• Title/Summary/Keyword: Management Works

Search Result 2,114, Processing Time 0.029 seconds

An International Comparative Study on Home Economics Text Books of Middle School (중학교 가정교과서의 국제비교 연구)

  • 차미경;윤인경
    • Journal of Korean Home Economics Education Association
    • /
    • v.3 no.1
    • /
    • pp.113-129
    • /
    • 1991
  • This study was conducted to compare the outward aspects, objectives, and the contents of Home Economics text books of middle schools of Korea, Japan, U.S.A. and England. The results were summarized as follows. 1. The outward aspects of tex books: The Korean text books were small in size and the quality of paper was inferior to those of foreign countries. The Japanese text books were written by many authors, contained many lab works and data. Text books of U.S.A. were big in size made with good quality paper and contained many colour pictures. Text books England contained many problems and lab works. 2. Objectives of the Home Economics and Unit objectives: The objective of the subjects of Home Economics was written only in Korean text books. The unit objectives were described most concretely and detailedly in Korean text books comparing with other countries. 3. Contents: Korean text books covered all six areas of foods, clothings, housing, home management, family and occupation and theoretical explanations prevailed. Japanese text books contained numerous lab works, lacked two areas of home management and occupation, thecontents included a few practical lab works two areas of home management and occupation, the contents included a few practical lab works. In the text books of U.S.A. contained all six areas of Home Economics were covered and special emphasis was placed on self discovory and self development, and vocational guidance was also stressed. The text book of England contained only three areas of Home Economics, clothing, foods and housing; the number of area was limited but the basic theories of covered area was intended to lead to self comprehension through questions and lab works.

  • PDF

Blockchain-based Copyright Management System Capable of Registering Creative Ideas (창의적인 아이디어를 등록할 수 있는 블록체인 기반의 저작권 관리시스템)

  • Hwang, Jung-sik;Kim, Hyun-gon
    • Journal of Internet Computing and Services
    • /
    • v.20 no.5
    • /
    • pp.57-65
    • /
    • 2019
  • Creative works such as webtoon and web novel are part of property rights. However, illegal copies of them are distributed on the internet easily, which raises social issues in today's society. In order to tackle these problems, this paper proposes and presents a blockchain based copyright management system that ensures forgery prevention, robust security features, improving trading performance, cost-effective, and enhanced visibility. The system allows a user to register creative works formally just the same as before registration and also to register simple creative ideas just anytime. In the latter case, if an idea or a thought flashes across through somebody's mind, he or she can register it to the system immediately without formal registration process and afterward, can utilize a way to prove its originality through the system. Regarding large size images and video files of creative works, the system reduces data size and storage volume sharply to be processed by network entities by storing original creative works separately and including only the hash result of creative works to the transactions.

Classification, Dynamics, and Research Direction in Digital Shadow Work (디지털그림자노동의 분류와 동태성 및 연구 방향)

  • Lee, Woong Kyu
    • The Journal of Information Systems
    • /
    • v.30 no.1
    • /
    • pp.105-121
    • /
    • 2021
  • Purpose Today, through digital services, many people enjoy a conveient and comfortable life. Nevertheless, it is easy to find people in our daily lives who are buried in work without any payment that we did not do before digital services. Such un-payed works under digital environment are called digital shadow works. The purpose of this study is to classification and dynamics of digital shadow works and to suggest research direction. Design/methodology/approach Based on two dimension, voluntary participation ('should' type and 'want' type) and work orientation (management-operation), digital shadow works were classified into four categories - chore, makeup, routine, and quest. Findings In digital shadow work there are four types of dynamics - routine and quest, makeup and chore, makeup and quest, and quest and actions in offline. According to the classification and analysis of dynamics, three research directions in digital shadow work are suggested and discussed- digital shadow works operation mechanism considering dynamics, expansion of existing user theories based on survey method by digital shadow works and social influences by digital shadow works.

Development and Application of Sewer Facility Management System (하수도 시설 관리 시스템의 개발 및 적용)

  • Kim, Joon Hyun;Han, Young Han
    • Journal of Industrial Technology
    • /
    • v.19
    • /
    • pp.279-285
    • /
    • 1999
  • An integrated sewer management system was developed for the analysis of sewer flow and for optimal operation of sewer works using ArcView and SWMM. SWMM and ArcView were dynamically linked together using Avenue in order to construct user-friendly management system. The developed system was applied to a residential area in Choonchun city to verify its utilities. All the relevant field data were analyzed on the basis of developed system, and the modeling of sewer flow was implemented using RUNOFF, EXTRAN, TRANSPORT in SWMM. This system is now in the process of connection to the management system of watershed and surface environment in order to develope an integrated environmental management system. Futhermore, this system will be a critical part of overall control system of sewer works including sewer line and wastewater treatment plant. As this system can provide comprehensive prediction of flow and pollution profiles, it could serve as a tool not only for optimal management, but also for decision support system to examine the efficiency of planning and implementation of sewer projects.

  • PDF

Weight Evaluation of Risk Factors for Early Construction Stage (초기 건설공사 리스크인자의 중요도 산정)

  • Hwang Ji-Sun;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.115-122
    • /
    • 2004
  • This study identifies various risk factors associated with activities of early construction stage, then establishes the Risk Breakdown Structure(RBS) by classifying the risks into the three groups; Common risks, risks for Earth works, and risks for Foundation works. The Common risks are identified and classified by considering various aspects of the early construction stage such as financial, political, constructional aspects, etc. The risks for Earth works and Foundation works are identified in detail by surveying technical specifications, relevant claim cases and interviewing with experts. These risks are classified based on the Wok Breakdown Structure(WBS) of the early construction stage. The WBS presented in this study classifies the works of early construction stage into four categories; excavation, sheeting works, foundation works, footing works. This study suggests a risk analysis method using fuzzy theory for construction projects. Construction risks are generally evaluated as vague linguistic value by subjective decision making. Fuzzy theory is a proper method to quantify vague conditions of construction activities. Therefore, this study utilizes fuzzy theory to analyse construction risks. The weight of risks is estimated by reflecting the interrelationship among risk factors from absolute weights obtained by fuzzy measure into the relative weights by Analytical Hierarchy Process(AHP). The interrelationship is estimated by Sugeno-fuzzy measure.

An Analysis of the importance in fire-stations' works and redesign by disaster management steps (재난관리 단계별 소방업무 중요도분석 및 업무재설계)

  • Park, Chanseok
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.4
    • /
    • pp.572-582
    • /
    • 2014
  • Fire-stations' works limited to the existing fire protection rescue and emergency services in rapidly changing disaster environment are not difficult to deal with the fire service demand of the people any longer. In this study, after calculating the importance of the disaster management about fire-stations' works by disaster management steps thorough a survey of experts about Fire and Disaster, firefighting tasks are to be redesigned. Experts have the higher rating in preparation step of firefighting tasks. Because securing resources and building systems in preparation step and safety training in prevention step have a high importance, it is required to improve efficiency of firefighting tasks through redesign. The most important point in redesign is to realize fire-stations' works are to expand and to develop such a policy if fire-offices excavate the civil and government cooperation works and provide such legal and institutional basis of establishment and operation. And it should be sought to maintain international cooperation for international disaster response. Ultimately, fire-offices will have further expansion in quality and simultaneously quantitatively by excavating 'collaboration (business cooperation)' or enhancing existing works in addition to existing 'fire and rescue, first aid' business.

Claim Management during Construction based on Key Claim Management Factors (클레임 핵심관리요인을 기반으로 한 건설공사 중의 클레임 관리)

  • Lee, Jun-Hyung;Lee, Hyun-Soo;Park, Moon-Seo;Kim, In-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.463-468
    • /
    • 2007
  • The disputes in construction projects are very important issue for stakeholders. However, many of presented claims have not received the compensation money required, and frequently turned down. The most cause is that the claims are not managed systemically on construction. Therefore, it is important to identify which management works are conducted on construction and how significantly do they relevant to construction claim. This research derives key claim management factors through analyzing causes for claim success and failure, and then presents management works relevant to them. This research also proposes the method for effective claim management and its expected effect through expert interview.

  • PDF

Examining Change Order Reasons for Non-Structural Utility Support Projects in Healthcare Facilities

  • Genota, Naomi P.;Kim, Joseph J.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.188-195
    • /
    • 2022
  • Although issuing change orders is a common practice in the construction phase of any project, non-structural utility subcontractors are struggling and seek to find a way to reduce change orders. Therefore, this paper presents the analysis results on change orders to cultivate possible suggestions and solutions on how to reduce or minimize change orders in mechanical, electrical, and plumbing (MEP) works. Change orders in non-structural utility works are analyzed based on six categories such as rerouting and change of location, changes in weight, rejected design by Office of Statewide Health Planning and Development, District Structural Engineer, or the Structural Engineer of Record, unforeseen conditions, changed equipment, and owner-initiated change. The analysis findings showed that rerouting and changing location is the most significant cause, followed by unforeseen conditions. The results not only contribute to the existing body of knowledge on change order research area, but also help MEP contractors reduce the time and cost of change orders.

  • PDF

A Review of the Improvement of Construction Management (CM) System and the CM Policy for the Public Construction Works (공공사업의 CM제도 개선 및 정책방향)

  • Jang Kie-Chang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.207-212
    • /
    • 2002
  • The Construction Management(CM) System in Korea is systematized both in name and reality by being prescribed in Construction Industry Act('97) and Construction Management Act('01) through various discussions considering reformation of construction industry structure and enhancement of construction technology competitiveness. Specially in the public construction works, CM Pilot Project is promoted by central government for the activation of CM system introduced for efficiency of public construction project. The promotion of Pilot Project is not only the settlement and activation of CM system but also the process to embody and diversify the CM system. Now we should develop various CM application type such as Owner type, PM type and type for private capital project in doing so. And with this efforts, we could expect that CM system should play an important role to enhance the efficiency of public construction works and should affect private construction sector.

  • PDF

Correlationship with Selecting Business Process and Strategy for BPM of Construction Company (건설기업의 BPM도입 대상 업무선정과 기업전략의 상관성)

  • Cho, Hang-Min;Song, Young-Woong;Lim, Hyung-Chul;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.6
    • /
    • pp.28-39
    • /
    • 2009
  • Recently, it has been an issue on BPM(Business Process Management, below BPM), which is a sort of business management methods that secures agility and flexibility through sustainable improving and monitoring in a rapid-changing environment. To introduce BPM to construction company we need to set up a procedure for objective, define criteria according to the business structure defined by BPA(Business Process Architecture, below BPA) and analyze works and then select targets. Those BPM target works need to have a close relationship with corporate strategy and to support realizing corporate value. Therefore, this paper will study BPM Target works of construction companies for an effective introduction BPM through questioning from working-level staff. In addition, it will analyze their types and corporate core strategy and BPM target works, then study the main strategy according to BPM target types. And also, this study is expected to help construction companies to choose the business for BPM adoption through analyzing current situation and strategy for business selection when adopting BPM.