• Title/Summary/Keyword: Multi-purpose Dam

Search Result 127, Processing Time 0.024 seconds

Study on Comparison of Methods for Estimation of Shear Wave Velocity in Core Zone of Existing Dam (기존 댐 코어죤의 전단파속도 산정기법 비교 연구)

  • Ha, Ik-Soo;Oh, Byung-Hyun
    • Journal of the Korean Geotechnical Society
    • /
    • v.24 no.10
    • /
    • pp.33-43
    • /
    • 2008
  • In this study, for the purpose of evaluating the shear wave velocity in core zone, cross-hole test, down-hole test, MASW (Multi-channel Analysis of Surface Wave), and seismic reflection survey were carried out on the crest of the existing 'Y' dam. The results of field tests were compared one another. Furthermore, the field test results were compared with the result by the Sawada's empirical recommendation method. The purpose of this study is to compare the results of four kinds of field tests for evaluation of shear wave velocity in core zone of existing dam, to verify applicability of the empirical method which was recommended by Sawada and Takahashi, and to recommend a reasonable method for evaluation of shear wave velocity which is needed to evaluate tile maximum shear modulus of core zone. From the results of four kinds of field tests such as cross-hole test, down-hole test, MASW, and seismic reflection survey, it was found that the shear wave velocity distributions were similar within 18 m in depth and the results obtained by MASW and seismic reflection survey were almost the same by 30 m in depth. For evaluation of shear wave velocity in core zone of the existing dam, in consideration that it is not easy to bore the hole ill the core zone of existing dam, surface surveys such as MASW and seismic reflection method are recommended as realistic methods. On condition that it is impossible to conduct the field test and it is preliminary investigation, it is recommended that Sawada's low bound empirical equation be used.

Estimation of Agricultural water demand considering multi-wide water supply system - On irrigation area of Sumjingang-dam - (광역 용수계통을 고려한 농업용수 필요수량의 산정 - 섬진강댐 수혜구역을 중심으로 -)

  • Moon, Jong-Won;Chung, Jin-Ho;Jang, Jung-Seok
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.423-426
    • /
    • 2003
  • The purpose of this paper is to estimate Agricultural water demand at irrigation area of sumjin reservoir, the Dongjin River basin, which consist of multi-wide water supply system and complicated irrigation channel and supplementary irrigation facilities.

  • PDF

IMPROVING THE ESP ACCURACY WITH COMBINATION OF PROBABILISTIC FORECASTS

  • Yu, Seung-Oh;Kim, Young-Oh
    • Water Engineering Research
    • /
    • v.5 no.2
    • /
    • pp.101-109
    • /
    • 2004
  • Aggregating information by combining forecasts from two or more forecasting methods is an alternative to using forecasts from just a single method to improve forecast accuracy. This paper describes the development and use of a monthly inflow forecast model based on an optimal linear combination (OLC) of forecasts derived from naive, persistence, and Ensemble Streamflow Prediction (ESP) forecasts. Using the cross-validation technique, the OLC model made 1-month ahead probabilistic forecasts for the Chungju multi-purpose dam inflows for 15 years. For most of the verification months, the skill associated with the OLC forecast was superior to those drawn from the individual forecast techniques. Therefore this study demonstrates that OLC can improve the accuracy of the ESP forecast, especially during the dry season. This study also examined the value of the OLC forecasts in reservoir operations. Stochastic Dynamic Programming (SDP) derived the optimal operating policy for the Chungju multi-purpose dam operation and the derived policy was simulated using the 15-year observed inflows. The simulation results showed the SDP model that updated its probability from the new OLC forecast provided more efficient operation decisions than the conventional SDP model.

  • PDF

Monitoring on Regenerated Process of Natural Vegetation Using Recycling Eco-Revegetation Technique -A Case Study for the Rear-slope of Jangheung Multi-purpose Dam- (리싸이클링에코녹화공법을 이용한 자연식생 재현 모니터링 -장흥다목적댐 배면부를 대상으로-)

  • Kim, Sung-Hyun;Oh, Koo-Kyoon
    • Korean Journal of Environment and Ecology
    • /
    • v.20 no.1
    • /
    • pp.1-8
    • /
    • 2006
  • The objective of this study was to monitor the regenerated process of natural vegetation on the rear-slope of Jangheung multi-purpose dam using the recycling eco-revegetation technique. The monitoring plots were established in May 2004 and the plots were monitored in May 2004 and October 2005. Flora, plant community structures, naturally introduced plants, death rates were monitored. The change of flora after wood chip mulching decreased in family and species, but the influence of vine tree was extended. The urbanization index declined. Naturally introduced species and death ratios at the monitoring plot had a tendency to a higher increase in the deciduous broad-leaved forest.

Evaluation of hydropower dam water supply capacity (I): individual and integrated operation of hydropower dams in Bukhan river (발전용댐 이수능력 평가 연구(I): 북한강수계 개별 댐 및 댐군 용수공급능력 분석)

  • Jeong, Gimoon;Choi, Jeongwook;Kang, Doosun;Ahn, Jeonghwan;Kim, Taesoon
    • Journal of Korea Water Resources Association
    • /
    • v.55 no.7
    • /
    • pp.505-513
    • /
    • 2022
  • Recently, uncertainty in predicting available water resources is gradually increasing due to climate change and extreme weather conditions. Social interest in water management such as flood and drought prevention is also increasing, and after the unification of water management implemented in 2018, domestic water management is facing a major turning point. As part of such strengthening of water management capabilities, various studies are being conducted to utilize a hydropower dam for flood control and water supply purposes, which was mainly operated for hydroelectric power generation. However, since the dam evaluation methods developed based on a multi-purpose dam are being applied to hydropower dams, an additional evaluation approach that can consider the characteristics of hydropower dams is required. In this study, a new water supply capacity evaluation method is presented in consideration of the operational characteristics of hydropower dams in terms of water supply, and a connected reservoir simulation method is proposed to evaluate the comprehensive water supply capacity of a dam group operating in a river basin. The presented method was applied to the hydropower dams located in the Bukhan River basin, and the results of the water supply yield of individual dams and multi-reservoir systems were compared and analyzed. In the future, the role of hydropower dams for water supply during drought is expected to become more important, and this study can be used for sustainable domestic water management research using hydropower dams.

A Study for Storage Reallocation of Multipurpose Reservoir(I) - Flood Control Storage Analysis (다목적댐 용량 재할당에 대한 연구(I)- 치수용량 분석)

  • Yi, Jae-Eung;Kwon, Yong-Ik;Yoon, Young-Nam;Ahn, Tae-Jin
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.4
    • /
    • pp.273-281
    • /
    • 2004
  • Generally, reservoir storage is allocated according to planned purposes established before construction and operating policies are established through release control. The established reservoir allocation is hardly changed unless the special cases such as raising dam or changed purposes occur It Is, however, likely that public needs and objectives can be changed as time go on, the study for multipurpose reservoir storage reallocation is performed as an alternative to reflect these. In this study, flood control analysis is performed for several alternatives of reallocation for the Daechung multi-purpose reservoir in Geum river. As a result, it is confirmed that flood control capability is not decreased compared to single operation of Daechung reservoir for the same flood condition even if conservation level of Daechung multi-purpose reservoir is increased.

A Study on Objective Functions for the Multi-purpose Dam Operation Plan in Korea (국내 다목적댐 운영계획에 적합한 목적함수에 관한 연구)

  • Eum, Hyung-Il;Kim, Young-Oh;Yun, Ji-Hyun;Ko, Ick-Hwan
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.9 s.158
    • /
    • pp.737-746
    • /
    • 2005
  • Optimization is a process that searches an optimal solution to obtain maximum or minimum value of an objective function. Many researchers have focused on effective search algorithms for the optimum but few researches were interested in establishing the objective function. This study compares two approaches for the objective function: one allows a tradeoff among the objectives and the other does not allow a tradeoff by assigning weights for the absolute priority between the objectives. An optimization model using sampling stochastic dynamic programming was applied to these two objective functions and the resulting optimal policies were compared. As a result, the objective function with no tradeoff provides a decision making process that matches practical reservoir operations than that with a tradeoff allowed. Therefore, it is more reasonable to establish the objective function with no a tradeoff among the objectives for multi-purpose dam operation plan in Korea.

Hydration Heat Analysis of Seongdeok Cofferdam (성덕 다목적댐 가물막이댐의 수화열 해석)

  • Kim, Jin-Keun;Chu, In-Yeop;Jang, Bong-Seok;Ha, Jae-Dam;Park, Byung-Kook;Kim, Jeong-Soo
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.11a
    • /
    • pp.481-484
    • /
    • 2008
  • The temperature crack of concrete structure is caused by the phenomenon which the concrete volume is restricted in the inside or outside part due th the temperature variations induced by the hydration heat of cement. And mass concrete structures are weak in temperature crack. Seongdeok multi-purpose dam is gravity dam which is being constructed in Cheongsong-gun, Gyeonsangbuk-do. Upstream cofferdam was constructed to examine the temperature crack due to hydration heat and to decide the height of placement. Therefore this study performed the hydration heat analysis of Seongdeok upstream coffer dam to analyze the hydration heat according to different height of placement and to compare with measured results.

  • PDF

The Analysis of Assessment Factors for Preliminary Feasibility Study of Dam Project in Korea (국책사업 예비타당성조사 평가항목별 중요도 분석 - 댐 개발사업을 중심으로 -)

  • Koo, Jakon;Lee, Muchoon
    • Journal of Environmental Impact Assessment
    • /
    • v.13 no.6
    • /
    • pp.307-314
    • /
    • 2004
  • Among large developmental projects, those of the government and public institutions with the total budget of more than 50billion wons can be executed only when the feasibility of the project has been testified through the procedure of preliminary feasibility study. Multi-purpose dams are public structures that can supply water, produce electricity, and control flood, they belong to large national projects that require legal evaluation procedures such as preliminary feasibility study and environmental impact assessment(EIA). The index that should be considered to be important in dam plan is the migration of residents in submerged district. The importance in the preliminary feasibility study is 4.93 points(98.6 in the scale of 100 at maximum). Among the 12 assessment elements of the policy and economy in the preliminary feasibility study, the element of environment assessment is turned out to be 4.68 points in the assessment importance (93.5 in the scale of 100 at maximum), which is the second in the total ranking and the first in the field of policy, indicating that the element is very important in dam construction planning.

Evaluation of Eco-Hydrological Changes in the Geum River Considering Dam Operations : II. Hydraulic Fish Habitat Condition Analysis (댐 운영을 고려한 금강의 생태.수문학적 변화 평가 : II. 수리학적 어류서식처 조건 분석)

  • Park, Sang-Young;Kim, Jeong-Kon;Ko, Ick-Hwan
    • Journal of Korea Water Resources Association
    • /
    • v.42 no.5
    • /
    • pp.407-414
    • /
    • 2009
  • A quantitative analysis was conducted to study the impacts of artificial flow alteration on fish habitate condition change in the Geum River downstream the Daechung Multi-purpose Dam (DMD). River Analysis Package (RAP) was employed for the analysis and three fish species of black shiner, long nose barbel and Korean shinner were selected as icon species. The results of the analysis showed enhaced fish habitat conditions during low flow seasons in spring and fall after DMD construction, while the impact of the Youngdam Multipurpose Dam located upstream the DMD was insignificant. This result could be attributed to the fact that the increased flow during dry seasons helped create preferable habitat conditions for the fish species tested in this study.