• Title/Summary/Keyword: Management priority

Search Result 1,923, Processing Time 0.03 seconds

Suggestions on Efficient Cost Management for Public Construction Projects - Focused on Total Project Cost Management System- (공공건설사업 사업비 관리의 문제점 및 개선방안 - 총사업비관리제도를 중심으로-)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.12-21
    • /
    • 2013
  • Total Project Cost Management System(TPCMS) was introduced with the purpose of increasing the efficiency of cost control for public construction project in 1994. In this paper, general perception of participants of the public construction project on the TPCMS was examined, and the problems in implementing the TPCMS was figured out through expert interviews and survey. Then better ways to implement the system were drawn based on the problems. To effectively manage the cost of public construction project, basically project cost should be estimated accurately in planning stage and managed based on it to have a project complete within the budget. In addition, the cost need to be managed in more systematic ways in terms of data collection and analysis, and the autonomy in managing the project cost given to the project owner needs to be expanded. Most of all, proper budget should be provided to prevent a project from delay through setting the priority of projects and proper budget allocation based on the priority.

The Analysis of Order Priority of Management Performance Factors in Medical Organization (AHP기법을 이용한 의료기관 성과요인의 우선순위 분석)

  • Chun, Je-Ran
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.11 no.10
    • /
    • pp.3733-3739
    • /
    • 2010
  • This paper suggests the measurement method of evaluation of management performance factors in health organization using AHP and Factor Analysis technique. To achieve this goal, this study applies AHP method to different size of hospitals. AHP method is deployed in three steps. At first step, the major factors, which indicate the management performance in health organizations, will be formed through factor analysis. At second step, the pairwise comparison between two factors will be performed to calculate the weights of each variables. At the last step, the order of priority of all factors will be determined. This order list will be used in measurement of the management performance in health organization. The results of this paper show that the financial factors take the top position, and followed by customer related factors, process factors and education & growth factors. This result could be the milestone for the measurement of management performance of medical organization in Korea.

Analysis of Relative Priority of Local Civil Servant's Personnel Innovation Policy (지방공무원 인사혁신정책의 상대적 우선순위분석)

  • Lee, Taek Ku
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.3
    • /
    • pp.550-556
    • /
    • 2018
  • This study conducted AHP analysis to find out the directional of human resource management through policy priorities for personnel innovation of local public officials. The results of the study were derived using the AHP analysis methodology. The results of the study are summarized as follows. First, the interchange of personnel system was the most important measure among the measurement areas of interchange of personnel system, education training system, recruitment management system and appointment management system. Second, from the point of view of evaluation item, it is as follows. In the personnel interchange system, it was found that the conversion of personnel management based on job performance and performance was important. In the position management system, it is important to appoint and expand professional positions. In the recruitment management system, the introduction of personality and aptitude tests used in the private sector is important. Development of customized curriculum programs is important in the education and training system.

The Establishment of Ecological Landscape Conservation and Restoration Sections for Urban Stream - Case studies of Jeonjucheon and Samcheon in Jeonju-si - (도시하천의 생태경관 보전 및 복원구역 설정에 관한 연구 - 전주시 전주천과 삼천을 중심으로 -)

  • Lim, Hyun-Jeong;Lee, Myung-Woo;Jeong, Moon-Sun
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.22 no.2
    • /
    • pp.73-92
    • /
    • 2019
  • The purpose of this study is to establish the conservation and restoration areas for sustainable stream management by reflecting the ecological health, cultural characteristics, and the citizens' needs for stream uses. Therefore, we extended spatial ranges of stream evaluation to riparian areas in addition to stream sections. The evaluation indexes are stream naturalness, availability, biota assessment, and riparian characteristics such as land uses and legally protected areas. The grading system was unified with five classes. The spatial evaluation units for stream section are classified as right and left for laterally and 500m for longitudinally. For riparian areas, 30m and 100m of distance from the edge of stream are applied as spatial evaluation units. The six types of stream sections for management are conservation sections(priority/general) and restoration sections(priority/general) for ecological landscape and core and general sections for cultural landscape. The established system for evaluation and designating areas for stream management was applied to Jeonjucheon and Samcheon in Jeonju-si, and the conservation and restoration areas were designated reflecting the characteristics of urban and non-urban areas and left and right of stream sections. The results of this study will provide detailed guidelines for designating stream sections and practical management strategies for sustainable urban stream management.

A Study on the Priority Analysis of Work Delay Factors in Steal-frame Work using FMEA (FMEA를 활용한 철골공사 작업지연요인의 중요도에 관한 연구)

  • Lee, Hyun-Chul;Lee, Jae-Hong;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.91-101
    • /
    • 2009
  • The factors of uncertainty such as work delay could cause many problems, for example, increase of construction cost and terms of work, and the deterioration of quality. Because of these, the uncertainty risk is regarded as an important management factor to obtain the success of construction project. So, the systematic management plan about the uncertainty factors is needed because it plays an important role in the completion of entire project. And also analysis of some factors which can cause the work delay can be one way of improving construction project's certainty and making it competitive. In this reason, we have to make an effort to set a priority based on analysis of quantitatively numerical value about work delay factors to manage them effectively. Thus, this study aims to suggest the basic data for the effective management and prevention of work delay in steel-frame work which is progressive actively now, along with increasing of demand of high-rise buildings by analyzing each reasons of work delay factors and also by suggesting important management factors that are coded according to each construction work using FMEA method which could give a data about the importance of work delay factors through quantitatively numerical value.

A Studyon Relationship among the Key Dimensions of Quality Management (품질경영 핵심영역간의 상관관계연구)

  • 최현경;박재홍
    • Journal of Korean Society for Quality Management
    • /
    • v.26 no.1
    • /
    • pp.11-26
    • /
    • 1998
  • A key aspect of theoretical and practical development of quality management is articulation of the distinction between quality management practices(input) and quality performance (output), which to date has been blurred under the broad heading of 'quality'. Recent literature primarily addressed measurement of quality performance but very little empirical research focuses specifically on quality management practices. In order to understand quality cause and effect, it is necessary to specify and measure quality management practices (cause) as well as quality performance (effect). This paper identifies and substantiates the key areas of quality management that must be implemented to achieve effective quality management, then analyzes relationships among those areas. In doing so, it establishes the basis for subsequent research by producing a profile of organization-wide quality manage-ment and provides the direction and priority of quality management practices for practitioners.

  • PDF

Safety Management System Prototype Based on BIM with RTLS

  • Kwang-pyo Lee;Hyunsoo Lee;Moonseo Park ;Hyunsoo Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.890-896
    • /
    • 2009
  • In past projects, the main goal has been to enhance efficiency by reducing cost and time. However, considering the current condition of safety management in many construction companies, it can be confirmed that safety management has not been a top priority for a long time. Current safety management, which is based on safety standards and rules, is very ineffective and only emphasizes management after an incident. As well, although fewer accidents occur compared to the past, because construction projects are increasingly large in scale and complex, these accidents tend to be more serious and involve greater monetary loss. Furthermore, as the severity of these accidents increases, so does the possibility of fatalities. Therefore, improving safety management is essential. This study proposes an effective program for safety management, focusing on the processes to connect studies and systems, and the basic techniques required for program development. To realize this program, technical tools are suggested, including systems such as BIM (Building Information Modeling); additionally, the coordination of other systems such as an RTLS, a server, and an alarm system is proposed.

  • PDF

A Study on the Investment Priority Item of Educational Facilities using AHP Method;Focused on Elementary ${\cdot}$ Middle ${\cdot}$ High school of Chungcheong-Namdo (AHP기법을 이용한 교육시설물 투자 우선순위 Item 도출에 관한 연구;충청남도 초 ${\cdot}$${\cdot}$ 고등학교를 중심으로)

  • Kim, Sung-Kyum;Lee, Eun-Dong;Cho, Chang-Yeon;Kim, Jae-On;Son, Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.98-102
    • /
    • 2006
  • This study was conducted to derive a priority of investment in educational facilities by collecting and analyzing investment records from elementary, middle, and high schools in Chung Nam area. In addition, the AHP survey and analysis were performed in order to draw the priority item in the educational facility improvement. Students, parents, teachers and a educational facility managers from those schools provided their opinions and data for the AHP study. As a result of the study, the actual investment-cost and a lack of educational facilities were found. A priority item based on the above study was derived which can be used to increase user's satisfaction in the educational facilities. The result of this study can be used as a basis to improve the environment of the educational facilities.

  • PDF

A Study on the Priority of Sustainability Areas and Indicators of Domestic Smart Ports (국내 스마트 항만의 지속가능성 영역과 지표의 우선순위에 관한 연구)

  • Lee, Jae-Hoon;Chang, Myung-Hee
    • Journal of Korea Port Economic Association
    • /
    • v.38 no.4
    • /
    • pp.65-85
    • /
    • 2022
  • In this study, in order to derive the priority of indicators and sustainability areas of smart ports, which means ports in the digital era, previous studies and ESG, which have recently been indispensably introduced in all industries worldwide, were studied together. A hierarchical structure was established with upper evaluation items and 20 lower evaluation items in four areas (operational, environmental, social, and governance), and a relative evaluation method of weighting items among the AHP techniques was applied. The pairwise comparison questionnaire consisted of a 9-point scale proposed by Satty (1980). A survey was conducted targeting working-level workers who perform sustainability or ESG(Environmental, Social, Governance)-related work at four representative port authorities in Korea (Busan, Incheon, Ulsan, Yeosu Gwangyang). In order to increase the accuracy of the analysis results, AHP analysis was conducted on 17 questionnaires with a consistency ratio of 0.1 or less. As a result of the analysis, it was confirmed that among the four areas representing the sustainability of domestic smart ports, the operation area had the highest priority, followed by the environment area. In addition, looking at the overall priorities for the 20 detailed indicators, indicators such as operational efficiency, operational planning, energy management, and pollution measurement and management system were found to have high priority. On the other hand, it was confirmed that the social and the governance areas had relatively low importance compared to other areas.

Priority-Based Resource Allocation Algorithm for Virtual Network (가상 네트워크를 위한 우선순위 기반 자원 할당 알고리즘)

  • Kim, Hak-Suh;Lee, Sang-Ho
    • Journal of Digital Convergence
    • /
    • v.14 no.10
    • /
    • pp.303-310
    • /
    • 2016
  • Due to the ossification of the Internet, it is difficult to accommodate variety services. One of the efficient solution to this problem is network virtualization. It allows multiple parallel virtual networks to run on the shared physical infrastructure. It needs new resource allocation mechanism to share efficient physical resources. In this paper, we present efficient bandwidth allocation algorithm for virtual network request with high service priority. Our proposed algorithm can withdraw allocated bandwidth from low-level priority virtual network and maintain low-level virtual network service. We evaluated the performance of our proposed algorithm using simulation and found the improvement of approximately 8% acceptance rate.