• Title/Summary/Keyword: Mid-Block system

Search Result 27, Processing Time 0.022 seconds

조선 중일정계획시스템을 위한 공정계획 객체 설계에 관한연구

  • 최해주;박주철
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.290-293
    • /
    • 2001
  • The mid-schedule planning of the ship is making a schedule about the process from cutting to erection. The ship consists of lots of blocks. This block has different process because of the shape of the block varies in accordance with the ship-type and the part position of the ship. The type and order of each block process initially must be generated for the mid-schedule planning. In this paper, the process planning, described as above is preparing the basic information before scheduler make a plan with the prepared manhour. The scheduling is done with this process planning which includes the information of the process order. This paper shows the research about three methods to design the process planning. First, investigate the expression method about information of the process planning for the mid-schedule planning in real workplace. Second, design the object of the process planning on the basis of investigating the expression method. Finally, develop the prototype of object on the basis of this designed process planning and then find the practical use in the mid-schedule planning. The object, which is developed in this paper, contains the main algorithm. In case of developing The Mid-Schedule Planning System, this object is expected to be utilized very easily as consisting another object.

  • PDF

A Fast Parity Resynchronization Scheme for Small and Mid-sized RAIDs (중소형 레이드를 위한 빠른 패리티 재동기화 기법)

  • Baek, Sung Hoon;Park, Ki-Wong
    • KIPS Transactions on Computer and Communication Systems
    • /
    • v.2 no.10
    • /
    • pp.413-420
    • /
    • 2013
  • Redundant arrays of independent disks (RAID) without a power-fail-safe component in small and mid-sized business suffers from intolerably long resynchronization time after a unclean power-failure. Data blocks and a parity block in a stripe must be updated in a consistent manner, however a data block may be updated but the corresponding parity block may not be updated when a power goes off. Such a partially modified stripe must be updated with a correct parity block. However, it is difficult to find which stripe is partially updated (inconsistent). The widely-used traditional parity resynchronization manner is a intolerably long process that scans the entire volume to find and fix inconsistent stripes. This paper presents a fast resynchronization scheme with a negligible overhead for small and mid-sized RAIDs. The proposed scheme is integrated into a software RAID driver in a Linux system. According to the performance evaluation, the proposed scheme shortens the resynchronization process from 200 minutes to 5 seconds with 2% overhead for normal I/Os.

A Study on GIS Information System for Shipbuilding Yard Block Logistics Simulation (조선소 야드 블록 물류 시뮬레이션을 위한 GIS 정보 체계 연구)

  • Kim, Sanghun;Lee, Yonggil;Woo, Jonghun;Lim, Hyunkyu
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.55 no.2
    • /
    • pp.116-123
    • /
    • 2018
  • These days, geographic information system has released in everyday life and industries. However, the shipyard only uses it to manage the layout of the yard. In this study, we apply the Geographic Information System to shipbuilding block logistics simulation to analyse the behavior of bogies and forklifts carrying blocks and materials in the shipyard. The shipyard manages daily block logistics plans at the execution planning stage. However, since it is a daily plan, it is difficult to respond to an unexpected situation immediately, and application to judge a certain value or higher value is insufficient. Therefore, a simulation model was created using the shape and attribute information inherent in the geographic information system to verify and improve the block logistics of the mid-and long-term yards. Through this simulation model, we will analyse loads on the workplace, stockyard, and road, and contribute to overall logistics improvement from the point of view of resource planning. In addition, the results of the simulation are reflected in the planning, to help support various decisions.

Rendezvous Mission to Apophis: I. Mission Overview

  • Choi, Young-Jun
    • The Bulletin of The Korean Astronomical Society
    • /
    • v.46 no.2
    • /
    • pp.57.2-57.2
    • /
    • 2021
  • An asteroid is important for understanding the condition of our solar system in early-stage because an asteroid, considered as a building block of the solar system, preserves the information when our solar system was formed. It has been continuously flowing into the near-Earth space, and then some asteroids have a probability of impacting Earth. Some asteroids have valuable minerals and volatiles for future resources in space activity. Korean government clarified, in the 3rd promotion plan for space activity, an asteroid sample return mission by the mid-2030s. However, it is almost impossible to do so based on only a single experience of an exploration mission to the Moon, Korea Pathfinder Lunar Orbiter, which will be launched in mid-2022. We propose a Rendezvous Mission to Apophis(RMA), beneficial in terms of science, impact hazardous, resource, and technical readiness for the space exploration of Korea.

  • PDF

A Study on Discrete Event Simulation of Shipyard Outdoor Block Movement (조선소 옥외 물류의 이산 사건 시뮬레이션에 관한 연구)

  • Lee, Choon-Jae;Lee, Jang-Hyun;Woo, Jong-Hun;Shin, Jong-Gye;Ryu, Cheol-Ho
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.44 no.6
    • /
    • pp.647-656
    • /
    • 2007
  • Simulation model of outdoor block movement of shipyard is implemented in this paper. The load of the outdoor workshops in a shipyard influences a mid-term planning and scheduling of the shipyard. Since the load analysis is expected in advance before confirming the planning and scheduling, a discrete event simulation (DES) may be a good solution. The accuracy of DES is up to the accurate modeling of Products, Processes, and Resources (PPR) included in a system. PPR in the outdoor system are clearly defined and the simulation model for the outdoor logistics is implemented by modeling the selective PPR with the help of a DES tool which is programmable by users. The simulation model is verified by comparing the results with the real shipyard data. The outputs through the simulation are discussed.

조선 도장 공장 운영 방안 수립에 관한 연구

  • 최동희;박주철
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.286-289
    • /
    • 2001
  • This paper deals with the procedures of effective mid-term Operation Planning establishment for painting shop in shipbuilding. and develop prototype system. In general, the block painting process consists of two stages such as blasting operation for surface preparation and painting operation for paint application for blocks. Weather condition is a potent Influence on those operations. The procedures consists of four steps, Load analysis, Generate alternative simulation plan. Implementation of Allocation automation module and Compare result of each simulation plan. Explain of each step. as follows, 1.step, Load analysis measure amount of assigned workload and manhour. 2.step, simulation scheme include alterable control variable such as overtime, weather. Auto allocating module carry out feasibility of simulation plan. 3.step, Allocation automation module are composed of three algorithms, as followings: - the block allocation algorithm that determines the number of blocks to be processed each day, - the team allocation algorithm that allocates blocks to worker groups. - the block arrangement algorithm that arrange blocks in blasting and painting cells. Since the block arrangement algorithm is conducted simultaneously with the team allocation algorithm, the total structure of the operating algorithms is considered to have two phases: first, daily load balancing with capacity limit and second, team allocation considering arrangement each day 4 step, Comparing result of each simulation plan. and select best simulation plan.

  • PDF

H-Bridge VSC with a T-Connected Transformer for a 3-Phase 4- Wire Voltage and Frequency Controller of an Isolated Asynchronous Generator

  • Kasal, Gaurav Kumar;Singh, Bhim
    • Journal of Power Electronics
    • /
    • v.9 no.1
    • /
    • pp.43-50
    • /
    • 2009
  • This paper deals with a novel solid state controller (NSSC) for an isolated asynchronous generator (IAG) feeding 3-phase 4-wire loads driven by constant power prime movers, such as uncontrolled pico hydro turbines. AC capacitor banks are used to meet the reactive power requirement of the asynchronous generator. The proposed NSSC is realized using a set of IGBTs (Insulated gate bipolar junction transistors) based current controlled 2-leg voltage source converters (CC- VSC) and a DC chopper at its DC bus, which keeps the generated voltage and frequency constant in spite of changes in consumer loads. The neutral point of the load is created using aT-configuration of the transformers. The IAG system is modeled in MATLAB along with Simulink and PSB (power system block set) toolboxes. The simulated results are presented to demonstrate the capability of the isolated generating system consisting of NSSC and IAG driven by uncontrolled pico hydro turbine and feeding 3-phase 4-wire loads.

Comparing accuracy of denture bases fabricated by injection molding, CAD/CAM milling, and rapid prototyping method

  • Lee, Suji;Hong, Seoung-Jin;Paek, Janghyun;Pae, Ahran;Kwon, Kung-Rock;Noh, Kwantae
    • The Journal of Advanced Prosthodontics
    • /
    • v.11 no.1
    • /
    • pp.55-64
    • /
    • 2019
  • PURPOSE. The accuracy of denture bases was compared among injection molding, milling, and rapid prototyping (RP) fabricating method. MATERIALS AND METHODS. The maxillary edentulous master cast was fabricated and round shaped four notches were formed. The cast was duplicated to ten casts and scanned. In the injection molding method, designed denture bases were milled from a wax block and fabricated using SR Ivocap injection system. Denture bases were milled from a pre-polymerized block in the milling method. In the RP method, denture bases were printed and post-cured. The intaglio surface of the base was scanned and surface matching software was used to measure inaccuracy. Measurements were performed between four notches and two points in the mid-palatal suture to evaluate inaccuracy. The palatine rugae resolution was evaluated. One-way analysis of variance was used for statistical analysis at ${\alpha}=.05$. RESULTS. No statistically significant differences in distances among four notches (P>.05). The accuracy of the injection molding method was lower than those of the other methods in two points of the mid-palatal suture significantly (P<.05). The degree of palatine rugae resolution was significantly higher in the injection molding method than that in other methods (P<.05). CONCLUSION. The overall accuracy of the denture base is higher in milling and RP method than the injection molding method. The degree of fine reproducibility is higher in the injection molding method than the milling or RP method.

A study on optimal of block facility layout using Hybrid GA (Hybrid GA를 이용한 최적의 블록단위 설비배치에 관한 연구)

  • 이용욱;석상문;이철영
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2000.11a
    • /
    • pp.131-142
    • /
    • 2000
  • Facility layout is the early stage of system design that requires a mid-term or long-term plan. Since improper facility layout might incur substantial logistics cost including material handling and re-installment costs, due consideration must be given to decisions on facility layout. Facility layout is concerned with low to arrange equipment necessary for production in a given space. Its objective is to minimize the sum of all the products of each equipment's amount of flow multiplied by distance. Facility layout also is related to the issue of NP-complete, i.e., calculated amounts exponentially increase with the increase of the number of equipment. This study discusses Hybrid GA developed, as an algorithm for facility layout, to solve the above-mentioned problems. The algorithm, which is designed to efficiently place equipment, automatically produces a horizontal passageway by the block, if a designer provides the width and length of the space to be handled. In addition, this study demonstrates the validity of the Algorithm by comparing with existing algorithms that have been developed. We present a Hybrid GA approach to the facility layout problem that improves on existing work in terms of solution quality and method. Experimental results show that the proposed algorithm is able to produce better solution quality and more practical layouts than the ones obtained by applying existing algorithms.

  • PDF

A new species of the primitive stromatoporoid Cystostroma from the Ordovician of East Asia

  • Jeon, Juwan;Li, Qijian;Oh, Jae-Ryong;Choh, Suk-Joo;Lee, Dong-Jin
    • Geosciences Journal
    • /
    • v.23 no.4
    • /
    • pp.547-556
    • /
    • 2019
  • A new species of the most primitive rosenellid stromatoporoid Cystostroma, C. primordia sp. nov. is reported from the Hunghuayuan Formation (Lower Ordovician, Floian) of Guizhou Province in the South China Block and the Duwibong Formation (Middle Ordovician, Darriwilian) of the Taebaeksan Basin in mid-eastern Korea (North China Block). This species is the first representative of the genus found in both the North and South China blocks. Cystostroma primordia sp. nov. is characterized by the absence of denticles and distinctively smaller cyst plates (height 0.04-0.20 mm, length 0.09-0.39 mm) than any other known species of Cystostroma. The presence of C. primordia sp. nov. in Lower to Middle Ordovician strata of western Gondwana challenges the long-held view of the late Middle Ordovician emergence of Paleozoic stromatoporoids. The simple internal morphological features of this new species and its occurrence in the Lower Ordovician of South China strongly indicate that an Early Ordovician Cystostroma-type precursor from western Gondwana is located near the base of the stromatoporoid stock. This occurrence greatly preceded the late Middle Ordovician (late Darriwilian) stromatoporoid diversification in circum-equatorial regions worldwide.