• Title/Summary/Keyword: Maintenance and Operation level

Search Result 245, Processing Time 0.024 seconds

Operation Strategy for Electronic Commerce Promotion Base on Common Mechanic Industry (ASP기반으로 한 기계산업체간의 성공적 전자상거래 구축을 위한 전략연구)

  • Jeong, Sei-Hyun
    • Journal of Information Technology Services
    • /
    • v.1 no.1
    • /
    • pp.81-117
    • /
    • 2002
  • The generalization of Internet use has been spreaded all over the world and impacted company to introduce intranet and extranet for their operation which dealt with electronic commerce. For these reason, endeavor of implementation of web site system is promotioned and enhanced the possibility of adaptation range for the view of company. Dramatic competition which company faced with the use of internet and request from all over the world made company brought company to various and different type of level. It is necessary to develop website system with experty knowledge to satisfy customer needs. To deal with this situation, works from the level of government should proposed to spread whole country business which propelled through kyungnam mechanic industry information promotion center. With strategic proposal concerning district characteristics to adapt electronic commerce successfully, information promotion should performed. Support of government is needed continuously to realize infra of ASP composed of 4,877 mechanic industry company. It might be possible to deal with international rapid change with cooperation of company and government related department.

Analysis of Train Operation Obstacle Using Number of Failures and Delay Time of Electric Door System (전기식 도어시스템의 고장건수 및 지연시간을 활용한 열차운행장애 분석)

  • Lee, Bon Hyung;Kim, Doo-Hyun;Kim, Sung-Chul
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.1
    • /
    • pp.12-17
    • /
    • 2020
  • This paper analyzes functions of component parts of D-Urban Railway's door system along with operation obstacle risks on frequency(the number of occurrences/year) and severity(delay time/the number of occurrences). Based on this, the paper presents improvements and current system's problems after obstacle risks of EMU and door system are appled. The obstacle of door system causes corrosion of main parts such as DCU due to heat problem of operation environment, problems of maintenance methods and deterioration. DCUs on PCBs with more than 50% pattern corrosion cause problems. Even though the number of door system's obstacle occurrences for the last 5 years is 42, along with 104 minutes of operation obstacle, EMU operation obstacle risk is low(Level 1), which indicates there is limit in matrix of railway risks presented by the standard of railway safety management system. Therefore, it is necessary to have railway risk matrix suitable for the field. Finally, the paper deducts the obstacle risks through frequency and severity. Since 2017 when the risks of EMU and door system's obstacle, that of EMU has been 24(47% reduced) and that of door system has been average 9.5 per year(23% reduced).

Improving the supply level of repair parts (수리부속 적정 보급수준 개선에 관한 연구)

  • Kim, Young Joo;Kang, Kyung Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.3
    • /
    • pp.369-376
    • /
    • 2014
  • The national Logistics Information system has been rapidly developed on account of the dramatic improvements in the military's logistics support system and supply support system, making a transition from manual work system to computerized work system. Supply level, however, does not reflect these changes in the overall logistics environment and still retains the state it was in the 1970s. This research uses the accumulated data from the equipment maintenance information system developed in the year 2009 to analyze RWT(Requisition Wait Time) and CWT (Customer Wait Time). The analysis estimated the realistic transportation and ordering time and led to the conclusion that the differentiated ASL operation system that considers demand level should be adopted instead of the uniform ASL employment system.

Radiation Exposure Reduction in APR1400

  • Bae, C.J.;Hwang, H.R.;Matteson, D.M.
    • Journal of Radiation Protection and Research
    • /
    • v.28 no.2
    • /
    • pp.127-135
    • /
    • 2003
  • The primary contributors to the total occupational radiation exposure in operating nuclear power plants are operation and maintenance activities doting refueling outages. The Advanced Power Reactor 1400 (APR1400) includes a number of design improvements and plans to utilize advanced maintenance methods and robotics to minimize the annual collective dose. The major radiation exposure reduction features implemented in APR1400 are a permanent refueling pool seal, quick opening transfer tube blind flange, improved hydrogen peroxide injection at shutdown, improved permanent steam generator work platforms, and more effective temporary shielding. The estimated average annual occupational radiation exposure for APR1400 based on the reference plant experience and an engineering judgment is determined to be in the order of 0.4 man-Sv, which is well within the design goal of 1 man-Sv. The basis of this average annual occupational radiation exposure estimation is an eighteen (18) month fuel cycle with maintenance performed to steam generators and reactor coolant pumps during refueling outage. The outage duration is assumed to be 28 days. The outage work is to be performed on a 24 hour per day basis, seven (7) days a week with overlapping twelve (12) hour work shifts. The occupational radiation exposure for APR1400 is also determined by an alternate method which consists of estimating radiation exposures expected for the major activities during the refueling outage. The major outage activities that cause the majority of the total radiation exposure during refueling outage such as fuel handling, reactor coolant pump maintenance, steam generator inspection and maintenance, reactor vessel head area maintenance, decontamination, and ICI & instrumentation maintenance activities are evaluated at a task level. The calculated value using this method is in close agreement with the value of 0.4 man-Sv, that has been determined based on the experience aid engineering judgement. Therefore, with the As Low As Reasonably Achievable (ALARA) advanced design features incorporated in the design, APR1400 design is to meet its design goal with sufficient margin, that is, more than a factor of two (2), if operated on art eighteen (18) month fuel cycle.

Optimal Implementation Strategies of Building Information Modeling for Construction Projects of LH

  • Lee, Ji-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.60-62
    • /
    • 2015
  • The BIM-based architectural design can be the optimal method to improve all sectors of construction industry and reduce environmental impact through digital technologies. The goals and effects of BIM needs in LH to be newly planned based on the experience of public sectors, which will ultimately contribute to maximization of effectiveness. Referring the excellent case in the UK, the current BIM standards according to maturity level 2 handle the contents related to modeling, collaborative data production, data management and assure BIM data have to be used from building construction to operation and maintenance of buildings. Therefore the strategy for the utilization of BIM for construction projects in LH consisted of three steps; first, the minimization of defects via BIM: second, strengthening the competitiveness of construction and asset management: third, upgrading the system of building production and maintenance control. After this trial, LH can accumulate know-how for building construction to be more costeffective and competitive.

  • PDF

A Study on the Standardization of Operation System for Road Tunnels (터널운영시스템 표준화 연구)

  • Kim, Tae-Hyung;Kim, Jin;Keum, Jae-Sung;Tae, Jae-Ho;Kim, Sun-Hong;Hong, Dae-Hie
    • Proceedings of the SAREK Conference
    • /
    • 2008.11a
    • /
    • pp.75-79
    • /
    • 2008
  • Since tunnel construction order was placed one by one, various sensors and actuators installed at the RTU and higher level system in each tunnel maintenance office had their own protocols depending on construction company. The TGMS testbed established on the extended region of Yong-dong Highway, for example, did not have consistent protocol between each automation levels and management levels without considering the functions and/or roles of each level. The management sever in each tunnel was simply networked to the TGMS server. Therefore, it is impossible to implement a new control algorithm as well as to integrate each other since each tunnel was constructed by different company. So, if the construction company is out of business, there is no way to maintain the corresponding tunnel effectively. In order to solve this problem, all the necessary standard protocols was established between automation level and management levels. These interface standards provide the clear classification between individual tunnel system and tunnel management system. So, even if construction company is different, its effect is minimized, so that it is expected to successfully establish PC based TGMS.

  • PDF

국가혁신시스템의 기능분석 -시스템이론의 접목을 통한 탐색적 개념연구-

  • 임윤철
    • Proceedings of the Technology Innovation Conference
    • /
    • 1996.12a
    • /
    • pp.241-264
    • /
    • 1996
  • This article introduces the five functions of the national innovation system (NIS). As the national innovation system is a kind of social systems in the national level, the five generic functions of open system-production boundary spanning, maintenance, adaptation management functions-are applied to the NIS. The production function is the primary process, which produces innovative products and services of the NIS. The boundary spanning function is the function of procuring the input and disposing the innovation output or aiding in these process. Experienced R&D human resources, R&D funds, technology etc. belong to the input of the NIS. The maintenance function is responsible for the smooth operation and upkeep of the system in terms of various conditions. The adaptive function is to help the system change and adapt, scan the environment for problems, opportunities, and technological developments. It faces outward for the survival of the system from the long-term view. The management function carries out planning and controlling the overall activities for the other four functions in order to run the system. Finally it discuses implications for the diagnosis and the decision making process of S&T policy.

  • PDF

A Study on Operational Optimization Based RAMS Performance Requirements Design of Railway Systems (운영기반의 철도시스템 RAMS 성능 요구사항 설계에 관한 연구)

  • Choi, Sung-ho;Kim, Gil-dong;Koo, Jeong-seo
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.11
    • /
    • pp.1549-1554
    • /
    • 2018
  • Recently the design of railway systems have been performed, based on the analysis of operational conditions and service targets, it is to optimize the effectiveness and efficiency of system operation. Many RAMS requirements have been developed to transform operation conditions into system design characteristics. However, our railway industry has not actived the application of RAMS into system design performance. According to short of RAMS application, many technologies that have been developed are not only applied the existing systems that is operating, but also have not succeed to apply for new systems. In order to design the effective and efficient railway systems that are optimized to operation conditions and service targets, a systems approach and RAMS management are necessary in railway development, operation and maintenance. Therefore, in this study, the RAMS performance requirement design methods are discussed. the allocation methods from system level to each devices of subsystems.

A Study of Port Facility Maintenance and Decision-making Support System Development (항만시설 유지관리 의사결정 지원 시스템 개발 연구)

  • Na, Yong Hyoun;Park, Mi Yeon;Choi, Doo Young
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.2
    • /
    • pp.290-305
    • /
    • 2022
  • Purpose: Currently, port facility informatization technology is focused on the planning and design phases, so the necessity of research and technology development on the port facility maintenance system based on life cycle-level information is emphasized. Method: Based on the maintenance history data of port facilities and facility operation information, from the perspective of the life cycle of port facilities, the system is configured to enable maintenance decisions for port facilities through analysis of aging patterns, performance degradation prediction models, and risk analysis and proposed a method of expressing information. Result: A function was developed to simultaneously display the SOC performance evaluation and the comprehensive performance evaluation developed in this study, so that mid-to long-term maintenance and reinforcement and facility expansion can be applied and comparatively judged. Conclusion: The integrated port performance system developed in this study induces and supports the risk minimization of port facility management by proactively promoting appropriate repair and reinforcement measures through historical and operational information on port facilities.

Economical Analysis of Cervical Disc Disease by Anterior Inter-body Fusion Methods - Comparing of Bone Graft vs Plating - (경추간판 탈출 환자의 전방 고정술에 따른 경제적 분석 - 골 이식법과 금속판 고정 병행술의 비교 -)

  • Gill, Seung-Bae;Lee, Sang-Youl;Heo, Seung-Ho;Jang, Yeun-Gyu
    • Journal of Korean Neurosurgical Society
    • /
    • v.30 no.2
    • /
    • pp.201-206
    • /
    • 2001
  • Objective : The purpose of this study was to assess the complications, duration of admission, cost effectiveness, radiologic stabilization of the anterior cervical bone fusion in the treatment of cervical disc disease with and without plating. Materials and Methods : Fifty-two surgically treated patients for cervical disc disease were reviewed. Group I consisted of consecutive treated patients with iliac auto-bone graft without instrumentation after anterior cervical discectomy. Group II consisted of consecutive treated patients with iliac autologous-bone graft with CASPER cervical plate fixations. Radiologic fusion was decided when loss of end plate boundary between graft bone and vertebral body and immobile, maintenance of the disc space were evident on simple dynamic plain films. The patients were discharged after the stabilization of cervical motion by films was of tained. These groups were analysed multiple variably with Mann-Whitney U-test. Results : Group I consisted of 18 patients, group II consisted of 34 patients. Mean age was $49.0{\pm}8.1years$, mean duration of admission was $17.27{\pm}10.51days$, mean costs for treatment was $1,970,000{\pm}475,000won$. In group I, mean age was 47.7(34-60) years, 16 patients had undergo on one-level operation, 2-patients had undergo on two-level operation, mean duration of admission was $28.7{\pm}10.4days$, mean costs for treatment was $2,194,473{\pm}561,639won$. The periods of stabilization was $6.6{\pm}3.36weeks$ on radiologic study. Mean periods of out patient follow up was 16.8(6-64) weeks after discharge. Mean period of radiologic follow up was 17.3(4-6) weeks after surgical operation. In group II, mean age was 49.7(37-62) years and 18 patients one-level operation, 14- patients had undergo on two-level operation and 2-patients three-level operation. Mean duration of admission was $11.24{\pm}3.29days$, mean costs for treatment was $1,850,823{\pm}389,372won$. The periods of stabilization was $5.88{\pm}7.07weeks$ on radiologic study. Mean period of out patients follow up was 16.7(4-60) weeks after discharge. Mean period of radiologic follow up was 12.4(3-52) weeks after surgical operation. The duration of admission showed statistical significance in Group II but other items showed no significant difference between two groups. Conclusions : The more economic, early life return and effective method of cervical disc disease in our series were evident in patients who had undergone, iliac bone graft and plate fixations after anterior discectomy.

  • PDF