• Title/Summary/Keyword: Maturity Assessment

Search Result 162, Processing Time 0.029 seconds

A Maturity Model to Assess the Enterprise Architecture in Government (공공부문 전사적 아키텍처 평가를 위한 성숙도 모델)

  • Seo, Kyeong-Seog;Lee, Hyun-Jeong;Chong, Ki-Won
    • The Journal of Society for e-Business Studies
    • /
    • v.11 no.4
    • /
    • pp.21-32
    • /
    • 2006
  • When Enterprise Architecture(EA) is defined and applied, it is needed to assess the EA capability, and to identify guides for improvement. According to these needs, this paper presents an enterprise architecture maturity model to assess the EA capability, to identify the details for improving EA, to suggest the guides for improvement, and to support decision-making for investment. The model which refers to the continuous representation of CMMI consists of 5 maturity levels, 4 capability areas including 15 capability elements, and capability indications to make a determination of maturity level by capability elements. The model concentrates on the development/stabilization of EA and the connection/coordination over the federal agencies.

  • PDF

The Development of Infant Montessori Performance Assessment Scales - Centered on 6 to 24 Month Infants - (영아용 몬테소리 수행평가 도구 개발 - 6~24개월 영아를 중심으로 -)

  • Kim, Myung-Hee;Shin, Hwa-Sik;Kim, Ji-Young;Kim, Min-Sun
    • Korean Journal of Child Studies
    • /
    • v.26 no.2
    • /
    • pp.27-41
    • /
    • 2005
  • The purpose of this study was to test the reliability and validity of the Infant Montessori Performance Assessment Scales developed by the authors. Subjects of the study consisted of 132 Montessori teachers and 50 infants who were attending Montessori home school throughout the whole country, using census method. Infant's age ranged from 6 to 24 months. Data were analysed by using SAS 8.2 PC program. Statistical methods employed were frequency, Cronbach's alpha, Kappa coefficient, test-retest correlation, construct validity, and concurrent validity. The Cronbach's alpha of 6 sub-scales included physical, creativity, practical life, sense, language, and cognitive education, which ranged from .70 to .86. And the! correlation of the test/re-test was .72. The correlation between the 6 sub-scales of Infant-Montessori Performance Assessment Scales and the total scores of 6 items ranged from .06 to .84. Therefore, the construct validity of Infant Montessori Performance Assessment Scales was verified. The Kappa coefficient of inter-rater reliability was .76. The correlation between the Infant Montessori Performance Assessment Scales and the Standardized Korean Creativity Traits Checklist(K-CTC) and the Korean Child Social Maturity Scales showed non-significant levels of .16 and .12 respectively. Conclusively, Infant Montessori Performance Assessment Scales developed by the authors were verified through the above reliability and validity tests. Specifically the Infant Montessori Performance Assessment Scales showed the relationship of the convergent and divergent validity with the Korean Child Social Maturity Scales and the Standardized Korean Creativity Traits Checklist, respectively.

  • PDF

Predicting the Compressive Strength of Concrete Using a Maturity Concept (적산온도개념을 이용한 콘크리트 압축강도 예측)

  • Ko, Hune-Bum
    • Journal of the Korea Convergence Society
    • /
    • v.13 no.1
    • /
    • pp.229-234
    • /
    • 2022
  • The non-destructive method of easily evaluating concrete strength through the concept of maturity has been verified by many researchers. The current work introduced such a concept in concrete strength assessment that involved 843 variables and specific values that 11 papers used in experiments, including constant temperatures (5, 10, 20, 30, 40, 50℃) with a W/B range of 18 to 70% and different curing ages (0.5 to 182 days). The classification of concrete as being of normal-strength concrete (40MPa or less), high-strength concrete (40~70MPa), and Super high-strength concrete (70MPa or more) enabled this study to identify the relationship between maturity and concrete strength using the most convenient and easily applicable maturity model in the construction field. A regression formula of lowest guaranteed concrete strength on the basis of maturity was presented.

Assessing the Maturity of Central Place Using Focal Location Quotients (포칼 입지계수를 이용한 중심지 성숙도 평가)

  • Lee, Byoungkil
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • v.31 no.3
    • /
    • pp.221-228
    • /
    • 2013
  • In areas such as trade area analysis and urban planning, the maturity assessment of central places is important information to be taken into account for rational decision-making. In this study, 3 business areas, typical retail businesses (retail, personal service, food and beverage), are extracted from year 2004 and 2009 phone books, and centrality index and location quotients for 3 business areas are calculated. Using these outputs growth, declination, and maturation of central places are figured out, then comparing and analyzing these results assessment method for central places is proposed. As a result, it is known that the maturity of central place, such as growing, declining, and maturing, can be assessed by comparing the location quotients of 3 retail business areas. In growing central place, location quotient of food and beverage business is much higher than others, and in maturing central place, that of retail business is much higher than others. Assessment results of central places are very useful, as an important index, to determine branch opening or select business area, in trade area analysis.

A Study on the Adoption of SPICE in the Railway Software (철도분야 소프트웨어로의 SPICE 적용연구)

  • Joung, Eui-Jin;Shin, Kyung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.04b
    • /
    • pp.316-318
    • /
    • 2006
  • It can be considered that the safety of software is combined with that of hardware, and also directly connected to system safety. Because the software in the railway system takes the form of Embedded that let it behave at the system level, instead of independent operation, the safety of the railway S/W is also important. The approach, for ensuring the quality and safety of those software, can be considered with two points of view. Those are views seeing from products, and from processes. The two points of approach are all necessary in the railway system. For the first of all, the process approach is to validate maturity of the organizations in accordance to the judging processes of organizations, which are specified by CMMI(Capability Maturity Model Integration) or SPICE(Software Process Improvement and Capability dEtermination: ISO/IECl5504). In this paper, as the first step of them, we are trying to find approaches to estimate the maturity of manufacturer and assessment organization in the railway system.

  • PDF

A Study on the Approach to Achieve Software Quality in Railway (철도소프트웨어 품질향상 방안 고찰)

  • Joung, Eui-Jin;Shin, Kyung-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2006.07b
    • /
    • pp.1132-1133
    • /
    • 2006
  • The approach, for ensuring the quality and safety of a railway software can be considered with two points of views seeing from products, and from processes. The process point of view is to validate maturity of the organizations in accordance to the judging processes of organizations, which are specified by CMMI(Capability Maturity Model Integration) or SPICE(Software Process Improvement and Capability dEtermination : ISO/IEC15504). In this paper, we are trying to find approaches to estimate the maturity of manufacturer and assessment organization in the railway system.

  • PDF

A Study on the Railway S/W Quality Enhancement Procedure on the View of S/W Process (프로세스 관점의 철도소프트웨어 품질향상방안 연구)

  • Joung, Eui-Jin;Shin, Kyung-Ho
    • Proceedings of the IEEK Conference
    • /
    • 2006.06a
    • /
    • pp.1025-1026
    • /
    • 2006
  • The approach, for ensuring the quality and safety of a railway software can be considered with two points of views seeing from products, and from processes. The process point of view is to validate maturity of the organizations in accordance to the judging processes of organizations, which are specified by CMMI(Capability Maturity Model Integration) or SPICE(Software Process Improvement and Capability dEtermination : ISO/IEC15504). In this paper, we are trying to find approaches to estimate the maturity of manufacturer and assessment organization in the railway system.

  • PDF

Improvement of the Automobile Control Software Testing Process Using a Test Maturity Model

  • Jang, Jin-Wook
    • Journal of Information Processing Systems
    • /
    • v.14 no.3
    • /
    • pp.607-620
    • /
    • 2018
  • The problem surrounding methods of implementing the software testing process has come under the spotlight in recent times. However, as compliance with the software testing process does not necessarily bring with it immediate economic benefits, IT companies need to pursue more aggressive efforts to improve the process, and the software industry needs to makes every effort to improve the software testing process by evaluating the Test Maturity Model integration (TMMi). Furthermore, as the software test process is only at the initial level, high-quality software cannot be guaranteed. This paper applies TMMi model to Automobile control software testing process, including test policy and strategy, test planning, test monitoring and control, test design and execution, and test environment goal. The results suggest improvement of the automobile control software testing process based on Test maturity model. As a result, this study suggest IT organization's test process improve method.

Case Study of Risk Management on Communication Payload System Development (통신탑재체 개발 위험관리 Case Study)

  • Jeong, Cheol-Oh;Eun, Jong-Won
    • Journal of Aerospace System Engineering
    • /
    • v.5 no.2
    • /
    • pp.8-11
    • /
    • 2011
  • The scope of this paper is to show a risk management plan including how to perform risk assessment and to make a mitigation plan aspects of the communication payload system development. According to system engineering management guide of DoD of USA and risk management plan of satellite communication system, risk assessment and mitigation plan of communication payload system were performed. In this paper, it is indicated the process of risk management and risk assessment procedures as well as mathematical model for risk assessment of DoD guide. It is shown how risk assessment and mitigation plan have implemented in communication payload system development through case study.

THE PUBERTAL GROWTH SPURT AND SKELETAL MATURITY STAGES OF THE HAND-AND-WRIST IN NORMAL OCCLUSION (정상교합자의 사춘기성장과 수완부골 성숙단계에 관한 연구)

  • Park, Jin-Sung;Suhr, Cheong Hoon
    • The korean journal of orthodontics
    • /
    • v.15 no.2
    • /
    • pp.197-209
    • /
    • 1985
  • To investigate the relationship between the pubertal spurt in body height and bone maturity of the hand-and-wrist in normal occlusion, the author X-rayed the hand-and-wrists of 1,141 students (male 614, female 527) and assessed their bone maturity. In this study, eleven skeletal stages were selected. The bones used to determine skeletal maturity were the ulnar sesamoid of the metacarpophalangeal joint of the first finger, the epiphyses of the proximal, middle, distal phalanges of the third finger, and middle phalanx of the fifth finger, and distal epiphysis of the radius. From the longitudinal data for height, an assessment was made of the change in growth velocity. The pubertal growth stage was divided into onset and peak height velocity phases. The results were as follows; 1. The onset of the pubertal growth was between the $PP_3=\;and\;MP_3=$ stage for boys, and between the $MP_3=\;and\;MP_5=$ stage for girls; the mean age of onset was 10.6 years for boys and 9.0 years for girls. 2. The peak height velocity was between the S and $MP_{3_{cap}}$ stage for boys, and between the $MP_{3_{cap}}$ and $MP_{5_{cap}}$ stage for girls; the mom age of peak height velocity was 12.5 years for boys and 10.9 years for girls. 3. As the stages of bone maturity progressed from $DP_{3u},\;to\;PP_{3u},\;MP_{3u}$, Ru, the peak height velocity had been reached, and the growth rate retarded, therefore the approach to full physical maturity was attained. 4. The evidence for the period of onset, peak height velocity and bone maturation suggested that girls were in advance of boys. During the latter part of pubertal growth, the rate of boys' bone maturation was faster than that of girls'.

  • PDF