• Title/Summary/Keyword: Mapping Chart

Search Result 29, Processing Time 0.019 seconds

Hybrid ARQ With Symbol Mapping Diversity and Turbo Demodulation based on LDPC Codes (심볼 맵핑 다이버시티와 터보 복조를 사용하는 LDPC 부호 기반의 Hybrid ARQ 기법)

  • Ahn, Seok-Ki;Yang, Kyeong-Cheol
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.34 no.9C
    • /
    • pp.841-847
    • /
    • 2009
  • In this paper we propose a high-performance Hybrid ARQ scheme employing Chase combining based on LDPC (Low-Density Parity-Check) codes. The proposed scheme uses symbol mapping diversity and turbo demodulation to improve decoding performance. We analyze the performance of the proposed scheme by EXIT (EXtrinsic Information Transfer) chart and compare its performance with several symbol mappings.

Hardware/Software Partitioning Methodology for Reconfigurable System (재구성형 시스템을 위한 하드웨어/소프트웨어 분할 기법)

  • Kim, Jun-Yong;Ahn, Seong-Yong;Lee, Jeong-A.
    • The KIPS Transactions:PartA
    • /
    • v.11A no.5
    • /
    • pp.303-312
    • /
    • 2004
  • In this paper, we propose a methodology solving the problem of the hardware-software partitioning in reconfigurable systems using a Y-chart design space exploration and implement a simulator according to the methodology. The methodology generates a mapping set between tasks and hardware elements using the hardware element model and the application model. We evaluate the throughput by simulating cases in each mapping set. With the throughput evaluation result, we can select the mapping case with the highest throughput. We also propose an heuristic improving the simulation time by reducing the mapping set on the basis of the relationship between workload and parallelism. Simulation results show that we can reduce the size of mapping set which poses difficulties on hardware-software partitioning by up to 80%.

Design and Operation of Value Stream Mapping (VSM 설계와 운영방안)

  • Choi, Sung-Woon;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.6
    • /
    • pp.149-157
    • /
    • 2006
  • This paper suggests the design and operation of value stream mapping(VSM) applied to project management, such as R&D, IT Investment. First this study represents design methodology of VSM process using SIPOC(Supplier, Input, Process, Output, Costumer). Second, this paper considers the identification and improvement plan about non-added value time for VSM using FPC(Flow Process Chart) and PERT/CPM. Last, this paper proposes VSM scheduling method using PERT/CPM and CCPM(Critical Chain Project Management)

A Low-Complexity CLSIC-LMMSE-Based Multi-User Detection Algorithm for Coded MIMO Systems with High Order Modulation

  • Xu, Jin;Zhang, Kai
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • v.11 no.4
    • /
    • pp.1954-1971
    • /
    • 2017
  • In this work, first, a multiuser detection (MUD) algorithm based on component-level soft interference cancellation and linear minimum mean square error (CLSIC-LMMSE) is proposed, which can enhance the bit error ratio (BER) performance of the traditional SIC-LMMSE-based MUD by mitigating error propagation. Second, for non-binary low density parity check (NB-LDPC) coded high-order modulation systems, when the proposed algorithm is integrated with partial mapping, the receiver with iterative detection and decoding (IDD) achieves not only better BER performance but also significantly computational complexity reduction over the traditional SIC-LMMSE-based IDD scheme. Extrinsic information transfer chart (EXIT) analysis and numerical simulations are both used to support the conclusions.

Applications of Product Process Analysis For Improving the Construction Process of Structural Steel

  • Lee Seung-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.5 s.21
    • /
    • pp.101-108
    • /
    • 2004
  • A construction process consists of value adding activities and non-value adding activities, necessary or unnecessary. If construction personnel can eliminate inefficient and/or unnecessary activities within the process, they may have a great opportunity to improve their construction process. The Product Process Analysis (PPA) technique, which was developed in the manufacturing industry, can be applied for identifying wastes in the construction process and ultimately improving the process itself. It provides useful tools, such as a process chart worksheet and flow diagram, for mapping the flow of construction activities with predetermined standardized symbols. These tools make people understand the flow of activities more easily, identify value adding/non-value adding activities within the process, and areas where the process can be improved. The example applications of PPA are demonstrated in the paper through the case studies implemented on the construction process of structural steel. The results of case studies indicate that PPA technique was effective at identifying and removing wastes in the steel construction process. It is also found that PPA technique is more effective for improving highly repetitive construction processes.

Review on the Point Location and Locating Method of GB18 (승령(GB18) 혈위와 취혈 방법에 대한 고찰)

  • Koo, Sungtae
    • Korean Journal of Acupuncture
    • /
    • v.35 no.4
    • /
    • pp.203-209
    • /
    • 2018
  • Objectives : The GB18 belongs to one of the 92 controversial points in the development of WHO standard of acupuncture point location. The number of Chon measurement of GB18 is described differently in the A-B Classic of Acupuncture and Moxibustion (ChimGuGakEulKyung; AB Classic) and the Complete Compendium of Acupuncture and Moxibustion(ChimGuDaeSeong; Complete Compendium). The aim of the study is to review the point location of GB18 and compare the relation of the location of BL7. In addition, I would like to propose new locating method of GB18. Methods : In order to review I examined the expressions of the location of GB18 and the mapping location on the acupuncture chart in the landmark classic acupuncture literatures. Results : In the most literatures, the location of GB18 was described by the distance from the GB17. The distance was 1.5 chon with one exception of 1 chon. The intervals from GB15 to GB18 was 1 chon or 1.5 chon. Although the distance from the anterior hairline is the same as 4 chon, mapping points of GB18 and BL7 on the acupuncture chart were different. Conclusions : Consequently, in the AB Classic, meaning of the location is the actual distance of scalp surface. In the Complete Compendium, however, meaning of the location is the hypothetical distance in the imaginary scalp surface. Therefore, it is safe to find the GB18 on the same level with GV20 on the connecting line of bilateral auricular apexes. The relation of GB18 and BL7 should be reconsidered.

Improved characterization method for mobile phone camera and LCD display (모바일 폰 카메라와 LCD의 향상된 특성화 방법)

  • Jang, In-Su;Son, Chang-Hwan;Lee, Cheol-Hee;Song, Kun-Woen;Ha, Yeong-Ho
    • Journal of the Institute of Electronics Engineers of Korea SP
    • /
    • v.45 no.2
    • /
    • pp.65-73
    • /
    • 2008
  • The characterization process for the accurate color reproduction in mobile phone with camera and LCD is popular. The camera and LCD characterization, gamut mapping process is necessary to map the camera's input color stimulus, CIEXYZ value, into the LCD's output color stimulus. Each characterization is the process estimating the relation between input and output signals. In case of LCD, because of output device, the output color stimulus for the arbitrary input signal can be measured by spectro-radiometer However, in the camera, as the input device, the characterization is an inaccurate and needs the manual works in the process obtaining the output signal because the input signal can not be generated. Moreover, after gamut mapping process, the noise is increased because the optimized gamma tone curve of camera for the noise is distorted by the characterization. Thus, this paper proposed the system of obtaining the output signal of camera and the method of gamma correction for the noise. The camera's output signal is obtained by RGB values of patches from captured the color chart image. However, besides the illumination, the error for the location of the chart in the viewfinder is generated when many camera modules are captured the chart. The method of correcting the position to correct the error from manual works. The position of camera is estimated by captured image. This process and moving of camera is accomplished repeatedly, and the optimized position can be obtained. Moreover, the lightness curve of camera output is corrected partly to reduce the noise from the characterization process.

New approach on prediction of fault zone ahead of tunnel face by using $x-R_s$ control chart for RMR parameters (RMR 변수의 $x-R_s$ 관리도 분석을 통한 굴착면 전방 단층대 예측 기법)

  • Yim, Sung-Bin;Kim, Kwang-Yeom;Kim, Chang-Yong;Seo, Yong-Seok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.12 no.6
    • /
    • pp.463-473
    • /
    • 2010
  • A new approach for prediction of a fault zone ahead of tunnel face by using statistical control charts is suggested and applied to the construction site. $x-R_s$ control charts of RMR parameters were investigated as approaching and passing through fault zone. The abnormal signal from the control charts was observed and analyzed based on statistical criteria. Fault zones in the application area were predicted in advance using this method and it was verified by comparing with observation data like horizontal boring and face mapping.

Development of River Quality Management Information System Using Web-GIS of Nonsan-si(I) (Web-GIS를 이용한 논산시 하천수질 관리 정보 지원시스템 구현(I))

  • 박기학;오승교;박성규
    • Journal of environmental and Sanitary engineering
    • /
    • v.18 no.4
    • /
    • pp.15-23
    • /
    • 2003
  • The purpose of this study is to construct e-Nonsan, a user friendly river quality management information system for Nonsan-si basin using GIS (geographical information system) technology. GIS was ideally suited featuring a geographical characteristics(e.g., industries, cattle sheds) and very effectively used in mapping and symbolization for the distribution of the spatial/periodic status(e.g., pie or column chart) of the point/non-point pollutant source loads which can be effectively applied to a information system on the web-site. And a user interface, GUI(graphic user interface) was designed very diversely and simply enabled the and non environmental experts connect with the system and obtain a useful information of river quality. e-Nonsan, a visual mapping system for river quality was developed by reframing the monitoring data as graphic symbols and it was ideally suited to exploring area-wide river quality at a user-friendly manner due to extensibility and scalability along the various survey points. Eventually the final step of this study was to construct e-Nonsan based on Web-GIS could be assessed anywhere if internet service is available and offer a very useful information services of the river quality to the publics.

Real-Time Forecast of Rainfall Impact on Urban Inundation (강우자료와 연계한 도시 침수지역의 사전 영향예보)

  • KEUM, Ho-Jun;KIM, Hyun-Il;HAN, Kun-Yeun
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.21 no.3
    • /
    • pp.76-92
    • /
    • 2018
  • This study aimed to establish database of rainfall inundation area by rainfall scenarios and conduct a real time prediction for urban flood mitigation. the data leaded model was developed for the mapping of inundated area with rainfall forecast data provided by korea meteorological agency. for the construction of data leaded model, 1d-2d modeling was applied to Gangnam area, where suffered from severe flooding event including september, 2010. 1d-2d analysis result agree with observed in term of flood depth. flood area and flood occurring report which maintained by NDMS(national disaster management system). The fitness ratio of the NDMS reporting point and 2D flood analysis results was revealed to be 69.5%. Flood forecast chart was created using pre-flooding database. It was analyzed to have 70.3% of fitness in case of flood forecast chart of 70mm, and 72.0% in case of 80mm flood forecast chart. Using the constructed pre-flood area database, it is possible to present flood forecast chart information with rainfall forecast, and it can be used to secure the leading time during flood predictions and warning.