• Title/Summary/Keyword: NATM method

Search Result 152, Processing Time 0.024 seconds

Non-destructive Measurement of H-beam in Support System using a Magnetic Anisotropy Sensor (자기이방성 응력측정법을 이용한 강아치 지보구조물의 비파괴 계측)

  • Yoo, Ji-Hyeung;Moon, Hong-Deuk;Lee, Jae-Ho;Kim, Dae-Sung;Kim, Hyuk
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.1392-1397
    • /
    • 2010
  • Currently in increasing number of urban tunnels with small overburden are excavated according to the principle of the New Austrian Tunneling Method(NATM). Successful design, construction and maintenance of NATM tunnel demands prediction, control and monitoring of ground displacement and support stress high accuracy. A magnetic anisotropy sensor is used for non-destructive measurement of stress on surfaces of a ferromagnetic material, such as steel. The sensor is built on the principle of the magneto-strictive effect in which changes in magnetic permeability due to deformation of a ferromagnetic material is measured in a non-destructive manner, which then can be translated into the absolute values of stresses existing on the surface of the material. This technique was applied to measure stresses of H-beams, used as tunnel support structures, to confirm expected measurement accuracy with reading error of about 10 to 20MPa, which was confirmed by monitoring strains released during cutting tests The results show that this method could be one of the promising technologies for non-destructive stress measurement for safe construction and maintenance of underground rock structures encountered in civil and mining engineering.

  • PDF

Three-Dimensional Finite Element Analysis on Tunnel Behaivor Reinforced by Umbrella Arch Method (3차원 유한요소해석에 의한 Umbrella Arch 공법으로 보강된 터널의 거동 해석)

  • 유충식;신승우
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1995.10a
    • /
    • pp.211-216
    • /
    • 1995
  • In recent years, Natm has been successfully applied to difficult ground conditions with the use of soil-perservention methods which promote face stability and restrict excessive ground movement. When the tunnle excavation od made through difficult ground like highly weathered rock, the umbrella arch method is often adopted which pre-reinforceas tunnel crown periphery using a stiff shell-shaped structure. The umbrella arch method was originally developed in Itali, and has recently been confirmed its effectiveness in Korea as well. However, no in depth study on the umbrella arch method has been conducted ans as a result no rational analysis/design method is available at present. Therefore this study was undertaken with the aim of identifying the basic reinforcing mechanism and satablishing both qualitative and quantiative relationships between various design parameters and ground movements.

  • PDF

특정 사례터널 해석 결과 및 평가

  • 이두화
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1991.10a
    • /
    • pp.195-215
    • /
    • 1991
  • This report deals with the process of the finite element computation and the design of the particular example tunnel (the double track section tunnel for Line 5, 7, 8 of Seoul Subway). The finite element calculations are performed with the program MISES 3 was developed from Austria which have been used in Eroupe. The principles of mechanic and mathematic analysis for the program MISES 3 are based on "The Finite Element Method -3rd Edition" by O.C zienkiewicz. The calculations are approximate analysis method divide continuum into quadrilateral element and calculate deformation and stress, according to the force equations at the node of the element. On the calculation of under excavation, this is a very convenient method and able to calculate compounded structure with tunnel lining and surrounding materials. Although calculated under the same factor and conditions, the result is not same solution, according to the shape of mesh. Therefore , it is important that we collect the construction results of NATM on the spot and by comparing the results of the finite element method with the surveying results review the validity of analysis model.sis model.

  • PDF

A Study on the Ground Movement around Tunnel Reinforced by Umbralla Arch Method (Umbrella Arch 공법에 의한 터널 천단부 보강시 주변 지반의 거동에 관한 연구)

  • 배규진;김창용;문홍득;훙성완
    • Tunnel and Underground Space
    • /
    • v.7 no.4
    • /
    • pp.299-309
    • /
    • 1997
  • Soil and rock improvement and reinforcement techniques are applied to achieve safe tunnel excavation in difficult geological conditions. The Umbrella Arch Method(UAM), one of the auxiliary techniques, is used to reduce ground permeability and improve stabtility of the tunnel by inserting a series of steel pipes into ground around the crown inclined to the longitudinal axis of the tunnel. Additionally, multi-step grouting is added through the steel pipes. UAM combines the advantages of a modern forepoling system with the grouting injection method. This technique has been applied in subway, road and utility tunneling sites for the last few years in Korea. This paper presents the results of analysis of the case studies on ground movements associated with UAM used in the Seoul Subway line 5 constructon site. Improvement of tunnel stability and decrease of ground settlement expected with pipe insertion are also discussed. Finally, the method to minimize ground settlements caused by NATM tunnelling are suggested.

  • PDF

Analysis of Errors in Tunnel Quantity Estimation with 3D-BIM Compared with Routine Method Based 2D (2D기반 기존방법 대비 BIM기반 터널 물량산출 오차 분석)

  • Shin, Jae-Choul;Baek, Yeong-In;Park, Won-Tae
    • Journal of the Korean Geotechnical Society
    • /
    • v.27 no.8
    • /
    • pp.63-71
    • /
    • 2011
  • In case of applying BIM method to the civil engineering of irregularly shaped structure, BIM method is recognized to have relatively high construction productivity. In this paper, we developed quantity calculation algorithms applying BIM method to NATM tunnel construction method and implemented BIM based 3D-BIM Modeling Quantity Calculation. The results showed that BIM-based method has high reliabilty in structure work in which errors occurred only in the range between 0.00% and -1.45%. On the other hand, BIM method applied to earth work showed great error range of -19.78% to 35.30%. So the benefit and applicability of BIM method in civil engineering were confirmed. In addition, routine method for the quantity of earth work has negligible error as in the case of structure work. But, rock type's quantity calculation showed significant errors so that the reliability of 2D-based volume calculation is problematic. It may thus be concluded that 3D-BIM is more reliable than the routine method in estimating the quantity of earth work. Considering the reliability and merits in the stage of its design, construction and maintenance levels, the application of BIM to civil engineering works is recommended.

Flexural Behavior of Reinforced Ribs of Shotcrete for Various Configurations of Reinforcements (철근배근형태에 따른 철근보강 숏크리트의 휨파괴 거동특성 연구)

  • Park, Yeon-Jun;Lee, Jung-Ki;Noh, Bong-Kun;You, Kwang-Ho;Lee, Sang-Don
    • Tunnel and Underground Space
    • /
    • v.20 no.3
    • /
    • pp.169-182
    • /
    • 2010
  • H-beam and lattice-girder are the two most commonly used steel supports in domestic tunnels. Reinforced Ribs of Shotcrete(R.R.S.), which is frequently used in Scandinavian countries, is yet to be employed in Korea despite its advantages over H-beam or lattice girder in terms of economy and constructional efficiency. In this study, laboratory tests were conducted to determine the most suitable design of R.R.S in domestic tunnels. Various configuration of steel reinforcements including double layer of steel rebars were tested and compared. Reinforcement with H-beam and lattice girder were also analyzed. Results of this study can be of great use in selecting and designing of tunnel supports when the tunnel is excavated by NATM or Norwegian Method of Tunnelling(NMT).

A study of tunnel concrete lining design using the ground-lining interaction model with the interface element (계면요소를 이용한 지반-라이닝 상호작용 모델에 의한 터널 콘크리트 라이닝 연구)

  • Huh, Do-hak;Moon, Hyun-Koo
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.17 no.6
    • /
    • pp.575-586
    • /
    • 2015
  • In NATM tunnel, the Ground-Lining Interaction model(GLI model) had been proposed a one of the numerical analysis as the ground load estimation method of the concrete lining. But this model was not applied with the interface mechanism between the ground and the support member or concrete lining. Therefor in this study, it is implemented as a model for closer than actual states that the interface element applied to the existing GLI model. And the modified GLI formula is proposed with the ground load estimation that is from the numerical results for each ground and rock cover conditions. Based on the numerical results, the ground load acting on concrete lining is reduced to ave. 88~106% in case of IV ground condition and ave. 47~57% in case of weathered soil condition comparing with the existing GLI model. It can be anticipated that the results obtained from this study can be applied to an estimation of the ground load on the concrete lining modeled like as real states, consistent and economical design.

Rock Mechanics-Major Projects and Research Topics in Korea (암반공학-우리나라에서의 과제와 연구주제)

  • Chung, So-Keul
    • Economic and Environmental Geology
    • /
    • v.39 no.4 s.179
    • /
    • pp.451-471
    • /
    • 2006
  • Major projects and research topics in the field of rock mechanics are analyzed to obtain the following results: $\cdot$ Rock mechanics deals with the behavior of deformation, failure and displacement of the rock and rock mass on the basis of geological basics. Discontinuities in the rock mass are the most important parameters to control the behavior of rock mass around underground openings. $\cdot$ The objective of site investigation and testing is to determine the strength properties of the rock mass and the in situ stress regime. Specimens for laboratory and in situ tests are to be selected in order that the results of the tests give the representative properties oi the rock mass of the site in question. $\cdot$ The result of a numerical model would be better evaluated not quantitatively but qualitatively. The displacement behavior of the rock mass has to be monitored properly for the NATM (New Austrian Tunneling Method) principles. $\cdot$ The stability of rock slope is to be evaluated preferably by back analysis with strength parameters, such as cohesion and friction angle.

Evaluation of Support Requirements for the Single Shell Tunnels from the Case Study of Rock Mass Classifications (국내 암반분류 사례를 통한 싱글쉘 터널 지보량 산정 연구)

  • Kim Hak-Joon;Lee Seong-Ho;Shin Hyu-Seong;Bae Gyu-Jin
    • The Journal of Engineering Geology
    • /
    • v.16 no.3 s.49
    • /
    • pp.283-291
    • /
    • 2006
  • Shotcrete is used as a permanent lining in single shell tunnels even though shotcrete has been used as a temporary lining in NATM tunnels. Therefore, the accurate evaluation of strength parameters is very crucial because the reliable estimation of loads acting on the shotcretes is necessary to maintain the stability of tunnels. The evaluation of strength parameters of the ground far the single shell tunnels should be investigated to adapt the method in Korea because the geological condition of Korea is different from that of other country. Rock classification and strength parameters obtained from 25 tunnel sites were investigated for this study. Support types fur the different rock classes are suggested for the single shell tunnels in Korea based on the NMT because Q-system has been widely used in Korea. The support types in terms of both Q and RMR values are given based on the correlation of Q and RMR values obtained from the case studies.

Structural Stability Analysis Study for Existing Subway Tunnels Using a 3D Stress-Pore Pressure Coupled Finite Element Modelling of NATM Tunneling (NATM 터널굴착시 응력-간극수압 연계 3차원 유한요소모델링을 통한 기존 지하철터널의 구조적 안정성 해석연구)

  • Kong, Byung-Seung
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.13 no.6 s.58
    • /
    • pp.192-203
    • /
    • 2009
  • In the new Seoul-Busan high speed railroad construction specially in area of city center passage the roadbed establishment is recommended the staibility for the existing subway tunnel segments of Busan subway 1st and 2nd lines regarding the appearance condition, a quality condition and the durability of the objective facility, and it evaluates the numerical analysis using MIDAS/GTS which leads the stability of the objective facility and investigatesd tunnels. Fundamental issues in tunneling under high groundwater table are discussed and the effect of groundwater on tunnel excavation was examined using a 3D stress-pore pressure coupled Finite-Element Method. Based on the results the interaction mechanism between the tunnelling and groundwater is identified. In the both of 1st and 2nd Line the maximum sinkage, unequal sinkage and the lining stress from numerical analysis are within permission and the damage degree is appearing to be disregarded. But it enforces necessary Pre-grouting in order to minimize an actual tunnel face conduct and when the tunnel is excavated it is also necessary to minimize the outflow possibility.