• Title/Summary/Keyword: Modified TOPSIS

Search Result 9, Processing Time 0.034 seconds

Selection of Environmentally Conscious Manufacturing's Program Using Multi-Criteria Decision Making: A Case Study in Electronic Company

  • Sutapa, I. Nyoman;Panjaitan, Togar W.S.
    • Industrial Engineering and Management Systems
    • /
    • v.10 no.2
    • /
    • pp.123-127
    • /
    • 2011
  • Nowadays, green purchasing, stop global warming, love the mother earth, and others that related to environment become hot issues. Manufactures industries tend to more active and responsive to those issues by adopting green strategies or program like Environmentally Conscious Manufacturing (ECM). In this article, an electronic company had applied 12 ECM Program and tries to choose one of those programs using 6 criteria, such as total cost involved, quality, recyclable material, process waste reduction, packaging waste reduction, and regulation compliance. By using multi-criteria decision making model, i.e. Analytical Hierarchy Process (AHP), Technique for Order Preference by Similarity to Ideal Solution (TOPSIS), and Modified TOPSIS methods, the ECM Program 9 (Open pit) is the best option.

Development of Destination Optimal Path Search Method Using Multi-Criteria Decision Making Method and Modified A-STAR Algorithm (다기준의사결정기법과 수정 A-STAR 알고리즘을 이용한 목적지 최적경로 탐색 기법 개발)

  • Choi, Mi-Hyeong;Seo, Min-Ho;Woo, Je-Seung;Hong, Sun-Gi
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.24 no.6_2
    • /
    • pp.891-897
    • /
    • 2021
  • In this paper, we propose a destination optimal route algorithm for providing route finding service for the transportation handicapped by using the multi-criteria decision-making technique and the modified A-STAR optimal route search algorithm. This is a method to set the route to the destination centering on safety by replacing the distance cost of the existing A-STAR optimal route search algorithm with the safety cost calculated through AHP/TOPSIS analysis. To this end, 10 factors such as road damage, curb, and road hole were first classified as poor road factors that hinder road driving, and then pairwise comparison of AHP was analyzed and then defined as the weight of TOPSIS. Afterwards, the degree of driving safety was quantified for a certain road section in Busan through TOPSIS analysis, and the development of an optimal route search algorithm for the transportation handicapped that replaces the distance cost with safety in the finally modified A-STAR optimal route algorithm was completed.

A TOPSIS-based Approach to Evaluating the University's Department Homepages for Operational Management Purposes (TOPSIS 기반 대학 학과 홈페이지 운영관리 평가방안)

  • Jeong, Gi-Ho
    • Journal of Convergence for Information Technology
    • /
    • v.9 no.9
    • /
    • pp.126-132
    • /
    • 2019
  • This study presents a TOPSIS-based application for the evaluation of administrative purposes on the website of university's departments. As the school age population decreases, the homepage of the university's departments also has important promotional means. However, most of them are not well managed until a full renewal. This is because the investment is difficult compared to strategic importance. Therefore, this paper tries to show its usefulness by applying a partially modified TOPSIS for management purposes, in consideration of the practicality. TOPSIS is appropriate for target management as a conceptual reason to prioritize based on the distance from the ideal target for each criterion. Also, in the case of monotonic functions of the evaluation criteria used, the same results can be obtained by reducing the amount of calculations through a partially modified procedure as presented in this study.

A Study on the Improvement of the ABC Analysis using TOPSIS (TOPSIS 모형을 이용한 ABC분석(分析)의 개선(改善)에 관한 연구(硏究))

  • Cho, Sung-Ku;Jung, Sang-Yun
    • IE interfaces
    • /
    • v.5 no.2
    • /
    • pp.19-27
    • /
    • 1992
  • The ABC analysis is a widely used inventory control technique which consists of classifying inventory items into three categories according to annual dollar usage and concentrating managerial efforts on the high value items. But its major weakness is that the classification is somewhat arbitrary and is made in the light of single criterion, the annual usage. In this paper, a modified approach using TOPSIS is proposed where 1) the inventory items are ranked, rather than classified into three categories, in the order of relative importance and 2) the latter is determined by considering the multiple criteria such as annual usage, difficulty of procurement, lead time and shelf life. A case study was performed with the field data from a company producing electronical parts. The rank order produced by TOPSIS was judged quite reasonable by the company inventory control manager.

  • PDF

MCDM Approach for Flood Vulnerability Assessment using TOPSIS Method with α Cut Level Sets (α-cut Fuzzy TOPSIS 기법을 적용한 다기준 홍수취약성 평가)

  • Lee, Gyumin;Chung, Eun-Sung;Jun, Kyung Soo
    • Journal of Korea Water Resources Association
    • /
    • v.46 no.10
    • /
    • pp.977-987
    • /
    • 2013
  • This study aims to develop a multiple criteria decision making (MCDM) approach for flood vulnerability assessment which considers uncertainty. The flood vulnerability assessment procedure consists of three steps: (1) use the Delphi process to determine the criteria and their corresponding weights-the adopted criteria represent the social, economic, and environmental circumstances related to floods, (2) construct a fuzzy data matrix for the flood vulnerability criteria using fuzzification and standardization, and (3) set priorities based on the number of assessed vulnerabilities. This study uses a modified fuzzy TOPSIS method based on ${\alpha}$-level sets which considers various uncertainties related to weight derivation and crisp data aggregation. Further, Spearman's rank correlation analysis is used to compare the rankings obtained using the proposed method with those obtained using fuzzy TOPSIS with fuzzy data, TOPSIS, and WSM methods with crisp data. The fuzzy TOPSIS method based on ${\alpha}$-cut level sets is found to have a higher correlation rate than the other methods, and thus, it can reduce the difference of the rankings which uses crisp and fuzzy data. Thus, the proposed flood vulnerability assessment method can effectively support flood management policies.

Robust Design for Multiple Quality Attributes in Injection Molded Parts by the TOPSIS and Complex Method (TOPSIS와 콤플렉스법에 의한 사출성형품의 다속성 강건설계)

  • Park, Jong-Cheon;Kim, Gi-Beom;Kim, Gyeong-Mo
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.18 no.12
    • /
    • pp.116-123
    • /
    • 2001
  • An automated injection molding design methodology has been developed to optimize multiple quality attributes, which are usually in conflict with each other, in injection molded parts. For the optimization, commercial CAE simulation tools and optimization techniques are integrated into the methodology. To decal with the multiple objective problem the relative closeness computed in TOPSIS(Technique for Order Preference by Similarity to Ideal Solution) is used as a performance measurement index for optimization multiple part defects. To attain robustness against process variation, Taguchi's quadratic loss function is introduced in the TOPSIS. Also, the modified complex method is used as an optimization tool to optimize objective function. The verification of the developed design methodology was carried out on simulation software with an actual model. Applied to production this methodology will be useful to companies in reducing their product development time and enhancing their product quality.

  • PDF

A Decision Support System for the Selection of a Rapid Prototyping Process (쾌속조형공정 선정을 위한 지원 시스템)

  • 변홍석;이관행
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2003.06a
    • /
    • pp.5-8
    • /
    • 2003
  • This paper presents a methodology to be able to select an appropriate RP system that suits the end use of a part. Evaluation factors used in process selection include major attributes such as accuracy, roughness, strength, elongation, part cost and build time that greatly affect the performance of RP systems. Crisp values such as accuracy and surface roughness are obtained with a new test part developed. The test part is designed with conjoint analysis to reflect users' preference. The part cost and build time that have approximate ranges due to cost and many variable parameters are presented by linguistic values that can be described with triangular fuzzy numbers. Based on the evaluation values obtained, an appropriate RP process for a specific part application is selected by using the modified TOPSIS(Technique of Order Preference by Similarity to Ideal Solution) method. It uses crisp data as well as linguistic variables, and each weight on the alternatives is assigned by using pair-wise comparison matrix. The ranking order helps the decision making of the selection of RP systems.

  • PDF

Application of meta-model based parameter identification of a seismically retrofitted reinforced concrete building

  • Yu, Eunjong
    • Computers and Concrete
    • /
    • v.21 no.4
    • /
    • pp.441-449
    • /
    • 2018
  • FE models for complex or large-scaled structures that need detailed modeling of structural components are usually constructed using commercial analysis softwares. Updating of such FE model by conventional sensitivity-based methods is difficult since repeated computation for perturbed parameters and manual calculations are needed to obtain sensitivity matrix in each iteration. In this study, an FE model updating procedure avoiding such difficulties by using response surface (RS) method and a Pareto-based multiobjective optimization (MOO) was formulated and applied to FE models constructed with a commercial analysis package. The test building is a low-rise reinforced concrete building that has been seismically retrofitted. Dynamic properties of the building were extracted from vibration tests performed before and after the seismic retrofits, respectively. The elastic modulus of concrete and masonry, and spring constants for the expansion joint were updated. Two RS functions representing the errors in the natural frequencies and mode shape, respectively, were obtained and used as the objective functions for MOO. Among the Pareto solutions, the best compromise solution was determined using the TOPSIS (Technique for Order of Preference by Similarity to Ideal Solution) procedure. A similar task was performed for retrofitted building by taking the updating parameters as the stiffness of modified or added members. Obtained parameters of the existing building were reasonably comparable with the current code provisions. However, the stiffness of added concrete shear walls and steel section jacketed members were considerably lower than expectation. Such low values are seemingly because the bond between new and existing concrete was not as good as the monolithically casted members, even though they were connected by the anchoring bars.

Power System Enhanced Monitoring through Strategic PMU Placement Considering Degree of Criticality of Buses

  • Singh, Ajeet Kumar;Fozdar, Manoj
    • Journal of Electrical Engineering and Technology
    • /
    • v.13 no.5
    • /
    • pp.1769-1777
    • /
    • 2018
  • This paper proposes a method for optimal placement of Phasor Measurement Units (PMUs) considering system configuration and its attributes during the planning phase of PMU deployment. Each bus of the system is assessed on four diverse attributes; namely, redundancy of measurements, rotor angle and frequency monitoring of generator buses, reactive power deficiency, and maximum loading limit under transmission line outage contingency, and a consolidated 'degree of criticality' is determined using Technique for Order of Preference by Similarity to Ideal Solution (TOPSIS). The major contribution of the proposed work is the development of modified objective function which incorporates values of the degree of criticality of buses. The problem is formulated as maximization of the aggregate degree of criticality of the system. The resultant PMU configuration extends complete observability of the system and majority of the PMUs are located on critical buses. As budgetary restrictions on utilities may not allow installation PMUs even at optimal locations in a single phase, multi-horizon deployment of PMUs is also addressed. The proposed approach is tested on IEEE 14-bus, IEEE 30-bus, New England (NE) 39-bus, IEEE 57-bus and IEEE 118-bus systems and compared with some existing methods.