• Title/Summary/Keyword: Material Requirement Planning

Search Result 33, Processing Time 0.024 seconds

A Study on how to Associate the Attribute of Procurement and the Calculated Material Requirement by Integrating Schedule and Cost (비용${\cdot}$일정 통합관리를 이용한 자원소요량산출과 발주속성 연계에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.498-503
    • /
    • 2002
  • Connecting with cost, schedule, and quality in a construction project, resource management is one of the essential management elements. However, the material requirement planning is built at the beginning stage of construction and needs various concerned factors, it is limited to build the resource management planning on enterprise level. The disconnected communication among managements makes impossible to control historical data. In the construction project control system, the core of management elements is to manage cost and schedule information, therefore material requirement planning should be established based on historical data about EVM which is intergating schedule and cost. In this study, a resource management system concerning material requirement planning and attribute of procurement is suggested by connecting the historical data of EVM and the material requirement planning.

  • PDF

High performance MRP(Material Requirement Planning) system based on tree-structured BOM(Bill of Material) (트리 구조의 BOM(Bill of Material)에 기초한 고성능 MRP(Material Requirement Planning) 시스템)

  • Na Hong-Bum;Lee Hyung-Gon;Park Jin-Woo
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2006.05a
    • /
    • pp.601-602
    • /
    • 2006
  • The primary role of MRP(Material Requirement Planning) is to make a production plan so that we have an exact quantity of right materials on needed time at right place. But the ignorance on capacity constraints makes some problems whenever production schedule is established. To increase the performance of MRP system, a novel approach which is based on new input data structure is suggested. The new input data structure includes all the information about Material BOM, Routing and resource data so that we can easily examine the usage of resources and generate higher performance production plans.

  • PDF

A Study on Material Requirement Planning by Integrating Schedule and Cost (비용$\cdot$일정 통합관리를 이용한 자원소요계획에 관한 연구)

  • Song Young-Woong;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.106-113
    • /
    • 2003
  • In this study, The matrix method was used with common category concept according to the construction project control system. For the purpose of systematic resource management planning, it should be established on accomplished EVM data for clearing the ordering point according to the attribute procurement analysis. Resource management was presented by connecting the material requirement calculation method and the attribute of procurement method based on the EVM, suggested through analyzing process-data modeling using integrated schedule, cost and material.

Development of Distributed MRP System for Production Planning and Operation in Korean OEM/ODM Cosmetics Manufacturing Company (국내 OEM/ODM 화장품 제조기업의 생산계획 및 효율화를 위한 분산형 MRP시스템 개발)

  • Jang, Dongmin;Shin, Moonsoo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.43 no.4
    • /
    • pp.133-141
    • /
    • 2020
  • Up to date cosmetic OEM/ODM (original equipment manufacturing/original development manufacturing) industry receives attention as a future growth engine due to steady growth. However, because of limited research and development capability, many companies have employed commercial management platforms specialized for large-sized companies; thus, overall system effectiveness and efficiency is low. Especially, MRP (material requirement planning) system introduced originally in 1970s is employed to calculate the requirement of the parts. However, dynamic nature of production lead time usually results in incorrect requirements. In addition, its algorithm does not consider the capability of the production resources. Also, because the commercial MRP system calculates all subcomponent for fixed period, the more goods have subcomponent, the slower calculation is. Therefore, conventional MRP system cannot respond complicated situation in time. In this study, we will suggest a new method that can respond to complicated situations resulting from short lead time and urgent production order in Korean cosmetic market. In particular, a distributed MRP system is proposed, that consists of multi-functional and operational modules, based on the characteristic of the BOM (bill of material). The distributed MRP system divides components (i.e. products and parts) into several fields and decrease the problem size; thus, we can respond to dynamically changed data any time. Through this solution, we can order components quickly, adjust schedules and planned quantity, and manage stocks reasonably. In addition, a prototype of the distributed MRP system is presented in this paper, in which ERP (enterprise resource planning) sever data is associated with an excel spreadsheet via MSsql. System user interface is implemented by a VBA (visual basic for applications) tool. According to a case study, response rate for delivery and planning achievement rate were enhanced about 20%, and inventory turnover was also decreased. Consequently, the proposed system improves overall profit.

A Control Account Planning Using Material Requirement Planning in Earned Value Project (MRP기법을 이용한 EV프로젝트의 관리계정계획)

  • Kim Soo-Yong;Lee Yang-Ho;An Dong-Geun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.114-122
    • /
    • 2002
  • Earned Value Management System(EVMS) is a management technique that is emerging as a valuable tool in the management of all projects, including and in particular construction projects. It is based on C/SCSC that has been released by the U.S. Department of Defense (DOD) in 1967. In a project that employs the earned value management concept, the project's measurable performance plans will be formed with the creation of CAPs. The formation of CAPs is a planning step necessary to form an earned value baseline. In this paper, a method is proposed to form CAPs using Material Requirement Planning(MRP) that is also known as a useful planning tool in the manufacturing industry. An application to a real project has been carried through workpackaging model.

A Study on the Work Package and Resource Planning of En by using the Material Requirement Planning(MRP) (MRP기법을 이용한 EVMS의 복합작업$\cdot$자원계획에 관한 연구)

  • Kim Soo-Yong;Lee Yang-Ho;Lee Young-Dae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.410-415
    • /
    • 2001
  • Earned Value Management System(EVMS) has been considered as a useful tool of managing construction projects lately and its instruction into a private industry is now under consideration by the Korean government. It is on the basis of C/SCSC that had been released by the U.S. Department of Defense(DOD) since 1967. Its research has been in the active progress in order to utilize the earned value concept as a project management tool for construction project ordered by both government and private sector. Material Requirement Planning(MRP) is also known as a tool of planning and scheduling resources for assembly product as a part of inventory control models in the manufacturing industry. The purpose of this study is the effective employment of Earned Value Management to manage the construction projects by utilizing Material Requirement Planning(MRP), based on project management software and Workpackaging model.

  • PDF

Multi-product, multi-site production and transportation scheduling problem (다품종 복수공장 생산에서의 생산분배 및 수송계획 문제연구)

  • 장병만
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1993.04a
    • /
    • pp.36-45
    • /
    • 1993
  • This paper presents a model and a heuristic procedure to design production planning and transportation scheduling systems of critical items, components and products on the basis of material requirement planning concept and transportation planning model. These systems are stemmed from a multi-site multi-product production company in a international economic zone. An example is provided to validate the heuristic procedure developed.

  • PDF

Design and Implementation of UML-Based Material Management System for Automotive Part Company (자동차부품기업의 UML기반 자재관리시스템 설계 및 구현)

  • Park Jung-Hyuk;Seo Ki-Chul;Moon Tae-Soo
    • The Journal of Information Systems
    • /
    • v.12 no.2
    • /
    • pp.129-149
    • /
    • 2003
  • One of the important applications in Enterprise Resource Planning(ERP) systems is the Manufacturing Resource Planning(MRPII) system using Bill of Material(BOM). The manufacturing resource planning determines the quantity and timing of the production or purchase of subassemblies and raw materials needed to support the Master Production Scheduling(MPS). The bill of material is the recipe, a list of the materials needed to make a product. This paper intends to suggest a component-based materials management system using Unified Modeling Language(UML), as an application system for automobile part industry. Applying component based materials management systems designed with UML methodology, we analyzed the workflow and the document on materials management process from production planning to inventory management, and implemented a prototype of efficient materials management system, as a surrogate of existing material requirement planning(MRPI) system. To produce many other assemblies for a automobile part firm, component parts are assembled into subassemblies that are joined to assemble the finished product. Through the system suggested in this study, the level of inventory has cut down and the cost of inventory management has decreased. Also, the development method using UML makes the analysis and design phase to shorten in implementation period of MRPII system. The implementation of materials management system using CBD shows the ease of use in software reuse and the interoperability with corporate Internal information system. The result of applying object-oriented CBD technique is to minimize the risk of life cycle and facilitate the reuse of software as mentioned to limitation of information engineering methodology.

  • PDF

A Finite Capacity Material Requirement Planning System for a Multi-Stage Assembly Factory: Goal Programming Approach

  • Wuttipornpun, Teeradej;Yenradee, Pisal;Beullens, Patrick;van Oudheusden, Dirk L.
    • Industrial Engineering and Management Systems
    • /
    • v.4 no.1
    • /
    • pp.23-35
    • /
    • 2005
  • This paper aims to develop a practical finite capacity MRP (FCMRP) system based on the needs of an automotive parts manufacturing company in Thailand. The approach includes a linear goal programming model to determine the optimal start time of each operation to minimize the sum of penalty points incurred by exceeding the goals of total earliness, total tardiness, and average flow-time considering the finite capacity of all work centers and precedence of operations. Important factors of the proposed FCMRP system are penalty weights and dispatching rules. Effects of these factors on the performance measures are statistically analyzed based on a real situation of an auto-part factory. Statistical results show that the dispatching rules and penalty weights have significant effects on the performance measures. The proposed FCMRP system offers a good tradeoff between conflicting performance measures and results in the best weighted average performance measures when compared to conventional forward and forward-backward finite capacity scheduling systems.

The Method for Quality Measurement of ERP System about the Construction Sector (건설 분야 ERP 시스템의 품질측정 방법)

  • Yeom, Chun-Young;Kim, Sun-Bae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.10 no.8
    • /
    • pp.2044-2054
    • /
    • 2009
  • ERP is the Enterprise Resource Planning System developed from MRP aiming at effective management of the manufacture material. Until recently, the part of ERP solution has been led by domestic solution company. But, as foreign solution companies go into developing ERP solution, Korea became a battle ground of ERP solution. This situation requires the effort for quality improvement. The main theme of this study is development of quality measurement method of ERP system about construction field. We developed the method of quality characteristics system and quality measurement metrics, and proposed an effective evaluating method by application case. We expect that this study is a great help in measuring the construction part ERP system through the application about quality measurement.