• 제목/요약/키워드: Multiple tunnel

검색결과 156건 처리시간 0.023초

터널통과 전동차 내외부 소음 특성 규명 (Identification of Noise Characteristics for Subway Train Passing Through the Undergroud Tunnel)

  • Cho, Jun-Ho;Lee, Kyu-Jin;Jung, Woo-Sung;Hong, Cheol-Gee
    • 한국소음진동공학회:학술대회논문집
    • /
    • 한국소음진동공학회 2002년도 추계학술대회논문초록집
    • /
    • pp.338.2-338
    • /
    • 2002
  • Passengers in automobile or train are exposed to a worse noise environment when they are in the tunnel than in the open field. This is due to a relatively higher space density of sound energy by multiple reflection phenomenon of noise generated by operation of transportaton vehicles from tunnel wall compared to open field. In this study, noise characteristics of subway train running through a tunnel were investigated at straight/cruved track and tunnel type(semi circula/box). (omitted)

  • PDF

무선센서네트워크를 이용한 터널 모니터링 시스템 (Tunnel Inspection and Monitoring System by Wireless Sensor Network)

  • 김형우;한진우
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 한국정보통신설비학회 2006년도 하계학술대회
    • /
    • pp.91-94
    • /
    • 2006
  • In this paper, we deployed the tunnel inspection and monitoring system by wireless sensor network. It is shown that the wireless sensor network which is composed of sensor, wireless communication module, and gateway system can be applied to tunnel monitoring system. Sensors included herein are acceleration transducers, fire-alarm sensors, water-level sensors, and magnetic contact sensors. It is also found that the wireless sensor network can deliver sensing data reliably by ad-hoc networking technology. The gateway system that can send the sensing data to server by CDMA (code division multiple access) is developed. Finally, monitoring system is constructed by web service technology, and it is observed that this system can monitor the present state of tunnel without difficulties. Furthermore, the above system provides an alternative to inspect and monitor the tunnel efficiently where the conventional wired system cannot be applied.

  • PDF

Tarsal Tunnel Syndrome Associated with Gout Tophi: A Case Report

  • Park, Sam Guk;Park, Chul Hyun;Ahn, Hyo Se
    • 대한족부족관절학회지
    • /
    • 제20권2호
    • /
    • pp.84-87
    • /
    • 2016
  • Tarsal tunnel syndrome is an entrapment neuropathy of the posterior tibial nerve or its branches in the fibro-osseous tunnel beneath the flexor retinaculum. This pathology is associated with multiple etiologies, including trauma, space-occupying lesions, and impaired biomechanics. We report a case of tarsal tunnel syndrome associated with gout tophi in a patient with untreated gout along with a review of the relevant literature on tarsal tunnel syndrome.

다변량분석을 이용한 터널에서의 효율적인 암반분류에 관한 연구 (A Study of Efficient Rock Mass Rating for Tunnel Using Multivariate Analysis)

  • 위용곤;노상림;윤지선
    • 한국터널지하공간학회 논문집
    • /
    • 제2권2호
    • /
    • pp.41-49
    • /
    • 2000
  • 지하 터널 굴착 등의 암반 공학적 문제에 있어서 암반분류가 널리 적용되고 있다. 하지만, 조사 방법이 체계화되어 있지 않아서 터널 지질 전문가라 할지라도 암반분류에 어려움이 많은 문제점을 가지고 있다. 본 연구에서는 다변량분석을 이용하여 객관적이고 사용하기 간편한 암반분류법을 제시하였다. RMR 요소는 RQD, 절리상태, 지하수, 강도, 보정, 절리간격 순으로 중요도가 결정되었으며, 각각의 단계에서 RMR에 관한 최적의 다중회귀모형식을 제시하였다.

  • PDF

복층터널 중간슬래브 유지관리에 따른 응력분포 특성 분석 (Characteristics of Middle Slab Stresses in Double-Deck Tunnel During Maintenance)

  • 조영교;이영훈;박범근;김성민
    • 한국도로학회논문집
    • /
    • 제19권6호
    • /
    • pp.47-56
    • /
    • 2017
  • PURPOSES : The purpose of this study is to investigate the stresses of the middle slab in a double-deck tunnel owing to the slab lift to replace the underlying elastic pads during maintenance work. METHODS : The middle slab was divided into three different sections: typical section, expansion joint section, and emergency passageway section. Finite element analysis models of these three sections of middle slab were developed, and the stress distribution and maximum stresses were obtained using the models when the middle slab was lifted to replace the underlying elastic pads. Various slab lifting methods were examined in this study such as one-, two-, and multiple-point lifts, distributed lifts, and one or both slab side edge lifts. RESULTS : When the slab side edge is lifted, the longitudinal stresses of the slab are almost the same as the principal stresses. This implies that the governing stresses are the longitudinal stresses. The maximum stresses with both-edge lifts are generally smaller than those with one-edge lifts at all three sections of middle slab. CONCLUSIONS : If the middle slab in a double-deck tunnel is lifted for maintenance, the slab should be lifted at multiple points along the longitudinal direction to reduce the tensile stresses.

도로터널 환기/제연 시스템 시뮬레이션 (A NUMERICAL STUDY OF THE VENTILATION AND FIRE SIMULATION IN A ROAD TUNNEL)

  • 박종택;원찬식;허남건;차철현
    • 한국전산유체공학회지
    • /
    • 제11권4호
    • /
    • pp.20-25
    • /
    • 2006
  • In the present study, flow characteristics inside a road tunnel are simulated for the ventilation flows due to jet fan system and flows induces by the traffic. Traffic ventilation is numerically simulated by multiple reference frame. From the results of steady state simulation of tunnel ventilation, it is found that the proper ventilation is achieved by the designed jet fan system along with ventilating flow induced by the traffic. A transient simulation is also performed for the case of vehicle fire in the tunnel reversing the direction of rotation of some fans. The results suggest that the heat and smoke can be controlled by the proper changing of fan operation mode. The present results can be used to design proper ventilation system and effective smoke control system as well.

Updates to the wind tunnel method for determining design loads in ASCE 49-21

  • Gregory A. Kopp
    • Wind and Structures
    • /
    • 제37권2호
    • /
    • pp.163-178
    • /
    • 2023
  • The paper reviews and discusses the substantive changes to the ASCE 49-21 Standard, Wind Tunnel Testing for Buildings and Other Structures. The most significant changes are the requirements for wind field simulations that utilize (i) partial turbulence simulations, (ii) partial model simulations for the flow around building Appurtenances, along with requirements for determining wind loads on products that are used at multiple sites in various configurations. These modifications tend to have the effect of easing the precise scaling requirements for flow simulations because it is not generally possible to construct accurate models for small elements placed, for example, on large buildings at the scales typically available in boundary layer wind tunnels. Additional discussion is provided on changes to the Standard with respect to measurement accuracy and data acquisition parameters, such as duration of tests, which are also related to scaling requirements. Finally, research needs with respect to aerodynamic mechanisms are proposed, with the goal of improving the understanding of the role of turbulence on separated-reattaching flows on building surfaces in order to continue to improve the wind tunnel method for determining design wind loads.

터널 스캐닝 다중 촬영 영상의 특징점 기반 접합 알고리즘 성능평가 (Performance of Feature-based Stitching Algorithms for Multiple Images Captured by Tunnel Scanning System)

  • 이태희;박진태;이승훈;박신전
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제26권5호
    • /
    • pp.30-42
    • /
    • 2022
  • 최근, 국내의 도심지와 수도권을 잇는 급행철도 사업, 간선도로 및 고속도로의 지중화 사업 등과 같이 교통 인프라 건설이 활발하게 추진되고 있으며 국토의 효율적인 활용을 위하여 지하 터널 및 산 터널의 시공이 활발해지고 있다. 터널 시공이 늘어남에 따라 콘크리트 구조물의 노후화로 인한 안전진단, 유지보수 및 관리의 필요성도 증대되고 있다. 본 논문에서는 인력에 의한 외관조사의 단점을 해결하고 터널 안전점검의 자동화를 위하여 터널 스캐닝영상을 통한 안전점검을 제시한다. 터널 스캐닝영상을 통한 안전점검은 기존 인력에 의한 외관조사에 비해 조사기간과 인력을 크게 줄일 수 있으며 조사자의 안전사고와 교통체증에 따른 사회적 비용을 절감할 수 있다는 장점이 있다. 터널 스캐닝영상 기반 안전점검을 위해서는 터널 스캐닝영상의 접합을 통하여 평면전개 이미지를 생성하는 것이 핵심이다. 본 연구에서는 터널 스캐닝영상 기반 안전점검의 필수기술인 터널 스캐닝 다중 촬영 영상 접합에 적합한 알고리즘에 대한 성능평가를 진행하였다. 터널이미지 접합에 유리한 알고리즘을 찾기 위하여 OpenCV에서 제공하는 특징점 검출 및 매칭 알고리즘 중 실수기술자와 높은 정확도를 갖는 SIFT, 이진기술자를 갖고 연산속도가 빠른 ORB, BRISK 총 3가지 알고리즘을 비교 분석하고자 한다. 터널이미지는 크게 콘크리트부, 조명부와 타일부로 나누어 터널이미지의 특성을 반영하였다. 터널이미지 접합에 유리한 알고리즘은 특징점 검출 개수, 연산속도, 특징점 매칭의 정확성, 영상접합 결과를 종합하여 판별하였다. 접합성능은 SIFT알고리즘이 가장 좋았으며 ORB, BRISK도 짧은 연산시간과 준수한 성능을 보였다. 연산시간보다 정확도가 중요시되는 정밀한 평면전개 이미지 생성에 SIFT가 활용될 수 있고 ORB와 BRISK도 준수한 접합결과를 보여줘 대용량 영상에서 빠른 영상처리 속도가 요구되는 작업이 필요할 경우 사용될 수 있는 가능성을 확인했다.

터널 중심선으로부터 이격된 자료를 활용한 미시추구간의 암반등급 산정에 관한 연구 (A study on the estimation of rock mass classes using the information off a tunnel center line)

  • 유광호;이상호;추석연;주광수
    • 한국터널지하공간학회 논문집
    • /
    • 제6권2호
    • /
    • pp.101-111
    • /
    • 2004
  • 터널의 안정성 확보 및 최적설계를 위해서, 충분한 지반조사 데이터를 확보하는 것이 가장 중요하나, 공간상에 분포하는 자료측정의 제한성 및 경제적인 이유로 그렇게 하지 못하는 것이 현실이다. 특히, 터널은 민원 및 산악지형 등의 이유로 노선의 본선부에서 시추가 불가능한 구간이 발생하고, 각종 물리탐사 자료만으로는 정량적인 암반등급 산정이 어렵다. 따라서, 본 연구에서는 이러한 문제점을 극복하기 위하여 본선에서 이격된 물리탐사 자료 및 시추데이터를 최대한 활용해 지구통계학 기법의 하나인 2차원 다분적 지시크리깅을 확장한 3차원 다분적 지시크리깅 (3D multiple indicator kriging, 3D-MI kriging)기법을 제안하였다. 또한 제안된 3차원 다분적 지시크리깅기법을 경부고속철도 제 ${\bigcirc}-{\bigcirc}$공구 터널설계 시 RMR분류에 의한 암반등급 산정을 위해 적용하였다.

  • PDF

연약지반 다수의 터널 병렬시공 시 기존터널의 거동 (The Behaviours of Existing Tunnels in response to Multiple side-by-side Tunnel Construction in Soft Ground)

  • 안성권
    • 한국구조물진단유지관리공학회 논문집
    • /
    • 제12권6호
    • /
    • pp.193-204
    • /
    • 2008
  • 본 논문은 연약지반에서 복수의 신규터널 시공을 모사하기 위해 실시된 모형실험 과정 및 결과에 대해 기술한다. 새로운 터널이 기존터널에 근접하여 시공될 때 기존터널의 거동을 조사하기 위해 1/50의 상사율로 모형실험이 실시되었다. 모형 터널은 압밀된 Speswhite Kaolin 점토에 시공되었으며, 오거 형상 굴착기와 실드로 구성된 터널굴착 장비가 사용되었다. 기존터널의 거동 계측을 위해 스트레인 게이지와 변형계가 사용되었다. 모형시험 분석 결과는 영국 Old Street 런던 지하철 Northern Line 확장공사 현장계측 결과와 비교되었다. 또한, 모형시험 결과는 동일한 실험기구 및 실험방법이 사용된 별도의 모형실험에서 계측된 지반변형 데이터와도 비교되었다.