A Control Account Planning Using Material Requirement Planning in Earned Value Project (MRP기법을 이용한 EV프로젝트의 관리계정계획)

  • Kim Soo-Yong;Lee Yang-Ho;An Dong-Geun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.4 s.12
    • /
    • pp.114-122
    • /
    • 2002
  • Earned Value Management System(EVMS) is a management technique that is emerging as a valuable tool in the management of all projects, including and in particular construction projects. It is based on C/SCSC that has been released by the U.S. Department of Defense (DOD) in 1967. In a project that employs the earned value management concept, the project's measurable performance plans will be formed with the creation of CAPs. The formation of CAPs is a planning step necessary to form an earned value baseline. In this paper, a method is proposed to form CAPs using Material Requirement Planning(MRP) that is also known as a useful planning tool in the manufacturing industry. An application to a real project has been carried through workpackaging model.

A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works - (시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축 - 철근콘크리트 업체를 중심으로 -)

  • Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.19-32
    • /
    • 2015
  • For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.

Construction Progress Management System for PPC Implementation (작업성취율 활용을 위한 공정관리체계)

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.3
    • /
    • pp.57-65
    • /
    • 2007
  • Last Planner System (LPS) developed by Lean Construction Institute consists of four steps: Master Schedule, Phase Schedule, Lookahead Planning and Weekly Work Plan. This paper focuses on the process of measuring Percent of Plan Completed (PPC) at the weekly Work Plan stage. PPC means the percentage of weekly assignments completed. According to the results of the researches that deal with PPC from many other countries, we can assure the benefits or using PPC. However the concept of PPC is unfamiliar in Korea construction industry. This paper analyzes the cases in which PPC is applied in other countries and compares them with the production control system in Korean construction industry. The results of this research will provide the time management system for using PPC in Korea.

INTRA-AND INTERGOVERNMENTAL INFORMATION SYSTEM TO MANAGE INFORMATION IN URBAN RENEWAL PROJECT

  • Dong-bum Kim;Jin-Won Kim;Ju-Hyung Kim;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.561-566
    • /
    • 2011
  • In general, the early stage of urban renewal such as preparing a master plan and processing administrative works including planning permission are conducted by local governments in Korea. The local governments need to review the status of projects that are undergone in other local governments' territories. However, no integrated information system to manage information to this end at the level of nation exists in Korea. If the system would be developed, it may support central government to obtain information on required resources at the national level. In addition, local governments can gain guidance on the process and recognize potential problematic situations from others experience. The system should include functions to collect data on project summary, cost and schedule of projects according to local governments. The expected effects from using the information system are as following. First, information generated from project practice become more credible on account of management at the national level. Because the authorized party such as system administrative agents of governments are responsible for collecting and managing data. Second, the unified information system with no regard to the place where projects progresses reduces the efforts for accumulating reference data for aiding local governments decision making by providing appropriate information timely. Also, enhanced information accessibility for stakeholders make the project process clear. Finally, oversight management is enforced with visualization technology adopted in the system, presenting master plan and mass model including information on usage by floors and progressing information graphically. Ultimately, potential challenges can be anticipated by considering records accumulated from other local governments' projects. This paper presents concept, functionalities, and architecture of information system enabling to manage data from individual projects and aggregate those for oversight management for local and central governments. As a part of systems analysis, general requirements of briefing system for governments and necessary data fields to this end are identified.

  • PDF

Optimal Hourly Scheduling of Community-Aggregated Electricity Consumption

  • Khodaei, Amin;Shahidehpour, Mohammad;Choi, Jaeseok
    • Journal of Electrical Engineering and Technology
    • /
    • v.8 no.6
    • /
    • pp.1251-1260
    • /
    • 2013
  • This paper presents the optimal scheduling of hourly consumption in a residential community (community, neighborhood, etc.) based on real-time electricity price. The residential community encompasses individual residential loads, communal (shared) loads, and local generation. Community-aggregated loads, which include residential and communal loads, are modeled as fixed, adjustable, shiftable, and storage loads. The objective of the optimal load scheduling problem is to minimize the community-aggregated electricity payment considering the convenience of individual residents and hourly community load characteristics. Limitations are included on the hourly utility load (defined as community-aggregated load minus the local generation) that is imported from the utility grid. Lagrangian relaxation (LR) is applied to decouple the utility constraint and provide tractable subproblems. The decomposed subproblems are formulated as mixed-integer programming (MIP) problems. The proposed model would be used by community master controllers to optimize the utility load schedule and minimize the community-aggregated electricity payment. Illustrative optimal load scheduling examples of a single resident as well as an aggregated community including 200 residents are presented to show the efficiency of the proposed method based on real-time electricity price.

Security Constrained Optimal Power Flow Incorporating Load Curtailment Schedule (부하차단량을 고려한 상정사고 절약 최적조류계산 알고리즘 개발)

  • Chung, Koo-Hyung;Kang, Dong-Joo;Kim, Bal-Ho
    • Proceedings of the KIEE Conference
    • /
    • 2005.07a
    • /
    • pp.801-803
    • /
    • 2005
  • Fundamentally, success of the competitive electricity market is dependent on efficient market design. However, since electricity incorporates various physical constraints as other commodities, the resource assignment (i.e., dispatch scheduling) is also one of requisites for the successful operation of electricity market. Therefore, efficient dispatch scheduling is an important issue to succeed in the deregulated electricity market and the efficiency of this electricity market may be considerably increased by systematic studies on dispatch scheduling algorithm and corresponding constraints, especially system security. Moreover, contrary to traditional vertically-integrated electric power industry condition, since various decision-makings in deregulated electricity market are directly connected with market participants' benefits, only rational dispatch scheduling algorithm can convince these participants. Therefore, it can provide a basis of grievance prevention. In this paper, we propose an algorithm for security constrained dispatch scheduling with respect to load curtailment. Proposed algorithm decomposes the dispatch problem into a master problem corresponding to basecase optimal power flow (OPF) and several subproblems corresponding a series of contingencies using two-stage optimization technique.

  • PDF

Energy Saving Potentials of Radiant Floor Heating Systems Based on Control Strategies (바닥 복사 난방 시스템의 제어전략에 따른 에너지 사용량 분석)

  • Lee, Joon-Woo;Park, Cheol-Soo
    • 한국태양에너지학회:학술대회논문집
    • /
    • 2009.04a
    • /
    • pp.109-114
    • /
    • 2009
  • The dominant heating system used in Korean residential apartment buildings is a hydronic radiant floor heating system, known as the Ondol system. The most common control strategy applied to this traditional hydronic radiant system is a simple on-off control that intermittently supplies "hot water of a fixed temperature" at a "constant flow rate" to each room. However, the current problems with the aforementioned control are as follows: (1) since the simple on-off control is usually based on a one point measured temperature (a signal from a thermostat installed in a living room) in each dwelling unit, heating energy use for unoccupied rooms as well as a difference in temperatures between spaces (master bedroom, living room, bedroom1, bedroom2) can occur occasionally. (2) the most widely used residential water splitter has static valves, and is thus not able to change the flow rate to each room depending on the space heating load. In other words, the ratio of flow rates to rooms is fixed after construction, resulting in over- or under-heating and an improper use of energy. The aim of this paper is therefore to investigate the differences in the system's performance between control strategies in terms of the flow rate control and sensor location. It is shown that energy savings of control strategies are strongly influenced by occupant schedule.

  • PDF

Adaptation Experience of Sleep in New Nurses (신규간호사의 수면 적응 경험)

  • Park, Hyoung-Sook;Ha, Jae-Hyun
    • Journal of Korean Academy of Fundamentals of Nursing
    • /
    • v.23 no.1
    • /
    • pp.21-31
    • /
    • 2016
  • Purpose: This study is a qualitative research to identify new nurses' adaptation experience to sleep changes. Method: Grounded theory methodology was utilized. Participants were 10 new nurses from one university hospital. The information was collected and analyzed using the grounded theory of Corbin and Strauss'(2008). Results: Through constant comparative analysis, central phenomenon was identified as 'Shaky daily life due to the sleep change'. A core category emerged as 'In the shaky daily life, go grab my position', Causal conditions were 'Heaviness in shift work', 'Not released after getting off work', and 'Body and mind are exhausted'. Context were 'An environment that does not tolerate mistakes' and 'Clogged breathing due to worries'. Intervening factors were 'Support of colleagues', 'Recovery volition in restoration of altered relationships due to sleep'. Action/Interaction Strategies were 'To strive for a good sleep', 'Require a reasonable duty schedule' and 'Find a breakthrough'. Consequences were 'Become the master of shaky daily life' and 'Accepting the life of a nurse'. Conclusion: New nurses experience sleep patterns changes from the hospital shift system. but throughout the process of adaptation, came to accept sleep disorder as part of the life of a nurse.

Auto-Bending Manufacturing System for Boiler Tubes (보일러 튜브 자동벤딩 생산시스템 개발)

  • Lee, Hyun-Soo;Kang, Moon-Hyun;Park, Jun-Kon;Hur, Kwan;Sung, Joon-Suk;Heo, Wang-Soon
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 1997.04a
    • /
    • pp.450-454
    • /
    • 1997
  • This system is the automatic boiler tube bending equipment which has four heads for bending the tube and the carriage for moving the tube. The system consists of two frames for transporting each moving parts, high-frequency heating equipment for heating the tube in hot bending, control panel for inputting the job data operating, remote control unit for concetration and distribution of input/output, and the monitoring system which can establish unmanned operationby receiving the bending job data via LAN form a design teamwhich produces the job data and schedule based on master production plan and diagnoses bending data change, input, whole system status, and system malfunctions. By employing this system, 30% of production improvement was achieved was achieved comparing to the existing bending system.

  • PDF

An Approach to Optimal Dispatch Scheduling Incorporating Transmission Security Constraints

  • Chung, Koo-Hyung;Kang, Dong-Joo;Kim, Balho H.;Kim, Tai-Hoon;Oh, Tae-Kyoo
    • Journal of Electrical Engineering and Technology
    • /
    • v.3 no.2
    • /
    • pp.199-206
    • /
    • 2008
  • The introduction of competition in electricity markets emphasizes the importance of sufficient transmission capacities to guarantee effective power transactions. Therefore, for the economic and stable electric power system operation, transmission security constrains should be incorporated into the dispatch scheduling problem. With the intent to solve this problem, we decompose a dispatch scheduling problem into a master problem(MP) and several subproblems(SPs) using Benders decomposition. The MP solves a general optimal power flow(OPF) problem while the SPs inspect the feasibility of OPF solution under respective transmission line contingencies. If a dispatch scheduling solution given by the MP violates transmission security constraints, then additional constraints corresponding to the violations are imposed to the MP. Through this iterative process between the MP and SPs, we derive an optimal dispatch schedule incorporating the post-contingency corrective rescheduling. In addition, we consider interruptible loads as active control variables since the interruptible loads can participate as generators in competitive electricity markets. Numerical examples demonstrate the efficiency of the proposed algorithm.