• Title/Summary/Keyword: Multiple Case Construction

Search Result 154, Processing Time 0.025 seconds

An Experimental Approach to Multiple Case Constructions in Korean

  • Lee, Yong-Hun
    • Language and Information
    • /
    • v.17 no.2
    • /
    • pp.29-50
    • /
    • 2013
  • Multiple Nominative Constructions (MNCs) and Multiple Accusative Constructions (MACs) have been some of the hottest and interesting topics in Korean syntax. This paper took empirical approaches to these constructions and examined native speakers' grammaticality judgements of these constructions. Though there are lots of previous studies on these constructions, Ryu (2010, 2013a, 2013b, 2013c) recently tried to unify MNCs and MACs into Multiple Case Constructions (MCCs) and to classify them into 16 types based on the semantic relations. This paper includes experiments which were performed on these 16 different types. The experiments were designed following Johnson (2008); and the native speakers' intuition was measured with two scales, numerical estimates and line drawing, though the latter was adopted in the actual analyses. Through the experiment, the following facts were observed: (i) the grammaticality of the MCCs varies depending on their semantic relations, (ii) MNCs were more grammatical than MACs if both constructions occurred in similar environments, and (iii) the sentences in some MAC types had much lower grammaticality than those in the others, as Ryu (2013b, 2013c) mentioned.

  • PDF

A DECISION SUPPORT MODEL FOR PROCUREMENT OF REUSABLE MATERIALS IN MULTIPLE PROJECT MANAGEMENT

  • Ju-Yeoun Han;Dong-Woo Shin ;Kyung-Rai Kim ;Sang-yoon Chin;Hee-Sung Cha
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1100-1105
    • /
    • 2005
  • To compete with large construction companies whose dominance in market share is deepening recently, the needs for improving field production system of mid-size construction companies have increased rapidly. The development of an adequate model that focuses on the organizational size and work process of the mid-size construction companies are needed to increase productivity through the informatization in the construction industry[0]. The authors of this study used case studies on the problems of the mid-size construction companies in procuring work and presented a method to solve such problems so that the managers in head office of those mid-size construction companies can effecitively deal with multiple sites[0].

  • PDF

A CONCEPTUAL FRAMEWORK FOR CONCURRENT CONSTRUCTION PLANNING

  • Euysup Shim;Kenneth Reinschmidt
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.440-448
    • /
    • 2009
  • Concurrent construction (or overlapping) is an alternative project delivery process to reduce time-tomarket such that the owner can get higher profits; the increased profits due to shortened project duration would exceed the loss of profits from the increased cost, if any. For more effective concurrent construction, a new conceptual framework for concurrent construction planning is suggested. With multiple work methods available in each activity, the performance of overlapping between two activities in terms of cost is affected by the compatibility between work methods selected and the benefit to the project owner is determined by internal rate of return (RoR). The impact of the compatibility between work methods and the conceptual framework are explained by a hypothetical case study.

  • PDF

Optimization of Multiple Tower Cranes and Material Stockyards Layout (다중 양중장비와 자재 야적 위치의 최적 결정을 위한 모델 개발)

  • Kim, Kyong-Ju;Kim, Kyoung-Min;Lee, Sang-Kyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.127-134
    • /
    • 2009
  • This study aims to provide an optimal model for the layout of multiple tower cranes and material stockyards which have multiple candidate positions. In a high-rise building construction, the positional allocation of tower cranes and material stockyard has an effect on the travel time of material hauling. In addition, in case of using multiple tower cranes, specific location of a tower crane allocated to each material determines the efficiency of the works. Current optimal model limited to the optimization of position of single tower crane and material stockyards. This study suggests optimal model both for the positions of multiple tower cranes and material stockyards. Layout of multiple tower cranes requires additional allocation of each crane to each material hauling and control on the minimum distance between tower cranes. This optimization model utilizes genetic algorithm to deal with complex interaction on the candidate positions of multiple tower cranes, material stockyards, and types of materials. In order to identify its utility, case study was performed.

A Construction Theory of Combinational Multiple Valued Circuits by Modular Decomposition (모듈 분할 방식에 의한 조합 다치 논리 회로 구성이론)

  • 강성수;이주형;김흥수
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.14 no.5
    • /
    • pp.503-510
    • /
    • 1989
  • This paper represents a method which construct Combinational Mutiple Valued Logic circuits. First, it constructs Combinational Multiple Valued Logic Cell as the input variable, Then, it can be applied to the general case by expanding ti, thus these series of process is simple and regular. The construction theory of Combinational Multiple Valued Logic circuits, representes here has regularity, simplicity and modularity, especially, in case imput variables are incresed this theory also has characteristics of expansion.

  • PDF

Virtual Reality Safety Training on Multiple Platforms

  • Bao, Quy Lan;Tran, Si Van-Tien;Nguyen, Truong Linh;Park, Chansik
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1187-1193
    • /
    • 2022
  • A construction site is a highly complex and constantly changing environment, where hazardous areas are difficult to detect if workers lack sufficient knowledge and awareness. Thus, frequent worker safety training is required. Numerous studies on using virtual reality (VR) for safety training were published. While they demonstrate the potential for improving the skills necessary to avoid accidents in the construction industry, they remain difficult to apply at actual construction sites. VR requires specialized hardware and software, limiting workers' access and restricting workers' participation in training sessions. As a result, this paper proposes multiple platforms for immersive virtual reality safety training (VRMP) based on Industry Foundation Classes (IFC) and web technologies such as immersive web (WebXR). The VRMP is compatible with mobile and desktop devices currently by workers and demonstrates scenario models familiar to workers. Also, it reduces development time by utilizing Building Information Models (BIM). Additionally, The VRMP collects data from workers in a virtual environment to assess each worker's safety level, assisting workers in effectively and comfortably gaining a better understanding and raising their awareness. This paper develops a case study based on the VRPM in order to assess its effectiveness.

  • PDF

INVESTMENT EVALUATION OF TRANSPORTATION INFRASTRUTURE PROJECTS USING BINOMIAL REAL OPTION MODEL

  • Qiyu Qian;Xueqing Wang;Charles Y.J. Cheah
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.563-572
    • /
    • 2007
  • Transportation infrastructure is critical to economic growth of a country such as China. Careful evaluation of investments in traffic infrastructure projects is therefore pertinent. As traditional evaluation methods do not consider the uncertainty of future cash flows and mobility during project execution, the real option approach is gradually gaining recognition in the context of valuing construction and infrastructure projects. However, many of the cases only evaluate individual options separately although multiple options often exist in a typical large infrastructure project. Using a highway project in China as a case study, this paper first evaluates a deferment option and a growth option embedded in the project. Subsequently, the values are combined using the fuzzy analytical hierarchy process. It is found that the combined value is less than the sum of the two option values. This finding is consistent with the theoretical observations given in past real option literature despite the use of a different approach.

  • PDF

Estimating the Total Precipitation Amount with Simulated Precipitation for Ungauged Stations in Jeju Island (미계측 관측 강수 자료 생성을 통한 제주도 지역의 수문총량 추정)

  • Kim, Nam-Won;Um, Myoung-Jin;Chung, Il-Moon;Heo, Jun-Haeng
    • Journal of Korea Water Resources Association
    • /
    • v.45 no.9
    • /
    • pp.875-885
    • /
    • 2012
  • In this study, the total precipitation amount in Jeju Island was estimated with the simulated precipitation for ungauged stations missing precipitation data using the spatial precipitation analysis. The missing data were generated through the modified multiple linear regression in this study, and the analysis of spatial precipitation was conducted with the PRISM(Parameter-elevation Regression on Independent Slope Model). The generated data with modified multiple linear regression model have similar pattern with original data. Thus, the model in this study shows good applicability to estimate the missing data. The difference of annual average precipitation between Case 1 (original data) and Case 2 (modified data) appears very small ratio which is about 1.5%. However, the difference of annual average precipitation according to elevation shows the large ratio up to 37.4%. As the results, the method of estimating missing data in this study would be useful to calculate the total precipitation amount at the low station density area and the places with the high spatial variation of precipitation.

Stable modal identification for civil structures based on a stochastic subspace algorithm with appropriate selection of time lag parameter

  • Wu, Wen-Hwa;Wang, Sheng-Wei;Chen, Chien-Chou;Lai, Gwolong
    • Structural Monitoring and Maintenance
    • /
    • v.4 no.4
    • /
    • pp.331-350
    • /
    • 2017
  • Based on the alternative stabilization diagram by varying the time lag parameter in the stochastic subspace identification analysis, this study aims to investigate the measurements from several cases of civil structures for extending the applicability of a recently noticed criterion to ensure stable identification results. Such a criterion demands the time lag parameter to be no less than a critical threshold determined by the ratio of the sampling rate to the fundamental system frequency and is firstly validated for its applications with single measurements from stay cables, bridge decks, and buildings. As for multiple measurements, it is found that the predicted threshold works well for the cases of stay cables and buildings, but makes an evident overestimation for the case of bridge decks. This discrepancy is further explained by the fact that the deck vibrations are induced by multiple excitations independently coming from the passing traffic. The cable vibration signals covering the sensor locations close to both the deck and pylon ends of a cable-stayed bridge provide convincing evidences to testify this important discovery.

Translocal and Transnational Movements of Bugis and the Construction of Multiple Identities: The Case of Bugis in North Kalimantan of Indonesia and Sabah and Johor of Malaysia

  • Maunati, Yekti
    • SUVANNABHUMI
    • /
    • v.8 no.2
    • /
    • pp.15-49
    • /
    • 2016
  • It is widely known that the Bugis people, originally from South Sulawesi, have been migrating to many places, including both the Indonesian and Malaysian sides of the borders today. The translocal and transnational movements of the Bugis people, especially to North Kalimantan of Indonesia and Sabah and Johor of Malaysia, have occurred in several waves, particularly during the 17th century, around 1965 and from 1980 to the present. The fall of the kingdom of Somba Opu in South Sulawesi and the rise Dutch colonial power have been the triggers for the early movement of the Bugis to both the Indonesian and Malaysian borders. This was followed by the second push of the Islamic rebellion in South Sulawesi, around 1965, creating another big wave of Bugis movement. The most recent one has been mainly due to economic reasons. These different phases of the movements, as well as the dynamic interplay of various aspects, such as citizenship, ethnic, and sub-ethnic groupings, practicing of cultural traditions and keeping the language, to mention a few, have contributed to the process of the construction of the multiple identities of the Bugis. Indeed, the Bugis people are no longer identified or identify themselves as a single group, but rather have fluid and contesting identities. This paper will discuss three main issues: the history of the translocal and transnational movements of the Bugis to North Kalimantan, Sabah and Johor; the process of adaptation to these new places; and the construction of Bugis identities.

  • PDF