• Title/Summary/Keyword: Model embankment

Search Result 247, Processing Time 0.024 seconds

Erosion behavior according to location of conduit cracks in agricultural reservoir

  • Ryu, Jung-Hyun;Heo, Joon;Shim, Jae-Woong;Kim, Cheol-Han;Yun, Bora;Lee, Yong-Hak;Lee, Dal-Won
    • Korean Journal of Agricultural Science
    • /
    • v.47 no.4
    • /
    • pp.1159-1168
    • /
    • 2020
  • The conduits of agricultural reservoirs undergo deterioration over a considerable period of time and this is highly likely to cause structural problems such as cracks. It is therefore important to consider the effects of structural defects on the body from the viewpoint of stability and maintenance of the embankment. In this study, basic data on the effects of the crack location on the stability of the embankment is obtained by identifying, comparing, and analyzing the erosion characteristics and pore water pressure behavior through a large-scale model experiment that involves classifying the location of the conduit cracks. From the results of the experiment, it was confirmed that when a crack occurred, the amount of leakage increased as the location of the crack portion was closer to the water level, and the internal erosion phenomenon accelerated, thereby increasing the possibility of piping. It was also found that an upstream conduit crack affects the erosion and water pressure change of the central and downstream conduit of the embankment, and the conduit crack has a very large effect on the pore water pressure despite the low upstream water level. Therefore, the seepage behavior of the embankment for each conduit crack identified in this study is considered to be useful basic data for preparing a repair and reinforcement plan according to the crack location in the future.

Effects of new construction technology on performance of ultralong steel sheet pile cofferdams under tidal action

  • Li, Ping;Sun, Xinfei;Chen, Junjun;Shi, Jiangwei
    • Geomechanics and Engineering
    • /
    • v.27 no.6
    • /
    • pp.561-571
    • /
    • 2021
  • Cofferdams made of teel sheet piles are commonly utilized as support structures for excavation of sea-crossing bridge foundations. As cofferdams are often subject to tide variation, it is imperative to consider potential effects of tide on stability and serviceability of sheet piles, particularly, ultralong steel sheet piles (USSPs). In this study, a real USSP cofferdam constructed using new construction technology in Nanxi River was reported. The design of key parts of USSP cofferdam in the presence of tidal action was first introduced followed by the description of entire construction technology and associated monitoring results. Subsequently, a three-dimensional finite-element model corresponding to all construction steps was established to back-analyze measured deflection of USSPs. Finally, a series of parametric studies was carried out to investigate effects of tide level, soil parameters, support stiffness and construction sequence on lateral deflection of USSPs. Monitoring results indicate that the maximum deflection during construction occurred near the riverbed. In addition, measured stress of USSPs showed that stability of USSP cofferdam strengthened as construction stages proceeded. Moreover, the numerical back-analysis demonstrated that the USSP cofferdam fulfilled the safety requirements for construction under tidal action. The maximum deflection of USSPs subject to high tide was only 13.57 mm at a depth of -4 m. Sensitivity analyses results showed that the design of USSP cofferdam system must be further improved for construction in cohesionless soils. Furthermore, the 5th strut level before concreting played an indispensable role in controlling lateral deflection of USSPs. It was also observed that pumping out water before concreting base slab could greatly simplify and benefit construction program. On the other hand, the simplification in construction procedures could induce seepage inside the cofferdam, which additionally increased the deflection of USSPs by 10 mm on average.

Behaviour of Embankment using Bottom Ash-Tire Shred Mixture (저회(Bottom Ash)와 폐타이어를 활용한 성토구조물 거동에 관한 연구)

  • Lee, Sung Jin;Shin, Min ho;Koh, Tae hoon;Hwang, Seon Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.1C
    • /
    • pp.21-31
    • /
    • 2009
  • Based on the proven feasibility of bottom ash and tire shred-soil mixtures as lightweight fill materials, tire shred-bottom ash mixtures were suggested as a new lightweight fill material to replace the conventional construction material (soil) with bottom ash. Therefore, we carried out the field compaction test and performance test of large scale embankment in order to evaluate their suitability for the use of lightweight fill materials. In these tests, we could assess the settlement, earth pressure, stress-strain relation, vibration of large scale embankment which were made with tire shred-bottom ash mixture and the conventional fill material(weathered soil) respectively. The earthpressure and vibration transmission was decreased and the settlement behaviour of the 2 materials (tire shred mixture and weathered soil) was measured similarly under static/cyclic loading condition.

A Theoretical Study on Arching Effect of Embankment Pile Grid (격자배치 성토지지말뚝의 아칭효과에 대한 이론적 연구)

  • Lee, Seung-Hyun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.1
    • /
    • pp.302-309
    • /
    • 2017
  • The influence of the pile diameter, center to center pile spacing, internal friction angle of embankment soil, and height of embankment on the arching efficacy of the embankment pile was investigated. The arching efficacy, which was derived by the arch model developed in the embankment soil was calculated using two methods, one that considers crown failure of the arch and the other that considers load on the pile cap and critical relative spacing ratio for which the arching efficacy calculated by the two methods are the same. According to the computed results in this study, the arching efficacy calculated from a consideration of the load on pile cap governs when the relative spacing ratio becomes smaller and that calculated from the theory of crown failure governs when the relative spacing ratio becomes larger. The critical relative spacing ratio below which the arching efficacy calculated from a consideration of the load on pile cap governs the design decreases with increasing value, which is defined by the ratio of the pile diameter to the pile center to center spacing. Critical relative spacing ratios, which correspond to the values of 0.5 and 0.2 were 0.35 and 0.85, respectively. Considering the computed results, the critical relative spacing ratio decreases with increasing Rankine passive earth pressure coefficient and critical relative spacing ratios, which correspond to values of 5 and 2, were 0.23 and 0.85, respectively. The arching efficacy, which corresponds to the area ratio of 9%, was 54% and the one that corresponds to the value of 3 was 61%; the critical relative spacing ratios, which correspond to those arching efficacies, were greater than 0.5.

Lateral Earth Pressure Caused by Action on Earth Retaining Wall in Clay Foundation Ground with Consideration of Construction Speed (지중 구조물에 작용하는 측방토압에 대한 성토 재하 속도의 영향)

  • Im Eun-Sang;Lee Kang-Il
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.7
    • /
    • pp.57-68
    • /
    • 2004
  • When an embankment is constructed on soft clay ground, the lateral displacement generally called as lateral flow is generated in the foundation ground. It strongly affects stabilities of structures, such as foundation piles and underground pipes, in and on the foundation ground. The lateral earth pressure induced by the lateral flow is influenced by the magnitude and construction speed of embankment, the geometric conditions and geotechnical characteristics of the embankment, and the foundation ground, and so on. Accurate methods for estimating the lateral earth pressure have not ever been established because the lateral flow of a foundation ground shows very complicated behavior, which is caused by the interaction of shear deformation and volumetric deformation. In this paper, a series of model tests were carried out in order to clarify effects of construction speed of an embankment on the lateral earth pressure in a foundation ground were design. It was found that the magnitude and the distribution of the lateral earth pressure and its change with time are dependent on the construction speed of the embankment. It was found that a mechanism for the lateral earth pressure was generated by excess pore water pressure due to negative dilatancy induced by shear deformation under the different conditions of construction speeds of embankments.

Distortion of Resistivity Data Due to the 3D Geometry of Embankment Dams (저수지 3차원 구조에 의한 전기비저항 탐사자료의 왜곡)

  • Cho, In-Ky;Kang, Hyung-Jae;Kim, Ki-Ju
    • Geophysics and Geophysical Exploration
    • /
    • v.9 no.4
    • /
    • pp.291-298
    • /
    • 2006
  • Resistivity method is a practical and effective geophysical technique to detect leakage zones in embankment dams. Generally, resistivity survey conducted along the crest assumes that the embankment dam has a 2D structure. However, the 3D topography of embankments distorts significantly resistivity data measured on anywhere of the dam. In this study, we analyse the influence from 3D effects created by specific dam geometry through the 3D finite element modeling technique. We compared 3D effects when resistivity surveys are carried out on the upstream slope, left edge of the crest, center of the crest, right edge of the crest and downstream slope. We ensure that 3D effect is greatly different according to the location of the survey line and data obtained on the downstream slope are most greatly influenced by 3D dam geometry. Also, resistivity data are more influenced by the electrical resistivity of materials constituting reservoir than 3D effects due to specific dam geometry. Furthermore, using resistivity data synthesized with 3D modeling program for an embankment dam model with leakage zone, we analyse the possibility of leakages detection from 2D resistivity surveys performed along the embankment dam.

A Study on the Influence Range of Lateral Movement of Abutment on the Soft Clay by MCC Model (MCC 모델에 의한 연약지반의 교대측방이동 영향범위에 관한 연구)

  • Park, Choon Sik;Kim, Jong Hwan;Baek, Jin Sool
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.1
    • /
    • pp.195-205
    • /
    • 2013
  • This study, using the MCC Model to consider consolidation, estimated the range within which no influences occur from lateral movement and its amount of the foundation pile and abutment on the soft ground. This study performed finite element analyses, with variations on the adhesiveness and internal friction angle, depth of soft clay, embankment height, consolidation parameters, and separation distance between the abutment and embankment. The abutment's horizontal displacement exhibits linear change with a longer separation distance, and changes into an exponential form as the embankment gets closer to the abutment. As the soft clay layer becomes 10 m deeper, the horizontal displacement tends to increase 1.5~3.0 times. However, it decreases at a rate of 0.3~0.95 when adhesiveness is increased by 10 $kN/m^2$ and internal friction angle is increased by $5^{\circ}$. The increase change rate in a lateral movement amount becomes greater if it is closer to the abutment when the abutment separation distance is long. When the distance is short, the change rate of horizontal displacement increases in similar a way, but it tends to be decreasing overall.

Reinforcement Effectiveness and Arching Effect of Geogrid-Reinforced and Pile-Supported Roadway Embankment (지오그리드로 보강된 성토지지말뚝의 보강 및 아칭효과분석)

  • Shin, Eun Chul;Oh, Young In;Lee, Dong Hyun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.4 no.2
    • /
    • pp.11-18
    • /
    • 2005
  • A pilot scale filed model test and 2-D numerical analysis was conducted to evaluate the effectiveness of constructing a geogrid-reinforced and pile-supported embankment system over soft ground to reduce differential settlement, and the results are presented hearin. Three-by-three pile groups with varying the space between pile were driven into a layer of soft marine clay and a layer of geogrid was used as reinforcement over each pile group. 2-D numerical analysis has been conducted by using the FLAC-2D(Fast Lagrangian Analysis of Continua) program for same condition of field model test. The settlement, vertical stress, and strain of geogrid due to the construction of embankment were measured at various locations. Based on the field model test and numerical analysis results, pile reinforcement generated the soil arching at the midspan of pile cap and the geogrid reinforcement helps reduce the differential settlement of the soft ground by tensile strength of geogrid. Also for $D/b{\geq}6.0$, the effectiveness of geogrid reinforcement in reducing settlement is negligible.

  • PDF

Centrifuge Model Tests on Characteristics in Forced Replacement Method for Soft Ocean Ground to Build Coastal Structures (해안구조물 축조를 위한 해양연약지반의 강제치환 특성에 관한 원심모형실험)

  • Park, Byung-Soo
    • Journal of Ocean Engineering and Technology
    • /
    • v.20 no.5 s.72
    • /
    • pp.42-48
    • /
    • 2006
  • This paper shows theresults of centrifuge model experiments to investigate the behavior of a replacement method in dredged and reclaimed ground. For this experimental work, centrifuge model tests were carried out to investigate the behavior of a replacement method in soft clay ground. Basic soil property tests were performed to find the mechanical properties of clay soil sampled from the southern coast of Korea, which was used for the ground material in the centrifuge model tests. The reconstituted clay ground of the model was prepared by applying reconsolidntion pressure in a 1 g condition with a specially built model container. Centrifuge model tests were carried out under the artificially accelerated gravitational level of 50 g. Replacement material of lead with a certain degree of angularity was used and placed until the settlement of the replacement material embankment reached a state of equilibrium. Vertical displacement of the replacement material was monitored during tests. The depth and shape of the replacement, especially the slope of the penetrated material and the water content of the clay ground were measured after finishing tests. Model tests for investigating the stability of an embankment after backfilling were also performed to simulate the behavior of a dike treated with replacement and backfilled with sandy material. As a result of the centrifuge model test, the behavior of the replacement, the mechanism of the replacement material being penetrated into clay ground, and the depth of the replacement were evaluated.

Numerical Modeling of Changes in Tides and Tidal Currents Caused by Embankment at Chonsu Bay (천수만 방조제 건설로 인한 조석현상 변화)

  • 소재귀;정경태;채장원
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.10 no.4
    • /
    • pp.151-164
    • /
    • 1998
  • Changes in tides and tidal currents in Chonsu Bay caused by the construction of Seosan A and B reclamation regions have been investigated using a depth-integrated two-dimensional tidal model. Three water level recorders were deployed for about one month and used for the specification of the open boundary condition. The computed currents were found to be in a good agreement with the measurements at two stations within Chonsu Bay. Comparison of the absolute velocities computed with the conditions before and after the embankment clearly shows that the reduction in tidal current amplitude is evident throughout the bay and the magnitude of the reduction increases to the north. Calculation shows that the embankment has advanced the time of drying at the northern part of the bay by about 51 minutes and has increased the exposure time by about 23 minutes. The high water time has advanced by about 1 hour, lowering the high water level by about 15 cm.

  • PDF