• Title/Summary/Keyword: Management priority

Search Result 1,916, Processing Time 0.025 seconds

Water Quality Analysis in Nakdong River Tributaries for the Determination of Priority Management Areas (관리 우선순위 선정을 위한 낙동강 지류·지천 지점의 수질 오염 특성 분석)

  • Im, Tae Hyo;Na, Seungmin;Shin, Sangmin;Son, Younggyu
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.38 no.10
    • /
    • pp.558-565
    • /
    • 2016
  • Water quality data including flow rates and BOD/COD/T-N/T-P/SS/TOC concentrations in Nakdong river tributaries were analyzed to determine priority management areas using 699 data sets from 195 locations in 2015. It was pointed out that the coefficients of variation, the ratio of the standard deviation to the mean, for the concentrations and loading rates of BOD, T-P, and TOC in each monitoring location were so large that average values of water quality monitoring data might be not appropriate to determine the priority management areas among all 195 monitoring stations in Nakdoing river. Therefore we suggested two evaluation methods using each water quality data independently. In the first method the excess numbers of the BOD, T-P, and TOC concentrations comparing to the water quality standards in the medium-sized management areas in Nakdong river was evaluated for each monitoring station. In the second method the percentile ranks of the loading rates of the BOD, T-P, and TOC were obtained for each monitoring data. The two groups of the priority management areas determined by each method were compared and the water quality characteristics in Nakdoing river were investigated.

Improving a Curriculum of Global Environmental Management of a University based on Environmental Management Experts Competency (환경경영전문가 육성을 위한 역량기반 교육과정 개선 연구: 서울대학교의 사례를 중심으로)

  • Lee, Chan;Chang, Youn-Yeo;Moon, Ye-Won;Lee, Jae-Eun
    • Hwankyungkyoyuk
    • /
    • v.25 no.2
    • /
    • pp.210-223
    • /
    • 2012
  • This study is aimed to identify environmental management expert's competencies, to analyze educational need, and to improve curriculum of Global Environmental Management major of 'Seoul National University'. Environmental experts are divided into three groups through 'the right people' of the Global Environmental Management major: environmental management businessman, environmental management policy maker, environmental management international cooperator. This study selected three high-performers of each categories through recommendation and made them build a competency model for what the high-performer's behavioral characteristics is. And the educational needs analysis was carried out by practitioners in environmental management field. This study ordered the priority of educational needed competencies by method of Borich's proposal. The high priority of competencies that should be educated preferentially are as follows: responding to environmental policy, analyzing domestic & foreign environmental policy and design international environmental cooperation project. To be secure the consistency with the field need and university curriculum, it is needed to find various interventions in environmental management education and to improve curricula focused on specific competencies.

  • PDF

Risk Identification and Priority method for Overseas LNG Plant Projects - Focusing on Design Phase - (해외 LNG 플랜트 리스크요인 도출 및 우선순위 평가 - 설계단계를 중심으로 -)

  • Jang, Woo-Sik;Hong, Hwa-Uk;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.5
    • /
    • pp.146-154
    • /
    • 2011
  • Korean contractors have been maintained sustainable growth since entering into overseas construction market for the first time in 1960' s. In 2010, Korean contractors ordered 761 billion (USD) from overseas markets. Especially, billion (USD) were earned by Korean contractors in overseas plant construction market which account for more than 80% of the total amount by Korean contractors. Nevertheless, many Korean contractors are suffering from lack of technological competitiveness and construction management skills in the design phase compared with global leading contractors. These conditions have directly effect on the success of projects in terms of cost, duration, and quality. So, this study focused on identifying the risk factors and developing risk priority method for the design phase of LNG plant projects whose market is expanding. Research procedures were conducted by the following three steps. First, total 57 risk factors were identified in design phase through extensive literature reviews and experts survey. Second, the authors developed risk priority method which are more suitable for design phase of LNG plant projects by using three criteria, Probability(P), Impact(I), and Coordination Index(CI). Finally, the suitability of risk priority method and practical applicability were verified through expert survey and interview. Consequently, if korean contractors use the suggested risk factors and priority method based on their own know-how and experiences, then more reasonable and rational risk management will be conducted in the design phase of LNG plant projects.

Managerial Priority Derivation for Pollutants in Drinking Water (식수품질 저해요인 중 관리 우선순위 도출에 관한 연구)

  • Oh, Hee-Kyun;Lee, Hee-Chan
    • Journal of Korean Society on Water Environment
    • /
    • v.32 no.1
    • /
    • pp.80-88
    • /
    • 2016
  • The main purpose of this study was to derive managerial priority for pollutants in drinking water using the Delphi technique and analytic hierarchy process (AHP) method. We collected fundamental existing items based on a literature review for water pollutants, and deduced a total of 36 sub-items from nine core sectors, as follows: organic matter; inorganic substances; pathogenic organisms; chemicals; heavy metals; radioactive substances; sediment deposits; heat; and oil, and then conducted the first round of an expert study to ensure that objective indicators properly evaluate major issues for management of for drinking water quality. In the following round, the necessity and importance assessments of adjusted items were implemented using a content validity ratio index. Finally, items modified by Delphi surveys were applied to AHP. We computed weighted values by pair-wise comparison of sub-items and each of five sectors modified by the second round. According to the results of AHP, the managerial priority for pollutants in drinking water was as follows; while heavy metal placed first in importance, pathogenic organisms came second, followed by inorganic substances, organic matter and chemical substances from the sector perspective.

The Priority PC Monitoring System Using Regression Algorithm (회귀알고리즘을 이용한 우선순위 PC모니터링 시스템)

  • Lee, Young-Nam;Kim, Sin-Ryeong;Kim, Young-Gon
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.12 no.4
    • /
    • pp.173-179
    • /
    • 2012
  • Recently, the requirements of large-dynamic management systems are increasing in multi-PC convergence environment because such system are out. In this research, it has been studied that the regression algorithm was applied instantly for abnormal state and the priority threshold process module was implemented. The system was optimized and become efficiently through the software design and implementation for multi-PC management. As a result, it has been possible for least person and system to manage a lot of requirements.

A Study of FMEA for Selecting Priority Safety Unit;focusing on the cases of steel frame work (중점 안전관리 항목 도출을 위한 FMEA활용 방안;철골 공사 사례를 중심으로)

  • Park, Chan-Jong;Song, Ji-Won;Ryu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.502-506
    • /
    • 2006
  • For advanced construction safety, there frequently are repeated accident. Most of them are serious disasters which are continually concerned. But technical method of Safety organizations for construction project is still short, simple and unscientific. We suggest FMEA(Failure Mode and Effect Analysis) process on the safety management. The purpose of study is an establishment of safety system focused on scientific method by selecting priority unit and by figuring importance.

  • PDF

An Improved MList for Efficient Event List Management in Discrete Event Simulation (이산사건 시뮬레이션에서의 효율적인 이벤트 리스트 관리를 위한 MList의 개선 방안)

  • Kim, Seong-Gon;Yim, Dong-Soon
    • Journal of the Korea Society for Simulation
    • /
    • v.18 no.4
    • /
    • pp.29-37
    • /
    • 2009
  • This paper deals with the priority queues exploited for the management of future event list in discrete event simulation. Among several implementations of priority queues, MList which consists of 3 tiers has been known to reveal the good performance. To improve the performance of MList, Dynamic-Shift MList (DSMList) is proposed in this paper. Whenever the number of events in tier 3 exceeds a critical number, DSMList creates new calendar queue in tier 2, then moves events from Tier 3 to the calendar queue. Instead of one calendar queue, therefore, a number of calendar queues are dynamically created in tier 2. Throughout experiments for the performance evaluation of DSMList, it shows that at least 20% improvement is obtained compared with MList.

Analysis of Relative Importance and Priority of Civil Servant's Education Training Policy: Using Analytic Hierarchy Process (AHP) Method (공무원교육훈련정책의 상대적 중요도와 우선순위 분석: 계층의사결정방법(AHP)을 활용하여)

  • Park, Jong-Deuk
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.4
    • /
    • pp.263-272
    • /
    • 2012
  • In an attempt to analyze the policy priority on civil servant's education training policy as human resource management in this study, a positive analysis with the experts using AHP method was conducted. Summarizing the outcome of the study; First, in terms of relative priority of the evaluation elements by sector, the education training operation system, among education training program, education training evaluation, and education infrastructure, was analyzed as the most important element. Second, as a result of analyzing the priority of detail sectors of civil servant's education training, Action learning education program was proved to be the top priority project education training program aspect and education training operation system was also evaluated as the top priority project in education training agency budget expansion aspect, education training and personnel administration link was evaluated as the top priority project education training evaluation, and trainer secure was proved to be the top priority education infrastructure. Such outcome of the project is expected to make commitment for evaluating the civil servant's education training policy.

Strategic Allocation of the Limited Same Resource by Program Management Office Considering Financial Values (재무 가치를 고려한 PMO의 전략적 동일 한정 자원 배분)

  • Hwang, Jin-Ha;Kim, Ju-Han;Hwang, Jee-Yeon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.35 no.3
    • /
    • pp.24-31
    • /
    • 2012
  • Priority rules or sequencing heuristics conventionally used to determine resource allocation is to maximize the earned value on time and cost. This study provides a effective strategy-oriented approach for the program resource management problem with limited same resource, which systematically connects individual project objectives to the overall organizational goal, by introducing financial values as well as priority rules in a broader context. It deals with the resource allocation problem as the decision making problem in the strategic management paradigm to meet business objective and solves it using the analytic hierarchy process, and explains the method of application and usefulness through some simulation cases.

SCM Strategy and Best Practices Implementation in SMEs (미국 중소기업의 SCM전략과 Best Practice 실행 현황조사 연구)

  • Kim Dae-Soo
    • Korean Management Science Review
    • /
    • v.23 no.1
    • /
    • pp.135-152
    • /
    • 2006
  • Over the last decade, the field of supply chain management (SCM) and e-business has received an enormous amount of attention from practitioners and academicians. However, little has been known about how and to what extent small- to medium-sized enterprises (SMEs) are implementing SCM initiatives and e-business practices. This paper proposes a comprehensive research model and presents the survey results of these practices of SMEs located in Wisconsin and illinois, U.S., In terms of competitive strategy and priority, value chain activity priority, supply chain and e-business integration focus, SCM best practices implementation focus and challenges, and business performance. The analysis reveals several valuable insights into how SMEs should run their businesses in today's volatile, rapidly changing customer economy.