The modular building system is a type of prefabricated construction method, and is an industrialized building system that transports, assembles, and completes a three-dimensional module manufactured in a factory to the site. The economics of a modular building system where 50 to 80% of the entire process takes place in a modular factory is dominated by productivity of the factory manufacturing process. Since the building of the module is finished by the combination of unit parts produced by each material, it is necessary to manage the process in each module unit. However, currently marketed process control programs do not reflect the features of these modular methods. In this paper, we introduce Modular Factory Design software(MFD 2019) that can make modular unit production plan which reflects production base(modular factory) and production target(application and number of modular units). In order to verify software compatibility and reliability, two production plans with different production methods were formulated and simulated.
공기를 획기적으로 감소시킬 수 있는 모듈러건축으로 유사 모듈이 반복되는 공동주택을 건설하는 안에 대해 현행의 시공방법을 고찰한 결과 설비시스템에서 개선할 점을 발견하고, 그 방법으로 공장제작과 현장설치부분을 구분해서 살펴보고 현재 모듈러생산사 실무진의 의견과 종합건설사 기술담당자의 의견으로 그 가능성을 확인하고자 했으며 그 과정에서 제기된 문제에 대해 원천적인 관점에서 쉽게 풀어나갈 수 있는 방법으로 유리한 설계안을 제안하였고, 접속부위의 누수하자와 같은 고질적 문제점에 대한 대안을 기재하였다.
Prefabricated Modular Buildings are increasingly becoming popular in the construction industry as a method to achieve financially economical buildings in a very short construction time. This increasing demand for modular construction has expanded into multi-storey applications where the effect of lateral loads such as seismic loads becomes critical. However, there is a lack of detailed scientific research that has explored the behaviour of modular buildings and their connection systems against seismic loads. This paper will therefore present the nonlinear time history analysis of a multi-storey modular building against several ground motion records. The critical elements that need special attention in designing a modular building in similar seismic conditions is discussed with a deeper explanation of the behaviour of the overall system.
Currently, the school-age population continues to decline in Korea due to social factors. On the other hand, the dormitory facilities are constantly being built and renovated. There are many problems such as construction period and on-site waste when constructed with reinforced concrete structures, which are existing construction methods. Accordingly, dormitory facilities shall be constructed using appropriate construction methods. Therefore, in this study, we will collect and organize basic data on the use status and modular system of dormitory facilities and study efficient maintenance and management when modular construction method is applied to dormitory facilities with changing demand.
This research was for the investigation and analysis of the illustration of modular construction application which is different use by each school facility since modular construction related examples are rare in domestic situation, and it has a limitation because of its being basic research material for generating the basic form of modular construction. The research results are as followings. First, in case of school facility from illustration investigation results, module measurement of class modulation is as similar as $3m{\times}10m$, but in resident facility the planning of more flexible plane shape can be possible since modules of 6 cases are free and various, and facade form of various types can be appeared by combination of module unit. Second, as a result of the generated characteristics in compared analysis of representative examples, school facilities were highly indicated for movability and duration reduction areas, and the flexibility, economic efficiency, and environment-friendliness was indicated low relatively. Third, the basic planning types of modular construction can be largely divided into layered type, horizontal (straightway) type, and compound type. The layered type has a short traffic line and facility system and is appropriate for the low-rise form unless separate construction method is used since it is susceptible to load. The horizontal type is advantageous for securing an opening since it has wide extent in light but has a long traffic line and facility system. Finally, the compound type can be possible for planning of various forms but needs the combination of various unit modules and traffic line and facility plan for it can be difficult.
The current architectural design of unit modular has been based on 2D of CAD program, so unit modular character which needs unit information management, as a dried-member system, has no effect on design process. The purpose of this study is We have developed a suitable BIM design process, according to various works of construction, then tried to contribute to supply and activation of the urban-life-housing based on unit modular. The BIM modeling process based on unit modular has been in order of unit combination with preparing manual classification, and, it has been constructed, at construction site, from housing foundation to roof finish by Bottom-up method. At a manufacturing factory, it has been produced in order of 1) grouping materials and parts, 2) fabricating unit boxes, and 3) interference examination of unit boxes, and each order has been classified as housing structure, architecture, plumbing process separately. At a construction site, the fabrication has been done in order of, like as a real housing construction scenario, 1) RC foundation work 2) unit module job-site-fabrication work, 3) roof truss work, 4) plumbing and HVAC work, and 5) housing interior finish work. After modeling process, the interference examination on each work of construction has finally completed modeling. The Unit modular utilizing BIM modeling can make easy housing maintenance through systematic control with preparing manual of unit module information, and securing accurate and speedy construction information. And it will promote design credibility and create maximum effect of unit modular construction method, such as construction period reduction and upgrade of construction quality, etc., through the computer simulation as real as construction environment in cyber space, and with the interfering examination.
The appearance of new machine tools with higher flexibility is in need of a basic structure design system for establishing the systematic and rationalized design and manufacturing procedures. In this study. the basic structure design system for machine tools is realized based on the modular construction method. Machine tools are represented as a whole and modular complex with the directed graph, and all possible structural configurations and codes of machine tools for satisfying the machining requirement are derived from the DNA data and connecting patterns of basic structural elements. Especially the structural configurations of machine tools are visualized by the solid modeling techniques and 3-D graphics techniques.
Existing modular research has been mainly focused on S (shelter structure) and I (infill interior finishing material), and considerable research has been conducted, and the results are being proposed. However, in the case of the rest (exterior materials and windows, etc.), existing construction methods and materials are borrowed, and supporting hardware members and insulation materials are constructed on site, which acts as a factor hindering overall shortening of the construction period. That is, since the advantages and characteristics of modularity cannot be utilized in the absence of modular cladding, manufacturing of cladding is required. Therefore, it is necessary to develop a cladding system that can drastically reduce the construction period in factories while considering the structural characteristics of PC modulars.
우리나라의 모듈러 공법은 컨테이너하우스나 경량스틸 하우스로만 인식되고 있어, 수요창출에 상당한 어려움이 있다. 실제로 모듈러빌딩 활성화에 가장 큰 장애요인은 안정된 수요에 근거한 지속적인 공장 생산이 거의 어렵다는 것이다. 본 연구는 모듈러 공법의 대표적인 미국과 영국의 모듈러 기업의 사례 조사를 통하여, 건물 유형별로 모듈러 공법의 성공요인을 우선적으로 도출하였다. 10개의 건물유형과 9개의 성공요인으로 정리하여 조사한 결과, 주거시설은 공기단축, 설계성능, 경제성 순으로 중요도가 높았으며, 교육시설의 경우에는 공기단축, 친환경성, 경제성, 융통성 순으로 나타났다. 병원시설은 공기단축, 융통성, 경제성, 친환경성이 주요 성공요인으로 나타났으며, 이러한 성공요인들이 확보될 경우 우리나라에서도 모듈러 공법의 성공 가능성은 충분히 있다고 생각된다. 주거시설의 겨우 표준화된 모듈 설계안의 반복적인 활용을 통하여, 성공요인을 확보할 수 있으며, 교육시설의 경우, 단모듈-장모듈의 타입화된 모듈의 설계안을, 병원시설의 경우 증축기술의 개발을 통한 성공요인이 확보할 수 있을 것이다. 모듈러공법의 수요창출 방안을 적용할 수 있는 잠재적인 시장의 규모는 주거시설의 경우, 연간 약 12,000호 규모의 시장이 형성 가능하며 기숙사의 경우, 2012년 1,515억 원 정도의 시장규모를 볼 때, 모듈러 공법의 시장 확보가 충분히 가능하다. 교육시설의 경우, 주거시설보다 평면의 반복정도가 더 높기 때문에 충분한 시장형성이 가능하다. 병원시설의 증축시장은 2012년 1,045억 원 정도의 규모로 모듈러 공법이 적용된 사례가 전무하지만 앞으로의 진출 가능성은 충분하다. 본 연구에서 제안한 건물 유형별 수요창출 방안은 발주자가 공법을 선정할 때, 건물 유형에 맞는 전략을 수립하는 데에 조언으로서 활용할 수 있으며, 잠재적 시장을 파악한 결과 충분한 시장 규모를 확보할 수 있을 것이라고 기대할 수 있다. 또한 모듈러 설계 및 제조업체는 본 연구에서 제안한 방안을 사업전략으로 활용함으로써 전략적으로 건물 유형에 맞는 사업 방향을 설정하여 지속적인 수요창출을 기대할 수 있을 것이라고 생각한다.
The major industrialized nations have continued to develop industrialized construction techniques based on automated production processes in factories, and are applying them to a wide range of building. However, the unit modular construction system has had a shorter history of development and application in Korea compared to advanced countries, and consequently, Korean modular builders have a relatively poor technical capacity. So this study is draw a conclusion on the target of priority improvement for idea creation. It study on the enhancement of the functionality of the tool for assemble of Unit Modular that choose the enhancement of the functionality through the analysis of function on the three-level of functional definition and classification, functional arrangement, functional appraisal.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.