• 제목/요약/키워드: Multi-Complex Project

검색결과 71건 처리시간 0.025초

입체·복합 프로젝트에서 발주자 중심의 WBS 구축방향 (An Establishment the Work Breakdown Structure for Owners in the Multi-Complex Project)

  • 고대준;최은아;서용칠;이상범
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.127-131
    • /
    • 2008
  • The successful project management is based on definition of project goals in construction industry. The WBS(Work Breakdown Structure) is one of the major factors which defines works related to project goals. The necessity of the WBS for owners in multi complex projects which would help them to understand the whole project is rising because the multi-complex project in the construction industry has increasing recently. Therefore, this study suggests directions to establish the WBS for owners through investigating a concept of the multi-complex project first and analyzing types of project, domestic and foreign WBS, and case studies.

  • PDF

MULTI-SCALE MODELING AND ANALYSIS OF CONVECTIVE BOILING: TOWARDS THE PREDICTION OF CHF IN ROD BUNDLES

  • Niceno, B.;Sato, Y.;Badillo, A.;Andreani, M.
    • Nuclear Engineering and Technology
    • /
    • 제42권6호
    • /
    • pp.620-635
    • /
    • 2010
  • In this paper we describe current activities on the project Multi-Scale Modeling and Analysis of convective boiling (MSMA), conducted jointly by the Paul Scherrer Institute (PSI) and the Swiss Nuclear Utilities (Swissnuclear). The long-term aim of the MSMA project is to formulate improved closure laws for Computational Fluid Dynamics (CFD) simulations for prediction of convective boiling and eventually of the Critical Heat Flux (CHF). As boiling is controlled by the competition of numerous phenomena at various length and time scales, a multi-scale approach is employed to tackle the problem at different scales. In the MSMA project, the scales on which we focus range from the CFD scale (macro-scale), bubble size scale (meso-scale), liquid micro-layer and triple interline scale (micro-scale), and molecular scale (nano-scale). The current focus of the project is on micro- and meso-scales modeling. The numerical framework comprises a highly efficient, parallel DNS solver, the PSI-BOIL code. The code has incorporated an Immersed Boundary Method (IBM) to tackle complex geometries. For simulation of meso-scales (bubbles), we use the Constrained Interpolation Profile method: Conservative Semi-Lagrangian $2^{nd}$ order (CIP-CSL2). The phase change is described either by applying conventional jump conditions at the interface, or by using the Phase Field (PF) approach. In this work, we present selected results for flows in complex geometry using the IBM, selected bubbly flow simulations using the CIP-CSL2 method and results for phase change using the PF approach. In the subsequent stage of the project, the importance of effects of nano-scale processes on the global boiling heat transfer will be evaluated. To validate the models, more experimental information will be needed in the future, so it is expected that the MSMA project will become the seed for a long-term, combined theoretical and experimental program.

공동주택단지의 개발계획단계 시 에너지 수요예측 프로세스에 관한 연구 (A Study on the Process of Energy Demand Prediction of Multi-Family Housing Complex in the Urban Planning Stage)

  • 문선혜;허정호
    • 한국태양에너지학회:학술대회논문집
    • /
    • 한국태양에너지학회 2008년도 춘계학술발표대회 논문집
    • /
    • pp.304-310
    • /
    • 2008
  • Currently energy use planning council system is mandatory especially for the urban development project planned on a specified scale or more. The goal of existing demand prediction was to calculate the maximum load by multiplying energy load per unit area by building size. The result of this method may be exaggerated and has a limit in the information of period load. The paper suggests a new forecasting process based on standard unit household in order to upgrade the limit in demand prediction method of multi-family housing complex. The new process was verified by comparing actual using amount of multi-family housing complex to forecasting value of energy use plan.

  • PDF

PM이 적용된 복합문화공간 개발사례 연구 (A Case Study of Complex-Cultural-Space Development by Importing the PM)

  • 마은주;박부미
    • 디자인학연구
    • /
    • 제19권5호
    • /
    • pp.281-292
    • /
    • 2006
  • 현대 도시공간은 단순주거환경에서 문화, 복지, 환경을 포괄하는 다기능 충족공간으로 급격하게 패러다임이 변화하고 있으며, 이러한 요구에 따라 문화적 이미지의 가치 창출에 대한 필요성과 질적인 성장관리가 중요한 이슈로 대두되고 있는 실정이다. 이에 본 연구에서는 복합공간개발계획에 있어 문화콘텐츠를 개발 도입한 성공사례의 연구 분석을 통해 각 개발 사례별로 문화콘텐츠영역을 추출하여 문화콘텐츠와 공간이 어떻게 연계되어 새로운 복합문화공간으로 조성될 수 있는지 살펴본다 또한 각 개발사례별 PM(Project management)과 PMr (Project Manager)의 범위와 역할에 대한 분석을 바탕으로 통합적이고 체계적인 관리시스템의 중요성을 인식한다. 따라서 이러한 PM과 PMr의 타당성에 대한 인식과 더불어 다양한 복합문화공간개발에 있어서 통합적 계획과 관리시스템으로 가장 효과적인 방법인 PM의 적용이 향후 복합공간개발의 질적인 향상을 가능하게 하는 새로운 대안의 기반이 될 것으로 기대한다.

  • PDF

BIM을 활용한 다중복합 프로젝트의 인트라넷 기반 통합사업관리체계 구축 방안 (Development of intranet-based Program Management Information System of multi-complex project with application of BIM)

  • 송일갑;허영란;서종원
    • 한국BIM학회 논문집
    • /
    • 제2권1호
    • /
    • pp.27-39
    • /
    • 2012
  • 공공사업의 경우 다중 프로젝트, 메가 프로젝트 등 다양한 발주형태로 건설사업이 추진됨에 따라 복합적이고 다원적인 관리가 필요하다. 건설사업관리를 효과적으로 하기 위하여 PMIS가 널리 사용되고 있으나 현재 대다수의 PMIS는 단일프로젝트 중심으로 개발되어있어 전체 사업관리를 위한 시스템 통합과정에서 시스템 간의 호환성 문제가 발생한다. 또한 공공사업 중심으로 사업과정에서 BIM을 적용하도록 한 발주가 증가하였으나, 아직까지 BIM을 활용한 사업관리를 위한 BIM 데이터 연계 PMIS의 개발 및 연구가 부족한 실정이다. 따라서 본 연구에서는 PMIS As-Is분석과 To-Be분석을 통해 다중복합 프로젝트 PMIS의 주요 목표기능을 도출하고 Internet-Intranet의 이원화 관리체계를 분석하여 통합사업관리체계를 적용한 PMIS 발전모델과, 상용 BIM Tool과 PMIS를 직접 결합하는 방식이 아닌 BIM 기술의 순차적인 적용방안을 통하여 통합사업관리시스템에 적합한 BIM 기반 PMIS 구축방안을 제시하여, 궁극적으로 BIM 기술의 활성화에 대비한 단계별 PMIS 발전 모델을 제안하는데 그 목적이 있다.

RESEARCH AND DEVELOPMENT OF PROGRAM MANAGEMENT SUPPORTING SYSTEM

  • Tetsuya Yamada;Shigehiko Tanabe
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.480-489
    • /
    • 2007
  • Program management is a concept to deal with huge and complex business activities from social, economical, cultural and environmental points of view and increase their value for client and society. The aim of this study is to establish a framework of program management process and develop a supporting system for program management. In this paper we propose a framework and a proto type supporting system based on case studies and report the result of application to an urban redevelopment using partially implemented software.

  • PDF

e-비즈니스 IT 프로젝트 관리의 정성적 접근 모형의 개발 (A Qualitative Approach to eIT Project Management)

  • 정기호
    • 한국IT서비스학회지
    • /
    • 제1권1호
    • /
    • pp.45-55
    • /
    • 2002
  • This paper suggests a new approach to IT project management based on a regular project meeting results to consider the recent project environment. The greater part of recent IT projects are related to e-business transformation. Transforming to e-business is a new problem very different from those they have been worked, in several point of views. Under e-business era, therefore any IT project is being implemented in more complex, dynamic and uncertain environment than traditional. That is, project leaders must consider more factors to control projects including resources, quality, risks, and technologies, and human resources. The project organizations and software corporations thus need to develop and establish new concepts or methodologies to manage e-business projects. In this point of view, an entropy model in this study is introduced for estimating and managing the uncertainty in project control using multi-attributes of project meeting. This paper proposes a new frame work based on entropy model using project meeting results to consider eIT project environment with a small pilot study.

Decision-making Reliability Estimation Model based on Building Construction Project Participants' Experience

  • Kim, Chang-Won;Kim, Baek-Joong;Yoo, Wisung;Cho, Hunhee;Kang, Kyung-In
    • 한국건축시공학회지
    • /
    • 제13권2호
    • /
    • pp.148-158
    • /
    • 2013
  • Generally, building construction projects have a complex decision-making process because of the participation of various agents. In this situation, a final decision is arrived at by relying on subjective judgments based on the experience of project participants. For this reason, a method of assessing the objectivity of opinions is needed. In previous studies, the multi-criteria decision making method was applied to arrive at a final decision objectively, but this method has a limitation, in that the experience of each decision maker is not considered differently in the decision making process. Therefore, this study proposed a theoretical model using the S-shaped growth curve and regression analysis by building construction project type to quantitatively estimate decision-making reliability according to the experience of individual project participant`s. The developed model could be added to the Multi-criteria decision making method, and secure the objectivity and reliability of project participants' final opinion.

복합 공간 구성 건물의 공조구역 운영 전략에 따른 에너지부하 특성 연구 (Study on the Operation Strategy of A Building with Multi-Complex Spaces)

  • 육인수;김민환;남현진;김동호;설동문;이건태;김진호;김재민
    • 대한설비공학회:학술대회논문집
    • /
    • 대한설비공학회 2009년도 하계학술발표대회 논문집
    • /
    • pp.108-113
    • /
    • 2009
  • Buildings with multi-complex spaces designed for architectural values and functional requirements give rise to technical challenges in terms of energy efficiency and thermal comfort. Since spaces in such buildings are connected with openings with geometrical complexity, it is hard to define zoning plan and to control heating/cooling loads effectively. This paper presents a case study on the evaluation of operation strategy for a building with multi-complex spaces using computer simulation. The modelling methodology and the results of the simulations are also described.

  • PDF

DATA WAREHOUSE PROTOTYPE SYSTEM TO SUPPORT THE MASTER PLAN OF URBAN REGENERATION PROJECT

  • Dong-Hyun Cho;Sang-Geum Lee;Hyung-Jin Park;Kyo-Jin Koo
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.361-368
    • /
    • 2009
  • In the Urban Regeneration Project, the scale becomes huge and the composition of participating organizations is complex. It is necessary to establish the master plan fast and effectively harmonize conflict options and interests in the early stage of the project. However, the master planner, who is tasked to establish the master plan, and the master planning team, are difficult to establish the master plan fast while effectively considering various and complex information related to regeneration. The Urban Regeneration Project is composed of various types of computer files like HWP, EXL, PDF, DWG and others. When the master plan is established, it is necessary to link the information items and physical files of urban generation in order to effectively save the files in storage for easy search and utilization. This study developed a prototype system to support participating subjects of the Urban Regeneration Projects. It will effectively utilize the information items in the physical computer files using information blocks and Metadata. The developed system provides the base to effectively manage large amount of documents in the early stage of the Urban Regeneration Project and make effective decision-making using the concept of data warehouse.

  • PDF