. Owing to the diverse backgrounds, however, there may be communication problems among web team members, especially between designers and programmers. Programmers often use a graphical modeling notation to communicate their designs. The graphical modeling concepts can also be helpful to designers, but most designers generally find graphical modeling notations hard to understand. We, therefore, propose an interactive computer-aided collaborative web design system including revised web graphical model notations to improve communication between web designers and programmers. We have designed and implemented a computational prototype to validate the approach and illustrate how the prototype works using concrete examples.

  • PDF

A Study on the Design Procedure of the Eight Pole Magnetic Bearings for the Inner-rotor and the Outer-rotor Type

  • Lee, Jun-Ho;Park, Chan-Bae;Lee, Byung-Song;Lee, Su-Gil;Kim, Jae-Hee;Jung, Shin-Myung;Lee, Hyung-Woo
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.6
    • /
    • pp.1424-1430
    • /
    • 2013
  • This paper presents design procedure of the magnetic bearings used for high-speed electric machines and flywheel energy storage systems. Magnetic bearing can be categorized by inner-rotor type and outer-rotor type according to the position of the rotary disc. These two types are applicable based on application environments such as application space, required attraction force, and controllability. Magnetic bearing is generally designed based on the ratio (geometrical coefficient or geometrical efficiency) of pole width to rotor journal radius but proper ratio is only decided by the analysis. This is the difficulty of the magnetic bearing design. In this paper, proper design technology of the inner-rotor type and outer-rotor-type eight pole magnetic bearings is introduced and compared with the FEM analysis results, which verifies the proposed design procedure is suitable to be applied to the design of the magnetic bearings for the industrial applications and flywheel energy storage system.

Parameterized FFT/IFFT Core Generator for ODFM Modulation/Demodulation (OFDM 변복조를 위한 파라메터화된 FFT/IFFT 코어 생성기)

  • Lee, J.W.;Kim, J.H.;Shin, K.W.;Baek, Y.S.;Eo, I.S.
    • Proceedings of the IEEK Conference
    • /
    • 2005.11a
    • /
    • pp.659-662
    • /
    • 2005
  • A parameterized FFT/IFFT core generator (PFFT_CoreGen) is designed, which can be used as an essential IP (Intellectual Property) in various OFDM modem designs. The PFFT_CoreGen generates Verilog-HDL models of FFT cores in the range of 64 ${\sim}$ 2048-point. To optimize the performance of the generated FFT cores, the PFFT_CoreGen can select the word-length of input data, internal data and twiddle factors in the range of 8-b ${\sim}$ 24-b. Some design techniques for low-power design are considered from algorithm level to circuit level.

  • PDF

Design·Manufacture and Performance Evaluation of Gathering Type Garlic Harvesting Machine (수집형 마늘 수확기 설계·제작 및 성능평가)

  • Il Su Choi;Na Rae Kang;Kyeong Sik Choi;Jae Keun Woo;Young Hwa Kim;Seung Hwa Yu;Yong Choi;Young Keun Kim
    • Journal of Drive and Control
    • /
    • v.20 no.4
    • /
    • pp.64-70
    • /
    • 2023
  • Garlic is classified as one of the three essential seasoning vegetables in Korea. In 2023, it was reported that the area under garlic cultivation was 24,700 ha, and the production stood at 318,220 tons. Garlic harvesting mechanization currently stands at 43.8%, and garlic is still collected manually after digging out using diggers, so the process is labor intensive. To reduce garlic production costs and enhance competitiveness, it is necessary to develop a high-performance gathering type harvester in place of the digging type harvester. Therefore, in this study, a gathering-type garlic harvester that can dig and collect simultaneously was designed and manufactured, and the harvest performance by factor was analyzed through a harvest performance test. As a result of the performance test, it was analyzed to perform optimally at a driving speed of 0.11m/s and a transfer speed of 85rpm. Work performance was calculated using the results obtained from the factor performance test.

Work analysis of route survey work on forest-road (임도 노선측량 작업의 작업분석)

  • Kweon, Hyeong-Keon;Lee, Joon-Woo;Choi, Sung-Min;Yeom, In-Hwan
    • Korean Journal of Agricultural Science
    • /
    • v.40 no.3
    • /
    • pp.209-214
    • /
    • 2013
  • This study examined the work time, work posture, and work intensity for the actual measurement step in forest road the design work that was being carried out. The measurement of the forest road was being carried by a team of three workers and a team of four workers. The examination of work time found that the measurement of 1km took about 8 hours for the four-worker team and 12 hours for the three-worker team. The examination of work intensity found that the energy metabolic rates of the three-worker team were lower than four-worker team. Because their energy consumption per minute decreased as their work time and rest time increased. Furthermore, when appropriate rest time was applied according to work time, the energy metabolic rate decreased and the work intensity became lower. The four-worker team was more advantageous from the time and cost aspects of the forest road measurement work. Furthermore, as the rest time was very low compared to the work time, more efficient forest road measurement work would be possible if the work intensity was lowered by considering the rest time when calculating the standard work time.