• Title/Summary/Keyword: Maximum installed capacity

Search Result 103, Processing Time 0.026 seconds

Determining the Maximum Capacity of a Small Wind Turbine System Considering Live Loads of Buildings (건물의 활하중을 고려한 소형풍력발전시스템의 최대 설비용량 선정기법)

  • Lee, Yeo-Jin;Kim, Sung-Yul
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.65 no.3
    • /
    • pp.165-170
    • /
    • 2016
  • Due to environmental issues such as global warming, the reduction of greenhouse gas emissions has become an inevitable measure to be taken. Among others, the building sector accounts for 50% of total carbon dioxide emissions, which is significantly high. Therefore, in order to reduce carbon dioxide emissions of the buildings, improving the energy efficiency by utilizing wind power among renewable energy sources is recommended. In case of buildings in the planning stage, it is possible to take the load of wind power generation systems into consideration when determining installed capacity. Already completed buildings, however, should be connected to small wind electric systems according to the live loads of the buildings based on the architectural design criteria. In order to connect to a building that has already been completed, it is necessary to consider the load of the small wind electric system as well as the live load of building. In addition, we need to generate the maximum electricity possible by determining the maximum installed capacity in a small area. In this paper, we propose the method for determining maximum capacity for building integrated small wind electric systems, which takes into account the considerations associated with connecting small wind electric systems to completed buildings. This can be developed into a system linked to solar power, which makes it possible to improve the energy independence of the building. In addition, carbon dioxide reduction by improving energy efficiency is expected.

Estimation of Carrying Capacity in Kamak Bay ( II ) - Estimation of carrying capacity of oyster culture ground - (가막만의 환경용량 산정 ( II ) -굴양식장 환경용량 산정-)

  • CHO Eun-Il;PARK Chung-Kil;LEE Suk-Mo
    • Korean Journal of Fisheries and Aquatic Sciences
    • /
    • v.29 no.5
    • /
    • pp.709-715
    • /
    • 1996
  • In order to estimate the carrying capacity of oyster culture ground in Kamak Bay, primary productivity was calculated using the ecosystem model. The allowable maximum oyster production, namely, the carrying capacity of Kamak Bay was estimated by using the annual phytoplankton production and conversion coefficient to oyster meat. On the environmental conditions of oyster culture period from lune, 1994 to March, 1995, phytoplankton production, the allowable maximum oyster production were estimated to be 181,594 tons of carbon and 287,033 tons of oyster meat, respectively. The allowable maximum oyster production was estimated to be 15,443 tons in the actual culture ground where oyster culture facilities are installed in Kamak Bay. In 1994 4,532 tons of actual oyster meat production was equivalent to ra. $29\%$ of carrying capacity, and in 1987 it was 14,592 tons equivalent to ca. $95\%$.

  • PDF

Characteristics of Uplift Capacity of a Embedded Foundation and Soil Type (매입기초와 토질에 따른 인발저항력 특성)

  • Lim, SeongYoon;Kim, YuYoung;Yu, SeokChul;Kim, MyeongHwan
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.3
    • /
    • pp.23-30
    • /
    • 2019
  • In this study, we evaluated the applicability of proper embedded depth of fillings by examining the uplift resistance using spiral foundation and top base foundation. As a result of the model test, the maximum uplift resistance increased with the embedded depth. The maximum uplift resistance of each region was found to be 50cm depth. The spiral foundation was 335.14N of Sancheong, 312.32N of Seongju, 403.94N of Wanju, and the top base foundation was 745.06N of Sancheong, 1028.82N of Seongju and 950.76N of Wanju. The yield point after the elastic section in the stress-displacement graph of the top base foundation was calculated as the maximum uplift resistance. For this reason, farmers do not actually use top bases foundation. Therefore, it was considered that the additional load increase due to slip connector will not occur. Model test results show that the maximum uplift resistance increases with the purlinss installed under the ground. Therefore, additional comparative studies through purlins installation will be needed.

Behavior of Small-Scale Pile Group Under Vertical Loading (연직하중을 받는 소규모 무리말뚝의 거동)

  • 이영남;이승현;박영호
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.6
    • /
    • pp.37-46
    • /
    • 2001
  • Pile load tests were carried out to investigate the contribution of the pile cap to the carrying capacity of a pile group and load transfer characteristics of piles in the group. A group of 24 piles$(4 \times6 array)$ of 92.5mm diameter steel pipe were installed to the depth of 3m fron the ground surface, the top of weathered rock. A maximum load of 320ton was applied to the pile cap, $1.5\times2.3m$, in contact with the ground surface. At the maximum load of 320ton, the pile cap has carried 22% of the total load. Average ultimate capacity of pile in the pile group was estimated to be 16.4ton, substantially higher than that of single pile, installed at the corner and tested before pile cap construction. For the same magnitude of settlement, the pile in the center carried less load than the pile at the perimeter due to strain superposition effect. Piles in the group showed almost constant contribution(approx. 60%) of side friction to the total capacity for all of the loading stages, while that of single pile decreased from 82% to 65%.

  • PDF

Design of supplemental viscous dampers in inelastic SDOF system based on improved capacity spectrum method

  • Li, Bo;Liang, Xing-Wen
    • Structural Engineering and Mechanics
    • /
    • v.27 no.5
    • /
    • pp.541-554
    • /
    • 2007
  • A simplified yet effective design procedure for viscous dampers was presented based on improved capacity spectrum method in the context of performance-based seismic design. The amount of added viscous damping required to meet a given performance objective was evaluated from the difference between the total demand for effective damping and inherent damping plus equivalent damping resulting from hysteretic deformation of system. Application of the method is illustrated by means of two examples, using Chinese design response spectrum and mean response spectrum. Nonlinear dynamic analysis results indicate that the maximum displacements of structures installed with supplemental dampers designed in accordance with the proposed method agree well with the given target displacements. The advantage of the presented procedure over the conventional iterative design method is also highlighted.

Economy Analysis and Optimized Capacity Evaluation of Photovoltaic-Related Energy Storage System (태양광 에너지저장장치(ESS) 경제성 분석 및 최적 용량 평가)

  • Lee, Young-Hun;Sung, Tae-Hyun
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.25 no.2_2
    • /
    • pp.209-218
    • /
    • 2022
  • The purpose of this study is to analyze an economic assessment of PV-ESS systems based on the power generation performance data of solar power (PV) operating in domestic area, and to calculate the optimal capacity of the energy storage system. In this study, PVs in Gyeonggi-do, Jeollabuk-do, and Gyeongsangbuk-do were targeted, and PVs in this area were assumed to be installed on a general site, and the research was conducted by applying weights based on the facility's capacity. All the analysis was conducted using the actual amount of KPX transactions of PVs in 2019. In order to calculate the optimal capacity of PCS and BESS according to GHI, PV with a minimum/maximum/central value was selected by comparing the solar radiation before the horizontal plane between three years (2017-2019) of the location where PV was installed. As a result of the analysis, in Gyeonggi-do, if the REC weight decreases to 3.4 when there is no change in the cost of installing BESS and PCS, it is more economical to link BESS than PV alone operation of PV. In Jeollabuk-do, it was analyzed that if the REC weight was reduced to 3.6, it was more likely to link BESS than PV operated alone. In Gyeongsangbuk-do, it was analyzed that if the REC weight was reduced to 3.4, it was more likely to link BESS than PV operated alone.

A Study on Hammer Performance Evaluation (항타장비의 성능평가 연구)

  • 홍헌성;이명환;조천환;김성회;전영석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.405-412
    • /
    • 2002
  • The performance of a hammer/driving systems is a major factor which affects bearing capacity and integrity of installed piles. Hammer performance can be evaluated from the results of dynamic pile testing using Pile Driving Analyzer(PDA). By comparing the rated energy with measured maximum transferred energy(EMX), the energy transfer ratio(ETR) can be calculated. This paper based on the dynamic measurements of 442 cases in 130 piling projects and evaluated ETR according to the hammer types(hydraulic and drop hammers) and pile types(steel and concrete piles).

  • PDF

A Study on Establishing Operation Mathematical Model for Optimum Capacity Estimation of the ESS Applications for each in the Nationwide Perspective (국가적 관점에서 용도별 ESS 적정용량 산정을 위한 운전수리모델 수립에 대한 연구)

  • Kim, Jung-Hoon;Youn, Seok-Min
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.65 no.6
    • /
    • pp.969-978
    • /
    • 2016
  • Around the world are increasing the demand for ESS. Currently, the domestic is expected to benefit by operating ESS. In the domestic, it is expected to benefit from operations of the installed ESS because of the introduction of ESS less capacity. However ESS capacity to the maximum profit occurs is unknown. ESS is different from the charge-discharge characteristics and the reserve to replace, depending on the application. Therefore, it should be established in accordance with the ESS optimal capacity according to the purpose used because it can maximize the quality and efficiency of the electric energy. To the ESS optimal capacity estimation by the purpose used, It should compare the investment cost caused by ESS facility installation and operation cost caused by operating ESS. In this paper, the operation mathematical model for estimating marginal operation costs established. In operation mathematical model, operating cost is considered fuel cost and no-load cost start-up cost. Because no-load cost and start-up cost are not related to cost and power plant output, there are expressed an integer variable costs as a step function.

Experimental study on combustion characteristics of high efficiency oxy-fuel burner (고효율 순산소 버너의 연소 특성에 관한 실험적 연구)

  • Kim, Se-Won;Ahn, Jae-Hyun;Kim, Min-Soo
    • 한국연소학회:학술대회논문집
    • /
    • 2002.11a
    • /
    • pp.57-64
    • /
    • 2002
  • This paper describes the results of a series of experiments executed by using two pilot-scale oxv-fuel burners are designed for maximum capacity of 50,000 kacl/hr, 300,000 kcal/hr and installed in the test furnace. The effects of turn-down ratio, excess oxygen ratio, nozzle exit velocity, injection angle, swirl vane angle and inlet oxygen temperature on the combustion characteristic are investigated. Temperature distributions are measured using R-type and Molybdenum sheathed C-type thermocouple. The results showed that maximum temperature and mean temperature increase with the increase of turn-down ratio and inlet oxygen temperature. The maximum flame temperature was increased about 35% compared to the case of equivalent air operated condition. In addition, Optimum excess oxygen ratio and nozzle characteristics are obtained for this oxy-fuel glass melting furnace.

  • PDF

Experimental study on combustion characteristics of oxy-fuel glass melting furnace (순산소를 이용한 유리 용해로의 연소특성에 관한 실험적 연구)

  • Kim, Se-Won;Ahn, Jae-Hyun;Kim, Yong-Mo;Shin, Myung-Chul
    • Journal of the Korean Society of Combustion
    • /
    • v.9 no.1
    • /
    • pp.1-10
    • /
    • 2004
  • The results of a series of experiments executed by using two pilot-scale oxy-fuel burners are presented. The oxy-fuel burners are designed for maximum capacity of 50,000kcal/hr, 200,000kcal/hr and installed in the test furnace. The effects of turn-down ratio, excess oxygen ratio, nozzle exit velocity, injection angle, and swirl vane angle on the combustion characteristic are investigated. Temperature distributions are measured using R-type and Molybdenum sheathed C-type thermocouple at various points of the flame. The results showed that maximum temperature and mean temperature increase with the increase of turn-down ratio and momentum. The maximum flame temperature was increased about 35% compared to the case of equivalent air operated condition. In addition, optimum burner type, excess oxygen ratio and nozzle characteristics are obtained for this oxy-fuel glass melting furnace.

  • PDF