• Title/Summary/Keyword: Management Works

Search Result 2,114, Processing Time 0.027 seconds

MODEL FOR GOVERNMENT RESCUE POLICIES IN PUBLIC-PRIVATE PARTNERSHIP PROJECTS

  • S. Ping Ho
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.996-1001
    • /
    • 2005
  • Today, government is no longer considered the sole provider of public works or services. Public-Private Partnership (PPP) has been recognized as an important approach to solving problems for governments in providing public works and services. However, the joint ownership of public works/services complicates the administration of PPP projects. Particularly, the fact that government may rescue a distressed project and renegotiate with the developer causes serious problems in project procurement and management. This paper aims to study when and how government will rescue a distressed project and what impacts government's rescue behavior has on project procurement and contract management. A game-theory based model for government rescue will be developed. This pilot study, the author hopes, may provide theoretic foundations to practitioners/policy makers for prescribing creative PPP procurement and management policies and for examining the effectiveness of PPP policies.

  • PDF

PROPOSING MANAGEMENT OF WORK PRIORITY TO REDUCE CONSTRUCTION FAILURE CLAIMS

  • In-ho Kim;Moon-Seo Park;Hyun-Soo Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.1171-1176
    • /
    • 2005
  • Dispute related to construction projects involving numerous persons is one of the biggest challenges faced by contractors today. It costs a substantial amount of money and time in resolving these kinds of claims. Recently, with the changes in the construction environment and thought of relation with owner, the number of construction claims has increased. But, a majority of these claims do not prevail, and in fact, frequently get dismissed in its entirety. The reasons for such dismissals include the ignorance about the claims, lack of clear and convincing evidence, and so on. But most of reasons are the claims are not managed well on construction process. This paper analyzes the failure causes by relying on past claim failure cases, and then drew works that have connection with failure causes through interview. It also presented importance degree of construction management works.

  • PDF

Study on the Safe Evacuation Management in a Power Supply Disturbed Emergency

  • Suzuki, Nobuyuki;OHASHI, Tsubasa;WHORLOW, James R
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.87-91
    • /
    • 2015
  • For construction projects it is imperative that site management gives the highest priority to planning safe site evacuation for all foreseeable emergencies, including earthquakes and typhoons which are often experienced in Japan. This is especially important and even more critical for high risk projects involving underground works, such as Tunneling & Pneumatic Caissons. Based on the safety regulation of underground works, a back-up power supply system must be provided during the construction period at all times. Often, fluorescent lamps with re-chargeable batteries are provided for infrequent emergency cases, however these have a questionable useable life span and thus need careful maintenance and periodical replacement. In this paper we focused on using the phosphorescence materials to indicate the evacuation direction. As a result, it was confirmed that the phosphorescence materials were considered useful in reducing panic and facilitating a controlled evacuation in the event of a total black-out due to power failure.

  • PDF

The Architecture Model for Defense Systems Test Works based on Systems Engineering (SE기반 무기체계 시험업무 아키텍처 모델 연구)

  • Taeheum Na;Dongeun Heo;Youngmin Kim;Jooyeoun Lee
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.27 no.2
    • /
    • pp.203-212
    • /
    • 2024
  • This paper describes the establishment of defense systems test works architecture model for the efficient operation of an expanded test organization and the provision of standardized test services after the integration of proving grounds in ADD. The system engineering vee model is applied to the defense system test works to define the project management model and the unit-test management model. In order to establish the defense systems test works architecture model, the process flow of test works, artifacts by life cycle, and interrelations between regulations and test works are explained, and Integrated Test Information System for implementation of architecture model is discussed. Through the defense systems test works architecture model presented in this study, it will contribute to quickly responding to the test requirements of complex and diverse defense systems, efficiently managing projects, and providing standardized test services.

An introductory research of application of Markov process to literary study

  • Park, Chae-Heung
    • Journal of Korean Society for Quality Management
    • /
    • v.28 no.4
    • /
    • pp.99-105
    • /
    • 2000
  • This paper attempts to apply Markove chain theory to literary works. the objective of this paper is to show the trend of authors and his works by way of Markovian Models. In this introductory research, it is useful to make simple criteria as virtue and evil, good and bad, justice and injustice, positive and negative, man and woman, etc. Markovian transition matrixes which are derived by M.L.E. and A.U.E are almost same. In case of Hamlet, we are able to know the author of Hamlet or his works are inconsistent and fickle.

  • PDF

A Study on the Management of Copyright Information for Increasing the Free Use of Government Publications as Public Works (공공저작물로서 정부간행물 자유이용 촉진을 위한 저작권정보 관리에 관한 연구)

  • Seo, Hyeongdeok;Joung, Kyoung Hee
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.22 no.3
    • /
    • pp.125-141
    • /
    • 2022
  • This study aims to suggest measures for handling copyright information on government publications during records and archives management to use them freely as public works according to Article 24-2 of the Copyright Act in Korea. Through email interviews with 17 records managers, persons in charge of government publication management, and government staff with experience in production from April 4 to June 13, 2022, this study determined the current situations and problems related to producing and managing copyright information on government publications. Based on the interview findings, this research suggested the following. First, Article 24-2 of the Copyright Act must be revised to apply the Korea Open Government License (KOGL) type 1 mandatorily to all public works. Second, a cooperative system for managing copyright information on government publications should be established to improve their production and management effectiveness. Third, copyright information, such as authors, copyright holders, copyright duration, information on the copyright property transfer, public works status, and reasons for nonpublic works, must be managed through records and archives management systems. Fourth and last, information on public works must be provided during the registration number application for government publication so that everyone can access the full texts of the publications on the National Archives of Korea website.

The Development of a Construction Project Collaboration System: eWorks21 (eWorks21: 건설프로젝트협업시스템의 개발)

  • 구상회;최성철
    • The Journal of Society for e-Business Studies
    • /
    • v.6 no.3
    • /
    • pp.149-161
    • /
    • 2001
  • Construction and engineering is one of the world largest industry. Yet, it Is one of the most inefficiently operated industry. Since buildings are not constructed by mass production, construction projects usually require intense communication and collaboration between participants, who are usually widely dispersed. That is the main reason for the inefficiency. eWorks21 that we developed in this research, is a project management system that can improve communication and collaboration among project participants using the Internet. eWorks21 can reduce project life-cycle, costs, and increase revenue, resource utilization, controls, transparency, and competitiveness, which will eventually provide infrastructure for knowledge management of construction projects. In this research, we classified currently available project collaboration systems, and analyzed the benefits gained by using project collaboration systems. Then we describe the implementation of eWorks21, and discuss employment and utilization strategies of project collaboration systems.

  • PDF

Deduction of Main Hazard Cause to the Progress of Iron Work for Accident Analysis (재해사례 분석을 통한 제철소 공정별 주요위험요인 도출)

  • Hong, Sung-Man;Park, Peom;Sun, Su-Bin
    • Journal of the Korea Safety Management & Science
    • /
    • v.11 no.3
    • /
    • pp.33-40
    • /
    • 2009
  • Steel and iron manufacture works exist that many latency risk as melting liquid of high temperature, work of high place, and so on. Once in a while, the accident case make use of basic data for latency risk analysis in a place of business. In this paper, we investigated the cause of the accident in steel an iron works. The result, we came across that many latency risk in steel and iron manufacture works. The main type of risk are fall, narrow, come flying, etc. Most of the latency risk type are repetition and conventional accident. Accordingly, steel and manufacture works must prevent to repetition and conventional accident.

Development of Design Support System to Optimize the Temporary Work (강교량 설치 가설공사의 최적화설계 지원시스템 개발)

  • Cho, Hun-Hee;Park, Jae-Woo;Cho, Moon-Young;Kim, Jung-Yeol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.115-123
    • /
    • 2005
  • Design of steel $bridge^{\circ}AEs$ temporary works has conducted relying on the experiences of engineers based on the previous similar projects. Consequently, there have been arguments against over-design of temporary bents to be required at the actual construction sites, and unnecessary design changes have been issued at the construction stage. In this study, we have developed an optimum design support system for temporary works of the steel bridge construction through establishing the database for the materials to be needed for implementation of temporary works. We've also improved the accuracy and efficiency of the works through the design optimization for temporary works, and contributed to reduce design changes as well as to utilize the design informations at the construction stage.

Improvement Plan of Safety Educational System for Construction Demolition Works (건축물 해체공사의 안전교육시스템 개선방안)

  • Choi, Jong-Soo;Kim, Kyung-Hwan;Cha, Hun-Joo
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.5
    • /
    • pp.57-64
    • /
    • 2007
  • In the field of domestic construction demolition works, work process management system is left behind compared with that of several advanced countries such as US, Japan and UK. Especially, the problems regarding safety management are more serious in terms of the availability of safety manuals and law system. The analysis results fiom the questionnaire survey and interviews with demolition engineers indicated that current safety management practices in demolition works lack systematic approach and inappropriate in securing labors' safe working environment. In addition, field labors and managers strongly requested the improvement of safety educational system. Grounded upon the analyses results and investigations, suggestions were drawn for the establishment of advanced safety educational system.