• Title/Summary/Keyword: Meteorological mast

Search Result 34, Processing Time 0.019 seconds

Analysis of Factors Influencing the Measurement Error of Ground-based LiDAR (지상기반 라이다의 측정 오차에 영향을 미치는 요인 분석)

  • Kang, Dong-Bum;Huh, Jong-Chul;Ko, Kyung-Nam
    • Journal of the Korean Solar Energy Society
    • /
    • v.37 no.6
    • /
    • pp.25-37
    • /
    • 2017
  • A study on factors influencing measurement error of Ground-based LiDAR(Light Detection And Ranging) system was conducted in Kimnyeong wind turbine test site on Jeju Island. Three properties of wind including inclined angle, turbulence intensity and power law exponent were taken into account as factors influencing the measurement error of Ground-based LiDAR. In order to calculate LiDAR measurements error, 2.5-month wind speed data collected from LiDAR (WindCube v2) were compared with concurrent data from the anemometer on a nearby 120m-high meteorological mast. In addition, data filtering was performed and its filtering criteria was based on the findings at previous researches. As a result, at 100m above ground level, absolute LiDAR error rate with absolute inclined angle showed 4.58~13.40% and 0.77 of the coefficients of determination, $R^2$. That with turbulence intensity showed 3.58~23.94% and 0.93 of $R^2$ while that with power law exponent showed 4.71~9.53% and 0.41 of $R^2$. Therefore, it was confirmed that the LiDAR measurement error was highly affected by inclined angle and turbulence intensity, while that did not much depend on power law exponent.

Analysis of Working Time at the Test Site of Southwest Offshore Wind Project in Korea Based on Weather Window (기상조건에 따른 서남해 해상풍력 실증단지 작업시간 분석)

  • Kim, Min Suek;Kim, Ji Young;Kwak, Ji Yeong;Kang, Keum Seok
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.27 no.5
    • /
    • pp.358-363
    • /
    • 2015
  • As a preparation process for successful establishment of demonstration offshore wind farm, analyses have been made for working time at the construction site where working time is defined as the time available for marine operation to take place under given weather conditions. Data used are hourly wave and wind data from met mast, HeMOSU-1, and 3 hour numerical model data from Korea Meteorological Administration (KMA). Seasonal results show the minimum working time during winter and moderate during autumn and spring. The most working time was seen during summer on average. Monthly analyses show the most working time in May, June, and August which was higher than the working time in July and September. Working time reaches at steady state and no significant change was seen above wave height of 1.5 m and wind speed of 8 m/s.

A Study on Development of Test Site for Wind Turbine Prototype Test (풍력터빈시험을 위한 실증시험장 개발에 관한 연구)

  • Moon, Chae-Joo;Chang, Young-Hag;So, Soon-Yeol;Kim, Tae-Gon;Kim, Young-Gon;Jeong, Moon-Seon;Jeong, Seong-Won
    • Journal of the Korean Solar Energy Society
    • /
    • v.33 no.2
    • /
    • pp.101-107
    • /
    • 2013
  • It is evident that in the wind energy business as an economic activity there is a close relationship between the wind speed and the revenues. The wind turbine test facility for wind turbine accreditation is intended to be used by the industry for testing of both main components and systems. This paper suggest the wind test site for certification of prototype wind turbine with international regulations. The test site has an environmental permit for wind turbines with a maximum hub height of 120m and a rotor diameter up to 120m, and can accommodate prototypes with installed electrical powers up to 5MW each. A wind turbine manufacturer can lease the location for a period of type certification. And also researchers are the development of new methods for measuring the influence, performance and durability of the components, a mathematical and numerical modelling of component responses by using the site.

The Study on Assessment of Roughness Coefficient for Designing Wind Farm in Jeju Island (제주도 풍력발전단지 설계를 위한 조도계수 산정에 대한 연구)

  • Ko, Jung-Woo;Quan, He Chun;Lee, Byung-Gul
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.20 no.2
    • /
    • pp.15-22
    • /
    • 2012
  • The variation in the wind speed with height above ground is called the wind shear profile. In the field of wind resource assessment, analysts typically use one of two mathematical relations to characterize the measured wind shear profile: the logarithmic profile (log law) and the power law profile (power law). The logarithmic law uses the surface roughness as a parameter, and the power law uses the power law exponent as a parameter. The shape of the wind shear profile typically depends on several factors, most notably the roughness of the surrounding terrain and the stability of the atmosphere. Since the atmospheric stability changes with season, time of day, and meteorological conditions, the surface roughness and the power law exponent also tends to change in time. For this study, Using the observed data from Met-mast, located in Pyeongdae, Handong in Jeju. we used the matlab and windograper to calculate roughness length and the law exponents. These calculations are similar to reference the data, but they have different ranges. In the ocean case, each reference data and calculated data was the same, but the crop area is higher than the earlier studies. In addition, the agricultural village is lower than the earlier studies.