This paper deals with design of a cube-style modular robot. The modular robot can change its own form according to the working environment. Therefore it is suitable to work in the search and rescue area with the shape of snake, legged robot and humanoid robot. Each of modular unit has to install its own controller on the body and driving mechanism in order to give it mobility autonomously. And also they should attach and detach each other with docking mechanism and algorithm. Using this mechanism, they can make union, separation, recombination. The other important point is that some information of each cell should be exchanged to reconfigure their shape and to make some docking of the modular cell. In this paper we suggested a design concept of our modular robot focused on the docking mechanism of the robot.
The purpose of this study is to evaluate seismic performances of a modular house system developed by a simple 4-clip fastening method and double metal assembly made of lightweight metals. In order to evaluate structural and non-structural seismic performances of the system. Shaking table test was carried out with full-scale modular units, and a nonlinear pushover analysis was performed to obtain suitable seismic responses for story drifts, displacements, force resistances and dynamic properties of the system. Through 3D analysis and shaking table test, the current method of lightweight modular metal unit assembly and systems with seismic performance of a 4-clip fastening type modular house were demonstrated safe and effective to seismic design.
최근 인력자원 투입량 감소 및 공기단축이 가능한 모듈러 건축공법은 반복 공정이 많은 기숙사, 주거시설, 호텔 공사 등에 다양하게 적용되고 있다. 모듈러 건축공법은 유닛 설치비용을 제외한 현장 공사비에서 외장 마감공사 비용의 비중은 약 40%를 차지하며, 마감공사는 목표공기와 비용을 유지하는데 주요한 역할을 한다. 모듈러 현장에서 유닛 설치 및 마감공사 수행을 위해 한정된 장비가 후속 액티비티에 영향을 주지 않도록 공유되어야 하며 현장 마감 비중이 커지는 모듈러 프로젝트일수록 공정관리에서 양중 계획은 매우 중요하기 때문이다. 이와 같은 T/C 운용 계획은 단일 사이클 또는 다중 사이클의 형태를 가지게 되며 사이클 주기 조율은 장비효율을 높일 수 있다. 그러나 유닛 설치 및 마감공사를 지원하기 위한 T/C 운용 계획의 대안을 평가하는데 어려움이 있다. 따라서 본 연구는 모듈러 건축 현장에서 T/C 운용의 사이클 주기 설정에 따른 운용방식의 대안을 평가하기 위해 유닛 양중 시간 및 주기, 외장재 양중 시간, 마감 작업 소요시간을 변수화하여 T/C 가동시간과 공정에 주는 영향을 파악한다. 이러한 목적을 달성하기 위해 현장에서 이루어지는 작업 프로세스 분석을 바탕으로 작업 속도를 조절하여 T/C 효율을 증대시킬 수 있는 시뮬레이션 모델을 개발한다. 본 연구는 양중 사이클 개념을 적용한 자원 평준화 방법을 제시함으로써 학술적 기여가 있으며 실무적으로 현장관리자에게 장비 계획의 대안 선택을 위한 기초자료로서 활용될 수 있을 것이다.
This research was for the investigation and analysis of the illustration of modular construction application which is different use by each school facility since modular construction related examples are rare in domestic situation, and it has a limitation because of its being basic research material for generating the basic form of modular construction. The research results are as followings. First, in case of school facility from illustration investigation results, module measurement of class modulation is as similar as $3m{\times}10m$, but in resident facility the planning of more flexible plane shape can be possible since modules of 6 cases are free and various, and facade form of various types can be appeared by combination of module unit. Second, as a result of the generated characteristics in compared analysis of representative examples, school facilities were highly indicated for movability and duration reduction areas, and the flexibility, economic efficiency, and environment-friendliness was indicated low relatively. Third, the basic planning types of modular construction can be largely divided into layered type, horizontal (straightway) type, and compound type. The layered type has a short traffic line and facility system and is appropriate for the low-rise form unless separate construction method is used since it is susceptible to load. The horizontal type is advantageous for securing an opening since it has wide extent in light but has a long traffic line and facility system. Finally, the compound type can be possible for planning of various forms but needs the combination of various unit modules and traffic line and facility plan for it can be difficult.
모듈러 구조물은 관행적으로 철골 모멘트 저항골조와 유사한 횡력저항성능을 가진다는 가정하에 내진 설계된다. 하지만 모듈러 구조물은 중첩된 구조 부재와 단위 모듈의 체결을 위한 복잡한 접합 상세를 가지기 때문에 철골 모멘트 골조와 다른 하중 전달 메커니즘을 가진다. 본 연구에서는 중첩된 구조 부재 효과와 접합부의 거동 특성을 고려하여 총 4개의 구조해석 모델을 수립하였으며, 수립된 해석 모델을 이용하여 3층과 5층 표본 건물에 대한 비선형 정적 해석을 수행하였다. 표본 건물은 중첩된 구조 부재와 접합부의 이력 거동에 대한 모델링 방법에 따라 강성 및 강도의 차이가 발생하는 것으로 나타났다. 중첩된 구조 부재를 완전 합성, 모듈 간 접합부를 강접합으로 고려하여 설계된 모듈러 구조물은 횡 강성 및 강도가 과대 평가되는 것으로 나타났다. 뿐만 아니라 해석 결과를 통해 3층 이상의 모듈러 구조물은 철골 모멘트 저항골조와 비교하여 상대적으로 적은 초과 강도를 가지는 것을 확인할 수 있다.
현대 사회에서는 1인 가구가 증가하고 주거 공간에 대한 수요가 증가하고 있으며 이에 대한 적절한 대안 모색이 중요하다. 빠른 시간 내에 경제적이고 지속 가능한 주거 공간을 제공하기 위한 방법으로 모듈러 건축이 주목받고 있다. 본 연구에서는 BIM(Building Information Modeling) 기술을 활용한 모듈러 건축 유닛 설계 및 시공 과정 최적화 방법을 제안한다. 1인 가구의 주거 요구사항과 삶의 질 향상을 위한 요인을 분석하였다. 이를 바탕으로 BIM을 활용하여 효율적이고 경제적인 모듈러 공동주택 유닛을 개발하였다. BIM은 건축 요소의 시각화 및 상호 연결을 제공하여 설계 과정의 오류를 최소화하고 생산성을 향상시킬 수 있다. 모듈러 건축의 장점과 한계를 평가하였다. BIM을 활용한 모듈러 건축물은 주거 문제를 해결할 수 있는 효과적인 대안으로 제시될 수 있으며 주거 공간의 품질과 다양성을 높일 수 있다. 다만 기술적 요구사항 및 비용 등의 한계도 고려되어야 한다. BIM 기반 1인 가구 공동주택 유닛 설계의 가능성과 장점을 제시하고 1인 가구 개선을 위한 실질적인 해결책으로 활용될 수 있다.
Modular construction technique is an adaptation of factory-based mass production concept in ordinary manufacturing industries to construction industry and it assumes that panels, units, etc. are fabricated in factories and assembled in construction sites. Given its structural limitations, modular construction technique is primarily used in low-story buildings whose maximum height is usually five stories, but researchers are actively studying possible adaptation of modular construction technique to high-rise building designs these days as in the case of infill-type modular construction design. Infill-type modular construction technique, most frequently used in high-rise building construction projects, completes frame construction first in reinforced concrete structures and fills unit modules in such structures. However, infill-type modular construction technique leads to longer construction schedule accompanying increase in construction cost, cost overrun due to additional of temporary work, and possible damage to units in the wake of facility construction. Accordingly, this study is performed as a basic study for the development of bottom-up infill-type modular construction technique intended to construct structural frames and fill in units sequentially in a bid to address such drawbacks of current infill-type modular construction technique.
Abdelsalam, Mahmoud;Marei, Mostafa Ibrahim;Diab, Hatem Yassin;Tennakoon, Sarath B.
Journal of Power Electronics
/
제18권2호
/
pp.558-572
/
2018
In addition to its modular nature, a Hybrid Modular Multilevel Converter (HMMC) assembled from half-bridge and full-bridge sub-modules, is able to block DC faults with a minimum number of switching devices, which makes it attractive for high power applications. This paper introduces a control strategy based on the Root-Least Square (RLS) algorithm to estimate the capacitor voltages instead of using direct measurements. This action eliminates the need for voltage transducers in the HMMC sub-modules and the associated communication link with the central controller. In addition to capacitor voltage balancing and suppression of circulating currents, a fault tolerant control unit (FTCU) is integrated into the proposed strategy to modify the parameters of the HMMC controller. On advantage of the proposed FTCU is that it does not need extra components. Furthermore, a fault detection unit is adapted by utilizing a hybrid estimation scheme to detect sub-module faults. The behavior of the suggested technique is assessed using PSCAD offline simulations. In addition, it is validated using a real-time digital simulator connected to a real time controller under various normal and fault conditions. The proposed strategy shows robust performance in terms of accuracy and time response since it succeeds in stabilizing the HMMC under faults.
The 6th International Conference on Construction Engineering and Project Management
/
pp.704-705
/
2015
Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.
This paper describes the structure and design of a modular DC/DC converter for connecting DC sources such as battery, solar cell, etc. to DC distribution network. The modular converter structure of IPOS type and the optimal design and implementation of the unit converter cell are discussed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.