• Title/Summary/Keyword: Management alternatives

Search Result 1,171, Processing Time 0.026 seconds

Prioritization of Alternatives by Quantifying the Effect on Water Quanity and Quality using PCSWMM (PCSWMM 모형의 수량 및 수질 측면의 효과분석 결과를 이용한 대안의 우선순위 제시)

  • Hong, Won-Pyo;Chung, Eun-Sung;Kim, SangUg;Park, Kyung-Shin;Lee, Kil Seong
    • Journal of Korean Society on Water Environment
    • /
    • v.25 no.1
    • /
    • pp.37-47
    • /
    • 2009
  • This study analyzes the effect of alternatives and estimates alternatives evaluation index (AEI) using PCSWMM and weighted summation method. PCSWMM considering combined sewer overflows (CSOs) in the Mokgamcheon watershed was used and effectiveness analysis of alternative was conducted to develop not only flowrate but also the pollutant of BOD and SS. Indicators of AEI are selected using sustainability evaluation concept, driver-pressure-state-impact-response (DPSIR) framework and calculated by weighted summation method. After estimating AEI, alternatives was classified into three groups G (Good), A (Acceptable) and P (Poor) grade. As a results, it is analyzed that alternatives applied to Oryucheon were G grade and those of Yeokgokcheon were P grade and the remainings were 'A' grade. This result will be effective to the integrated watershed management for sustainablility.

Wordings of the Kano Model's Questionnaire (Kano 모델의 설문 워딩에 관한 연구)

  • Song, HaeGeun;Park, Young T.
    • Journal of Korean Society for Quality Management
    • /
    • v.40 no.4
    • /
    • pp.453-466
    • /
    • 2012
  • Purpose: The Kano model has been widely accepted as a method for classifying quality attributes for almost three decades since its introduction. However, the wordings of the five alternatives in the Kano's questionnaire has been criticised for unclear and confusable meanings. New wordings of the five alternatives are proposed in this paper. Methods: To evaluate the effectiveness of the proposed wordings, we classify 30 quality attributes of smartphones using the conventional wordings and the proposed wordings respectively. The two classification results are compared with the direct classification results by undergraduate students who learned the Kano model. Results: The classification results using the proposed wordings are much more consistent with the direct classification results than those using the conventional wordings. Conclusion: The proposed wordings are less confusable and easy to understand, and thus it results in more consistent with the direct classification.

Integrated AHP and DEA method for technology evaluation and selection: application to clean technology (기술 평가 및 선정을 위한 AHP와 DEA 통합 활용 방법: 청정기술에의 적용)

  • Yu, Peng;Lee, Jang Hee
    • Knowledge Management Research
    • /
    • v.13 no.3
    • /
    • pp.55-77
    • /
    • 2012
  • Selecting promising technology is becoming more and more difficult due to the increased number and complexity. In this study, we propose hybrid AHP/DEA-AR method and hybrid AHP/DEA-AR-G method to evaluate efficiency of technology alternatives based on ordinal rating data collected through survey to technology experts in a certain field and select efficient technology alternative as promising technology. The proposed method normalizes rating data and uses AHP to derive weights to improve the credibility of analysis, then in order to avoid basic DEA models' problems, use DEA-AR and DEA-AR-G to evaluate efficiency of technology alternatives. In this study, we applied the proposed methods to clean technology and compared with the basic DEA models. According to the result of the comparison, we can find that the both proposed methods are excellent in confirming most efficient technology, and hybrid AHP/DEA-AR method is much easier to use in the process of technology selection.

  • PDF

Decision Making Method based on Function and Performance Matrix Assessment Considering Design Change

  • Oh, Youngsuk;Chun, Jaeyoul;Cho, Jaeho
    • Architectural research
    • /
    • v.17 no.3
    • /
    • pp.83-91
    • /
    • 2015
  • A comprehensive understanding of functions and performances enables a selection of appropriate alternatives to the existing design and can prevent defective design. A performance-based design quality management can ensure successful project completion. This study proposes a new model for design quality management in order to prevent defective design and to minimize design change. The new quality management model defines the requirement about function and performance based on technical characteristic, and assesses suitability for design alternatives. This study attempts to propose a quality matrix assessment method that can compare the alternative design and requirements defined with the new quality management model. This method can judge conformity and suitability of design quality in accordance with the requirements configured.

A Study on the Disaster Management System (재난관리제체(災難管理體制) 에 관한 연구(硏究) -인위재난관리(人爲災難管理)를 중심(中心)으로-)

  • Chong, Chin-Whan
    • Korean Security Journal
    • /
    • no.1
    • /
    • pp.321-350
    • /
    • 1997
  • This thesis is an attempt to find out ways and means needed to improve the disaster management system in Korea(Chap. Ⅰ). For this purpose, I have first reviewed various crisis management systems of foreign countries such as the United States, England and Japan(Chap. Ⅱ), and also reviewed that of our own country(Chap. Ⅲ). All of us knows that our disaster management system has been reestablished through the enactment of the Disaster Management Act of 1995 and the full revision of Natural Harzards Management Act of 1995 after a series of catastrophic man-made disasters since 1993. I took a general survey of the contents and characteristics of the newly made Disaster Management Act(Chap. Ⅳ), and Finally, as a conclusion of this research(Chap. V), I indicated a few disputed points on the Disaster Management Act and suggested several alternatives to improve our crisis management system. The alternatives suggested are as follows (1) Reinforcement of prevention-centered policy and expansion of investment (2) Specialization of the crisis management man-power and securing the rescue equipment (3) Arrangement of the various lessons on crisis and reinforcement of educational training against the disasters (4) Building the cooperative systems between the civil organizations (5) An opinion towards the issues on the unifying the law systems and reorganizaing the new independent institution for the crisis management

  • PDF

A Study of an effective centralization of medical supply system. In Y University Medical Center (Y의료원의 물류 공급체계 중앙화 관리에 대한 연구)

  • Kwon, Soon-Chang;Kim, Young-Soo
    • Korea Journal of Hospital Management
    • /
    • v.4 no.1
    • /
    • pp.1-20
    • /
    • 1999
  • Since the late 1980s, there have been radical changes in the managerial environment of Y University Medical Center(YUMC). Externally, the competition among hospitals has intensified due to the establishment of universal health insurance in 1939 and the entrance of large enterprises into the health care industry in the early 1990s. In addition, government regulation of medical institution is becoming stricter. Also, consumer groups have continued to demand the respect for patient rights and improvement of the quality of medical services. Internally, the financial condition of YUMC has worsened, not only because weak control and poor mediation in its large-scale structure have made its operation inefficient, but also because the rates of increase in the prices of goods and labor have grown faster than any increases in revenues. This study on materials management at YUMC presents a way for YUMC to reduce costs and increase its productivity, thereby overcoming its financial difficulties and dealing with external pressures. This study utilized the case studies of the materials purchasing and medical supply management in the United States and the comparative analysis of management to suggest short-term and long-term alternatives for innovation in YUMC. The goals of the short-term alternatives for innovation are to centralize the purchasing and supply departments and to simplify the decision-making processes. Through these attempts, it is estimated that YUMC's costs could be reduced by $600,000 per year. In the long-term, it is necessary to consider introducing a Supply Processing Distribution(SPD) system and setting up a centralized electronic system for supply and inventory management, although it is difficult to estimate the effect of cost-cutting because of the lack of analysis data. Thus, YUMC should thoroughly analyze initial investment costs and economical efficiency generated from long-term alternatives.

  • PDF

A Comprehensive Cash Management Model for Construction Projects Using Ant Colony Optimization

  • Mohamed Abdel-Raheem;Maged E. Georgy;Moheeb Ibrahim
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.243-251
    • /
    • 2013
  • Cash management is a major concern for all contractors in the construction industry. It is arguable that cash is the most critical resource of all. A contractor needs to secure sufficient funds to navigate the project to the end, while keeping an eye on maximizing profits along the way. Past research attempted to address such topic via developing models to tackle the time-cost tradeoff problem, cash flow forecasting, and cash flow management. Yet, little was done to integrate the three aspects of cash management together. This paper, as such, presents a comprehensive model that integrates the time-cost tradeoff problem, cash flow management, and cash flow forecasting. First, the model determines the project optimal completion time by considering the different alternative construction methods available for executing project activities. Second, it investigates different funding alternatives and proposes a project-level cash management plan. Two funding alternatives are considered; they are borrowing and company own financing. The model was built as a combinatorial optimization model that utilizes ant colony search capabilities. The model also utilizes Microsoft Project software and spreadsheets to maintain an environment that incorporates activities, their durations, and other project data, in order to estimate project completion time and cost. Ant Colony Optimization algorithm was coded as a Macro program using VBA. Finally, an example project was used to test the developed model, where it acted reliably in maximizing the contractor's profit in the test project.

  • PDF