• 제목/요약/키워드: Measurement of Performance

Search Result 6,954, Processing Time 0.043 seconds

A Study on an Equipment Performance Measurement System for Effective Bottleneck Management (병목 설비의 개선 활동에 유용한 설비관리 지표체계에 관한 연구)

  • Lee, Min-Ho;Lim, Sung-Mook
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.4
    • /
    • pp.100-113
    • /
    • 2010
  • Manufacturing companies' cost competitiveness with respect to equipment management can be achieved by satisfying additional market demands by their own capacity without purchasing additional equipments. In essence, it can be accomplished by making continuous investigation into bottlenecks and improvement on them. Therefore, equipment performance measure systems should be designed so that they can support manufacturing companies' such endeavors. With the purpose of establishing an effective equipment performance measurement system for detecting and improving bottlenecks, this study (1) suggests some desirable features that such a system should have, (2) evaluates conventional equipment performance measurement systems in terms of their usefulness for the detection and improvement of bottlenecks, and (3) proposes an improved system. We also perform a simulation experiment to demonstrate the limitations of the conventional systems and show how the proposed system can resolve the problems.

An Experimental Study on the Energy Efficiency Ratio of Heat Pump for Air Source (공기열원 히트펌프의 에너지 효율 비율에 관한 실험적 연구)

  • SOON YOUNG JEONG
    • Transactions of the Korean hydrogen and new energy society
    • /
    • v.33 no.6
    • /
    • pp.838-844
    • /
    • 2022
  • In this paper, an experimental study was conducted on the energy efficiency ratio of performance for air source heat pump. The energy efficiency ratio presents the operating efficiency of heat pump performance. In order to improve reliability in the energy efficiency ratio test of air source heat pump, the measurement uncertainty of the instrument was estimated. Measurement uncertainty refers to the uncertainty of a measurement, estimates the range in which the expected value of the measurement can be within a certain confidence level, and suggests a range in which the measured representative value is incorrect. The measurement uncertainty for the energy efficiency ratio test of air source heat pump was calculated and the measured results were presented.

UTILITY-BASED PERFORMANCE MEASUREMENT SYSTEM (UBPMS) FOR COMPARISON OF CONSTRUCTION PROJECTS

  • Ki-Hyun Kim;Hee-Sung Cha;Ju-Yeoun Han;Il-Han Yu
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1509-1514
    • /
    • 2009
  • CII BM&M(Benchmarking & Metrics) in USA and DTI(Department of Trade and Industry) in UK have built up systems that enable performance measuring and made the results of performance measurement comparable between projects to utilize them as benchmarking tools. By comparing the results of performance measurement, it is possible to grasp the success level of project management and to establish the direction of management. However, construction projects are much diversified and even those projects with the same work type have different attributes. Therefore, simply comparing the results of project performance measurement without considering the characteristics of projects is not justifiable and affects the reliability of the benchmarking results. Therefore, to solve this problem, this study presents a methodology that makes it possible to compare the individual construction projects considering various characteristics. The benefits and importance of project characteristics to overall project performance will be quantitatively expressed and they will be reflected on the results of performance management. By maximally converting multiple projects with different characteristics into the same projects through a new methodology to convert different projects into the same level utilizing such utility-bases and comparing the performances of those projects, project performance results can be utilized in project management as a tool for more accurate decision making and as a robust benchmarking tool.

  • PDF

A Study on the Precise Measurement of the Performance in the Heating System (발열시스템 열적 성능의 정밀측정에 관한 연구)

  • 최창용;김홍건
    • Transactions of the Korean Society of Machine Tool Engineers
    • /
    • v.11 no.6
    • /
    • pp.60-67
    • /
    • 2002
  • A precise measurement of field test was performed to estimate the thermal performance of the forced convection electric air heater by experiment. Air temperature, flow rate and electrical power input were measured with the related measurement sensors, and acquisition methods for the measured data were studied to estimate the thermal performance of the tested air heater effectively. To determine the mean air temperature at the flow cross-section, measuring positions were chosen by considering the flow velocity profile and the equally divided cross-sectional area. From the experimental results, thermal efficiency was obtained accurately as an indication of the tested heating system performance.

Evaluation of Performance of a DPRMs by the Vibration Signal Analysis. (진동신호 분석을 통한 DPRMs의 성능평가)

  • Choi, Young-Sam;Shin, Chan-Ho;Chung, Jin-Tai;Han, Song-Soo;Lee, Sang-Heon;Lee, Kye-Young
    • Proceedings of the KSME Conference
    • /
    • 2004.11a
    • /
    • pp.788-792
    • /
    • 2004
  • In this study, the performance of the DPRMs is evaluated and the measurement precision for the pile driving is presented. The DPRMs is a visual-measurement system for the pile rebound and the penetration movement using a high speed line-scan camera. But the measurement errors of the DPRMs are caused by the strong impact for the pile driving. Therefore, the DPRMs should guarantee its measurement values for the pile driving. For this reason, the performance of the DPRMs by the vibration signal analysis is studied. It is found from this study that the measurement values of the DPRMs are reliable.

  • PDF

A Study on the GSCM Strategy and Business Performance - Focus on DOOLEE VISION Case - (GSCM전략과 사업성과에 관한 연구 -두리비전 사례를 중심으로-)

  • Kim, Chang-Bong
    • International Commerce and Information Review
    • /
    • v.8 no.1
    • /
    • pp.325-336
    • /
    • 2006
  • This paper examines the global supply chain management strategy and business performance of Doolee Vision Co. Ltd.. Based on the analysis of eighty-seven cases, the following results were found. First, it was found that just-in-time of GSCM strategy of firm have a positive influences on the business performance in transformation sector. Second, just-in-time of GSCM strategy of firm have a positive influences on the business performance in custody sector. Third, just-in-time of GSCM strategy of firm have a positive influences on the business performance in order response and support sector. Forth, just-in-time of GSCM strategy of firm have a positive influences on the business performance in customs sector. Fifth, just-in-time of GSCM strategy of firm have a positive influences on the business performance in customer service sector. However, several limitations, such as measurement for intra-industry homogeneity, measurement for flexibility of global supply chain management strategy, and measurement for business performance of global supply chain management, that make the preceding conclusions be considered preliminary.

  • PDF

Development of an Analysis Software for the Load Measurement of Wind Turbines (풍력발전기의 하중 측정을 위한 해석 소프트웨어의 개발)

  • Gil, Kyehwan;Bang, Je-Sung;Chung, Chinwha
    • Journal of Wind Energy
    • /
    • v.4 no.1
    • /
    • pp.20-29
    • /
    • 2013
  • Load measurement, which is performed based on IEC 61400-13, consists of three stages: the stage of collecting huge amounts of load measurement data through a measurement campaign lasting for several months; the stage of processing the measured data, including data validation and classification; and the stage of analyzing the processed data through time series analysis, load statistics analysis, frequency analysis, load spectrum analysis, and equivalent load analysis. In this research, we pursued the development of an analysis software in MATLAB to save labor and to secure exact and consistent performance evaluation data in processing and analyzing load measurement data. The completed analysis software also includes the functions of processing and analyzing power performance measurement data in accordance with IEC 61400-12. The analysis software was effectively applied to process and analyse the load measurement data from a demonstration research for a 750 kW direct-drive wind turbine generator system (KBP-750D), performed at the Daegwanryeong Wind Turbine Demonstration Complex. This paper describes the details of the analysis software and its processing and analysis stages for load measurement data and presents the analysis results.

Exploratory approach to measuring facility performance in public service facilities (공공서비스시설에서의 시설성능 요인에 대한 탐색적 연구)

  • Lee, So-Young;Shin, Hee-Young
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2009.04a
    • /
    • pp.284-287
    • /
    • 2009
  • In order to plan and manage public facilities effectively and efficiently, it is necessary to diagnose the current status of facilities and decide the objective features. Performance measurement is to provide managers with the information they need to measure competitive advantages. This paper discusses public facility performance in order to establish the conceptual framework for performance measurement for public facilities. In order to develop the measurement of public facility performance, a pilot study was conducted with facilities managers of facilities management corporation of public districts in Seoul. We investigated how public facilities management teams have assessed their performance and collected data regarding financial aspects, service aspects, community aspects, and building aspects. There is no standard format to measure facility performance since building sizes, programs, community needs widely differ. However, it is necessary to have a more consistent system to measure facility performance. In addition, each public municipal district needs to empower each district facilities management corporation to participate in managerial decisions and budget control.

  • PDF

Implementation of the Performance Information Integration Method for Multiple Performance measures (다수의 성과척도를 통합하는 방법의 적용사례)

  • 박창규
    • Korean Management Science Review
    • /
    • v.16 no.2
    • /
    • pp.109-123
    • /
    • 1999
  • We have recognized that an organization should be viewed from a multifaceted perspective necessitating a sophisticated analytical and systematic approach to monitor and improve organizational performance. Although some performance measurement systems have been proposed and are currently being used in many organizations, no performance measurement system has presented a mechanism for integrating all of the information of performance measures in a way that considers relationships between them. This paper introduces the implementation of the performance information integration method(PIIM) which synthesizes all useful information of performance measures with consideration of the relationship and generates a single, global, organizational performance score. The PIIM was empirically validated by implementing in one of missouri Veterans Homes.

  • PDF

An AHP Approach to Evaluate the priorities of Manufacturing Performance Criteria in Korean Automobile Parts Manufacturing Company (AHP에 의한 한국자동차부품제조사의 제조성과기준의 중요도 평가)

  • Kim, Tae-Soo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.34 no.3
    • /
    • pp.115-122
    • /
    • 2011
  • The critical role played by manufacturing performance measurement systems in achieving competitive success is increasingly recognized. Developing an integrated performance measurement model is significant for strategic management. This study consist of several principal steps. Performance criteria from the literature and an questionnaire were utilized prior to building the performance model. The AHP(Analytic Hierarchy Process) is utilized to evaluate the weight of each criterion when generating the performance measurement model for Korea automobile parts manufacturing company. AHP analysis showed clear difference in the priority between 5 criteria and 24 sub-criteria in terms of manufacturing performance of Korean automobile parts manufacturing company. The result of priority evaluation in the 5 criteria of 2nd level was ranked quality, cost, delivery, employee, flexibility. And the critical sub-criteria in the 24 sub-criteria of 3rd level was ranked claim rate, process defect rate, outsourcing parts defect rate, ability to quality management innovation, claim cost, etc.