• Title/Summary/Keyword: Nakdong watershed

Search Result 207, Processing Time 0.023 seconds

A Study on the Characteristics of River Sediments in Watershed Environment of Nakdong River (낙동강 수계의 유역환경 변화에 따른 퇴적환경 특성)

  • Lee, Kwonchul;Kim, Shin;Yang, Deukseok;Park, Soojung;Jeong, Hyungi;Lee, Kyuyeol
    • Korean Journal of Ecology and Environment
    • /
    • v.52 no.4
    • /
    • pp.316-323
    • /
    • 2019
  • This study was carried out to investigate sedimentary environment changes in Nakdong River sediments. For this purpose, sediments at six sites upstream of Gangjeong-Goryung Weir in the middle of the Nakdong River were collected before and after the rainy season. Particles size, IL, TOC, TN, TP, and SRP were analyzed for the sediment environment. The changes in the watershed environment before and after the rainy season (precipitation, discharge, and SS concentration) were investigated. After the rainy season, the amount of precipitation and discharge increased more than three times, and the average concentration of SS in the stream increased more than two times. Fine grained sediment and the concentrations of IL, TOC, TN, TP, SRP were increased after the rainy season. As a result of sediment contamination assessment, IL was 19~68% of the reference value, TN and TP were 21~76% and 21~58% of the reference value. The result showed strong correlation between particle size (Silt+Clay) and organic contents of sediment (IL, TOC, TN, TP and SRP). It is considered that the change of the river watershed environment (precipitation, discharge) is an important factor of the change of sedimentation environment.

Evaluation of pumping capacity of radial collector wells using Milojevic's equation in the National River Watershed, Korea (Milojevic 경험식을 활용한 주요 국가하천 유역에서 방사형집수정의 강변여과수 취수가능량 평가)

  • Oh, Se-Hyoung;Jeong, Jae-Hoon;Park, Sang-Gyu
    • Journal of Soil and Groundwater Environment
    • /
    • v.17 no.3
    • /
    • pp.10-20
    • /
    • 2012
  • The pumping capacity of riverbank filtration using radial collector wells at the Geum, Yeongsan, Seomjin, and Nakdong rivers was evaluated using Milojevic's equation. Assessment of the radial collector wells' pumping capacity in riverbank filtration was carried out using a case study in which one set of collector wells is installed in the watershed of each river. Nakdong River was evaluated to have the highest pumping capacity for riverbank filtration. The areas capable of producing over 10,000 $m^3$ per day were found mostly in the Nakdong River.

The Regional Characteristics of Nonpoint Source Pollutant Loads in Mid-stream of Nakdong River (낙동강 중류유역의 지역별 비점오염 특성)

  • Son, Seong-Ho;Choe, Gyeong-Suk
    • KCID journal
    • /
    • v.14 no.2
    • /
    • pp.181-193
    • /
    • 2007
  • The characteristics of non-point source pollutant loads in middle-stream of Nakdong River Were studied through analysis of pollutant loads of 8 sub-watersheds divided based on administrative district. The pollutant concentration of each sub-watershed was collected from Nakdong-River Water Research Institute and Daegu Regional Environmental Office, respectively. Pollution items analysed in this study were BOD, SS, T-N and T-P. High degree of non-point pollution was observed from Gumi, Goryeong, Gyeongsan, Daegu and Sungju, and pollution was usually increased during rainy season. This result indicates that a given pollution condition within the watershed can be more sensitive than location factor to the level of water quality. The main sources of non-point pollution were population and livestock, as well as landuse factor, and were found to significantly contribute to the water pollution. Alternative solutions for controlling pollution sources, therefore, should be provided to meet target levels of water quality in this region.

  • PDF

The control of point and non-point source nitrogen to prevent eutrophication of the Nakdong River basin, Korea

  • Kwak, Sunggue;Yun, Zuwhan
    • Membrane and Water Treatment
    • /
    • v.11 no.5
    • /
    • pp.345-351
    • /
    • 2020
  • Eutrophication of surface waters is commonly caused by excessive inputs of nutrients such as nitrogen and phosphorus. Nakdong River basin was chosen as the study area to investigate the effect of point and non-point source pollution of nitrogen on eutrophication in water body. Non-point source inputs of nitrogen accounted for approximately 84% in the total nitrogen input of the upper Nakdong river watershed, which mainly consists of agricultural land and forests. However, point source inputs of nitrogen accounted for 58~85% in the total nitrogen input of the middle and lower watersheds, including urban area. Therefore, for watershed near urban area, control of point source inputs of nitrogen may be an optimal method to control eutrophication. In this respect, the enforcing reduction of nitrogen in the final effluent of wastewater treatment facilities is needed. On the other hand, to enact more stringent nitrogen regulations, the LOT (limit of technology) and environmental impact should be considered. In this study nitrogen data were analyzed to propose new nitrogen regulations.

The Possibility of Daily Flow Data Generation from 8-Day Intervals Measured Flow Data for Calibrating Watershed Model (유역모형 구축을 위한 8일간격 유량측정자료의 일유량 확장 가능성)

  • Kim, Sangdan;Kang, Du Kee;Kim, Moon Su;Shin, Hyun Suk
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.1
    • /
    • pp.64-71
    • /
    • 2007
  • In this study daily flow data is constructed from 8-day intervals flow data which has been measured by Nakdong River Water Environmental Laboratory. TANK model is used to expand 8-day intervals flow data into daily flow data. Using the Sequential quadratic programing, TANK model is auto-calibrated with daily precipitation and 8-day interval flow data. Generated and measured daily surface flow, ground water flow data and ground water recharge are shown to be in a good agreement. From this result, it is thought that this method has the potential to provide daily flow data for calibrating an watershed model such as SWAT.

Lovflow Analysis of Nakdong River Basin by SSARR-8 Model

  • Kang, Ju-Whan;Lee, Kil-Seong;Hwang, Man-Ha
    • Korean Journal of Hydrosciences
    • /
    • v.10
    • /
    • pp.17-34
    • /
    • 1999
  • The SSARR model adopting Is(integrated snowband) watershed model is applied to Nakdong River basin for lowflow analysis. The IS watershed model is added to new version of the SSARR which has functions of simulating evapotranspiration, infiltration and lower zone routing. It provieds annual water budget informations as an output file and can be operated by interactive mode. Sensitivity analysis for both cases of high and lowflows was carried out, which becomes the knowledge base for model calibration. Model verification was performed using the relative errors of highflows and absolute errors of lowflows at the control points. Monthly water budget analysis was done by IS watershed model, and is reveals that runoff coefficient is 52.6%.

  • PDF

Development and Evaluation of Regression Model for TOC Contentation Estimation in Gam Stream Watershed (감천 유역의 TOC 농도 추정을 위한 회귀 모형 개발 및 평가)

  • Jung, Kang-Young;Ahn, Jung-Min;Lee, Kyung-Lak;Kim, Shin;Yu, Jae-Jeong;Cheon, Se-Uk;Lee, In Jung
    • Journal of Environmental Science International
    • /
    • v.24 no.6
    • /
    • pp.743-753
    • /
    • 2015
  • In this study, it is an object to develop a regression model for the estimation of TOC (total organic carbon) concentration using investigated data for three years from 2010 to 2012 in the Gam Stream unit watershed, and applied in 2009 to verify the applicability of the regression model. TOC and $COD_{Mn}$ (chemical oxygen demand) were appeared to be derived the highest correlation. TOC was significantly correlated with 5 variables including BOD (biological oxygen demand), discharge, SS (suspended solids), Chl-a (chlorophyll a) and TP (total phosphorus) of p<0.01. As a result of PCA (principal component analysis) and FA (factor analysis), COD, TOC, SS, discharge, BOD and TP have been classified as a first factor. TOCe concentration was estimated using the model developed as an independent variable $BOD_5$ and $COD_{Mn}$. R squared value between TOC and measurement TOC is 0.745 and 0.822, respectively. The independent variable were added step by step while removing lower importance variable. Based on the developed optimal model, R squared value between measurement value and estimation value for TOC was 0.852. It was found that multiple independent variables might be a better the estimation of TOC concentration using the regression model equation(in a given sites).

Assessment of Future River Environment considering Climate Change and Basin Runoff Characteristics (기후변화와 유역유출특성을 고려한 미래하천환경 평가)

  • Ahn, Jung Min;Im, Toe Hyo;Lee, In Jung;Cheon, Se Uk
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.3
    • /
    • pp.269-283
    • /
    • 2014
  • This study evaluated the environmental impact based on watershed characteristics and climate change using RCP climate change scenarios provided by the Korea Meteorological Administration. Future dam inflow was estimated by the SWAT model. Dam safety evaluation and downstream duration curve analysis was performed using HEC-ResSim model. Trends of water quality was analyzed through seasonal-Kendall Test using existing water quality observation data. Release discharge and tributary runoff derived SWAT and HEC-ResSim models applied to Qual2E and the future change in water quality trends were analyzed. Integrated environmental review watershed following techniques will be able to obtain the river environment management system and environmental issues such as climate change, new guidelines for preemptively response will be provided.

Application of the Load Duration Curve (LDC) to Evaluate the Achievement Rate of Target Water Quality in the Nakdong River Unit Watersheds (부하지속곡선(LDC ; Load Duration Curve)을 활용한 낙동강수계 오염총량 단위유역 목표수질 평가방법 적용 방안)

  • Jung, Kang-Young;Kim, Hong Tae;Kim, Sang Soo;Kim, Shin;Shin, Dong Seok;Kim, Gyeong Hoon
    • Journal of Environmental Science International
    • /
    • v.26 no.4
    • /
    • pp.433-445
    • /
    • 2017
  • In recent years, the United States has used the Load Duration Curve (LDC) method to identify water pollution problems, considering the size of the pollutant load in the entire stream flow condition to effectively evaluate Total Maximum Daily Loads (TMDLs). A study on the improvement of the target water quality evaluation method was carried out by comparing evaluations of two consecutive years of water quality and LDC data for 41 unit watersheds (14 main streams and 27 tributaries). As a result, the achievement rate of the target water quality evaluation method, according to current regulations, was 68-93%, and that by the LDC method was 82-93%. Evaluating the target water quality using the LDC method results in a reduction in the administrative burden and the total amount of planning as compared to the current method.

Comparison of Changes in Upstream and Downstream Water Quality of Tributary Rivers: Gyeseong-stream and Hwapo-stream in Nakdongmiryang Watershed (지류하천의 상·하류 수질변화 비교: 낙동밀양 중권역 내 계성천 화포천을 대상으로)

  • Shim, Kyuhyun;Kim, Gyeonghoon;Kim, Seongmin;Kim, Youngseok;Kim, Jin-pil
    • Journal of Korean Society on Water Environment
    • /
    • v.36 no.5
    • /
    • pp.445-452
    • /
    • 2020
  • Tributary is a part of life space for people and a very important place that accommodates rest recreation and other daily activities. absolutely insufficient basic data about water quality and flow rate are available for basin management. Efficient water and basin management systems, which are also supported by local residents can be established by securing such basic data of major tributaries in the Nakdong river system. In this study, the fluctuation characteristics of upstream and downstream water pollution levels were compared using the measurement results of the water environment measurement network and the tributary monitoring project for the gyeseong-stream and Hwapo-stream in the Nakdong-miryang watershed. In 2017, when water pollution is the highest, it was confirmed that the annual average rainfall was the lowest. Although the upstream and downstream water quality tendencies of the Gyeseong-stream are similar, the water quality concentrations of the Gyeseong-stream are relatively different. But although the Hwapo stream has various causes of pollution, there was not much difference in the level of pollution between the upper and lower streams. In addition, both rivers need the ability to purify rivers by securing sufficient water for river maintenance, and if the correlation between water quality items can be inferred through continuous monitoring of tributaries where the aspect of water quality change is unclear, water quality management Determined to be efficient operation.