• Title/Summary/Keyword: Multi-story building

Search Result 171, Processing Time 0.022 seconds

IDENTIFICATION OF MODAL PARAMETERS BY SEQUENTIAL PREDICTION ERROR METHOD (순차적 예측오차 방법에 의한 구조물의 모우드 계수 추정)

  • Lee, Chang-Guen;Yun, Chung-Bang
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1990.10a
    • /
    • pp.79-84
    • /
    • 1990
  • The modal parameter estimations of linear multi-degree-of-freedom structural dynamic systems are carried out in time domain. For this purpose, the equation of motion is transformed into the autoregressive and moving average model with auxiliary stochastic input (ARMAX) model. The parameters of the ARMAX model are estimated by using the sequential prediction error method. Then, the modal parameters of the system are obtained thereafter. Experimental results are given for a 3-story building model subject to ground exitations.

  • PDF

Enhancing the Fire Performance of Concrete-Filled Steel Columns through System-Level Analysis

  • Fike, R.S.;Kodur, V.K.R.
    • International Journal of High-Rise Buildings
    • /
    • v.2 no.1
    • /
    • pp.11-21
    • /
    • 2013
  • The use of concrete filling offers a practical alternative for achieving the required stability of steel Hollow Structural Section (HSS) columns under fire conditions. However, current methods for evaluating fire resistance of Concrete Filled Hollow Structural Steel (CFHSS) columns are highly conservative as they are based on an elemental approach without due consideration to structural interactions that occur in framed structural systems. To overcome this limitation, a system level fire resistance analysis was carried out by treating CFHSS columns as part of an overall structural frame. In this analysis, an eight story steel-framed building was modeled under a range of standard and performance-based fire scenarios (including multi-story progressive burn-out fires) to evaluate the contribution of various structural members/assemblies to overall fire resistance. One of the primary factors considered was the use of concrete filling in HSS columns as an alternative to standard W-shape columns. Results from the analysis indicate that the use of CFHSS columns, in place of W-shape columns, in a performance-based environment can fully eliminate the need for applied fire protection to columns, while providing the required level of structural fire resistance.

Closed-form fragility analysis of the steel moment resisting frames

  • Kia, M.;Banazadeh, M.
    • Steel and Composite Structures
    • /
    • v.21 no.1
    • /
    • pp.93-107
    • /
    • 2016
  • Seismic fragility analysis is a probabilistic decision-making framework which is widely implemented for evaluating vulnerability of a building under earthquake loading. It requires ingredient named probabilistic model and commonly developed using statistics requiring collecting data in large quantities. Preparation of such a data-base is often costly and time-consuming. Therefore, in this paper, by developing generic seismic drift demand model for regular-multi-story steel moment resisting frames is tried to present a novel application of the probabilistic decision-making analysis to practical purposes. To this end, a demand model which is a linear function of intensity measure in logarithmic space is developed to predict overall maximum inter-story drift. Next, the model is coupled with a set of regression-based equations which are capable of directly estimating unknown statistical characteristics of the model parameters.To explicitly address uncertainties arise from randomness and lack of knowledge, the Bayesian regression inference is employed, when these relations are developed. The developed demand model is then employed in a Seismic Fragility Analysis (SFA) for two designed building. The accuracy of the results is also assessed by comparison with the results directly obtained from Incremental Dynamic analysis.

Control of Smart Base-isolated Benchmark Building using Fuzzy Supervisory Control (퍼지관리제어기법을 이용한 스마트 면진 벤치마크 건물의 제어)

  • Kim, Hyun-Su;Roschke P. N.
    • Journal of the Earthquake Engineering Society of Korea
    • /
    • v.9 no.4 s.44
    • /
    • pp.55-66
    • /
    • 2005
  • The effectiveness of fuzzy supervisory control technique for the control of seismic responses of smart base isolation system is investigated in this study. To this end, first generation base isolated building benchmark problem is employed for the numerical simulation. The benchmark structure under consideration is an eight-story base isolated building having irregular plan and is equipped with low-damping elastometric bearings and magnetorheological (MR) dampers for seismic protection. Lower level fuzzy logic controllers (FLC) for far-fault or near-fault earthquakes are developed in order to effectively control base isolated building using multi-objective genetic algorithm. Four objectives, i.e. reduction of peak structural acceleration, peak base drift, RMS structural acceleration and RMS base drift, are used in multi-objective optimization process. When earthquakes are applied to benchmark building, each of low level FLCs provides different command voltage and supervisory fuzzy controller combines two command voltages io one based on fuzzy inference system in real time. Results from the numerical simulations demonstrate that base drift as well as superstructure responses can be effectively reduced using the proposed supervisory fuzzy control technique.

A Study on Multi-story Building Users' Opinions about the Installation of Emergency Plumbing Equipment for Preventing the Spread of Water Leakage (다층건물 사용자의 누수확대 방지용 비상배수설비 설치에 대한 의견 연구)

  • Yeon, Cheol-Soo;Seo, Jin-Hyeong
    • Journal of the Korean housing association
    • /
    • v.27 no.4
    • /
    • pp.59-66
    • /
    • 2016
  • The purpose of this study is to examine the necessity of 'emergency plumbing equipment for preventing the spread of water leakage'. It reviews social and economic costs when there is spread of water leakage and finds out that those are enormous. Expansion of water leakage causes conflicts between neighbors, economic loss and inconvenience from damages on facilities like elevator and power failure. Next, it examines the inability of existing plumbing equipment when it comes to spread of water leakage. Newly defined 'Surface Leakage' means rapid leak in the surface, and 'Internal Leakage' means seeping out slowly and gradually buried in the pipeline. It will also be analyzed by separating the concept of a leak in the two concepts of a 'Surface Leakage' and 'Internal Leakage'. It proposes emergency plumbing equipment for preventing the spread of water leakage as a solution for the expansion of water leakage. It explains general concepts of emergency plumbing equipment for preventing the spread of water leakage. It will also examine the effectiveness of the user by performing a survey of 420 multi-level building their opinion on the effects of an emergency plumbing equipments to prevent the spread of water leakage.

The Structural Engineering Design And Construction Of The Tallest Building In Europe Lakhta Center, St. Petersburg. Russia

  • Abdelrazaq, Ahmad;Travush, Vladimir;Shakhvorostov, Alexey;Timofeevich, Alexander;Desyatkin, Mikhail;Jung, Hyungil
    • International Journal of High-Rise Buildings
    • /
    • v.9 no.3
    • /
    • pp.283-300
    • /
    • 2020
  • The Lakhta Center is a Multifunction Complex Development (MFCD) consisting of 1) an 86 story office tower rising 462 m above the ground to provide high-end offices for Gazprom Neft and Gazprom Group affiliates 2) a Multi-Function Building (MFB) that includes, a scientific/educational center, a sport center, a children's technopark, a planetarium, a multi-transformable hall, an exhibition center, shops, restaurants, and other public facilities 3) a Stylobate 4) "The Arch, which forms the main entrance to the tower, restaurants, and cafes 5) underground parking and 6) a wide range of large public plazas. While each of the MFCD buildings is technically challenging in its own right, the focus of the paper is to present the development and integration of the structural and foundation systems of the bowed, tapered, and twisted shape of the tower into the fabric of the tallest Tower in Europe.

Grand M Hotel interior renovation (포항 Grand M Hotel, 리노베이션 계획안)

  • Kim, Hye-Ja
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2006.05a
    • /
    • pp.97-98
    • /
    • 2006
  • This study proposes a method of generating steel house shop drawing in an automated design method, reducing construction manpower and period. With one hour fire-resistant approval code, reflecting work ability and efficiency, steel-framed house market is expected to extend from one or two story house to multi-purpose facilities up to four story height. More models have been constructed in this system than the first appearance of fire-resistant approval in Korea in 1997 Also, cost estimation of components such as frame walls, roof trusses and floors is obtained with shop drawings. Also, the lack of suppliers of steel framed house shop drawing and unstandardized drawing method get constructors have difficulty in understanding its design. In steel framed house industry, shop drawings are essential part in building and constructing framework and they have major effects on construction deadlines and expenses. By exploring method of shop drawing automation, this study aims to optimize work flow with a standardized drawing method. The proposed system can be applied to manufacturing automation in domestic industry of factory-built panelizing method in the near future.

  • PDF

Estimation of floor response spectra induced by artificial and real earthquake ground motions

  • Pu, Wuchuan;Xu, Xi
    • Structural Engineering and Mechanics
    • /
    • v.71 no.4
    • /
    • pp.377-390
    • /
    • 2019
  • A method for estimating the floor response spectra (FRS) of elastic structures under earthquake excitations is proposed. The method is established based on a previously proposed direct estimation method for single degree of freedom systems, which generally overestimates the FRS of a structure, particularly in the resonance period range. A modification factor is introduced to modify the original method; the modification factor is expressed as a function of the period ratio and is determined through regression analysis on time history analysis results. Both real and artificial ground motions are considered in the analysis, and it is found that the modification factors obtained from the real and artificial ground motions are significantly different. This suggests that the effect of ground motion should be considered in the estimation of FRS. The modified FRS estimation method is further applied to a 10-story building structure, and it is verified that the proposed method can lead to a good estimation of FRS of multi-story buildings.

Transformation of Shophouses in Phnom Penh, Cambodia: In the Aspect of Spatial Organization (캄보디아 프놈펜의 숍하우스의 변형에 관한 연구: 공간조직적 측면에서)

  • Yam, Sokly;Ju, Seo Ryeung
    • Human Ecology Research
    • /
    • v.54 no.1
    • /
    • pp.13-26
    • /
    • 2016
  • The purpose of this paper is to investigate the rationale behind the transformation process of unique shophouse spatial organization in Phnom Penh. We selected 20 representative shophouses located in the Chinese district of Phnom Penh according to construction period. A qualitative study methodology was applied and field surveys were conducted that included interviews with residents, photographs, sketches, measurements, collecting historic photos, and cataloging maps. Selected cases were analyzed in terms of: basic house data, urban block analysis, and unit analysis. Cases were then classified into two types: private courtyard shophouse (PCS) and shared courtyard shophouse (SCS). PCS refers to shophouse typology that maintains most of the characteristics of early shophouses while being transformed into a modern multi-story apartment within a limited one bay plot. However, SCS refers to shophouses adapted from the indigenous forms of PCS that evolved into a multi-storey and multi-family housing typology that includes features that might have been adapted from Western apartment buildings such as sharing a big courtyard, staircase and corridors. We conclude that shophouses in Phnom Penh have positively adopted a Western building typology, adapted it to local traditions, and finally formulated a new building type that represent indicators of a modernization process gradually accepted by society.

Analysis of Air Flow Rate Distribution for the Bathroom Exhaust System in High-rise Buildings Using T-method (T-method를 이용한 고층 아파트 욕실 배기 시스템의 층별 유량분배 해석)

  • 문종선;강석윤;이승철;유호선;이재헌
    • Korean Journal of Air-Conditioning and Refrigeration Engineering
    • /
    • v.16 no.3
    • /
    • pp.265-272
    • /
    • 2004
  • Based on the T-method, a new scheme for predicting air flow rate distribution in a bathroom exhaust system is developed. Introduction of individual duct route enables us to disintegrate a complicated multi-fan ductwork into a set of simultaneous single-fan subsystems. The scheme is validated via the analysis of a well-posed test problem, showing physical consistency. In order to demonstrate the utility and capability of our method, the bathroom ventilation system in a 20-story residential building is selected as an example. Under the typical design condition, the air flow rate of each exhaust fan at the balancing point is successfully predicted, and such information can lead to an engineering estimation for the overall system performance. While some deficiencies in ventilation are found at bathrooms at lower floors with 6mmAq-rated exhaust fans, they disappear over the whole building by using fans of enhanced static pressures, 7 and 8mmAq. Finally the present scheme seems to be useful for practical design of multi-branched, multi-fan ventilation systems.