• Title/Summary/Keyword: Maintenance Work

Search Result 1,273, Processing Time 0.027 seconds

Fuzzy-based Decision Support Model for Determining Preventive Maintenance Works Order (퍼지 집합을 활용한 건물 사전 보수작업 대상 선정 지원모델)

  • Ko, Taewoo;Park, Moonseo;Lee, Hyun-Soo;Kim, Hyunsoo;Kim, Sooyoung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.51-61
    • /
    • 2014
  • Preventive maintenance of buildings has increased the importance of interest in that it is able to maintain the performance building has and to prevent a problem occurred in future. For improved preventive maintenance work, it should be performed to select works order clearly and preceded the accurate measurement for the state of works order. when measuring the conditions, measurement of the state of work order considering the various criteria is more effective than to measure by only criterion. But, there are something hard to evaluate exactly between the criteria because of decision-maker's subjective judgments. To solve these problems, this research proposes decision making support model to determine preventive maintenance works order using Fuzzy-sets. By using Fuzzy-sets when measuring state of work objects, it can be reduced vagueness of judgments by decision-makers. This model can be used as a tool for objective evaluation of preventive maintenance work orders and offer the guideline to perform decision-making.

A Study on the Estimation of Proper Construction Cost for Road Pavement Maintenance Work (아스팔트포장 유지보수 적정공사비 산정방안 연구)

  • Oh, JaeHun;Song, TaeSeok;An, BangYul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.16-26
    • /
    • 2020
  • Road Pavement Maintenance Work is generated in a variety of different field conditions, and it is difficult to calculate the construction cost because there are no detailed criteria when preparing the estimated construction cost. Unlike new pavements, Road Pavement Maintenance has to be constructed with operating vehicles, and there are many differences in productivity depending on urban areas, limited work hours, night-time, construction area, etc. To compensate for this, the standard for calculation of construction cost provides additional charges for the number of lanes, residential areas, working hours, and night work, but it applied differently depending on construction officials. In this study, construction cost estimation standards that can properly reflect the conditions of the site was investigated for major types of Road Pavement Maintenance work. The site was investigated and analyzed mainly for many construction sites with 'overlay of asphalt after cutting', 'restore surface', 'repair of pavement', and 'recovery of roadway'. The criteria for the application of construction volume separately according to working hours, public places, and land area including extra charges for basic downtown and residential area. The hours of operation were divided into three types(7 hours, 5 hours, 3 hours) excluding movement and preparation time, and each type provided a coefficient for dividing the area of the construction site into five types. The construction cost calculation method based on the construction purpose is site conditions is proposed accordingly, and it is deemed that a plan for the designer to calculate the construction cost has been prepared in consideration of the site conditions.

Nutrient Requirements of Exercising Swamp Buffalo, Bubalus bubalis, from Materials Balance and In Vivo Body Composition by the Body Density Method. I. Aspects of Energy and Protein Metabolism in Working Cows

  • Mahardika, IG.;Sastradipradja, D.;Sutardi, T.;Sumadi, IK.
    • Asian-Australasian Journal of Animal Sciences
    • /
    • v.13 no.5
    • /
    • pp.605-612
    • /
    • 2000
  • Four young swamp buffalo cows of similar age ranging in weight between 280 to 380 kg and trained to do physical work were used in a study to determine energy and protein requirements for draught using a $4{\times}4$ Latin square designed experiment. The experiment consisted of field trials employing 4 levels of work load, e.g. no work as control, and loads amounting 450 to 500 Newton (N) pulled continuously for 1, 2 and 3 h daily for 14 consecutive days. Cows were fed king grass (Penisetum purpuroides) ad libitum and were subjected to materials balance trials. Body composition was estimated in vivo by the body density method and daily energy expenditure (EE) was calculated from ME minus retained energy (RE). The results show that EE while not working ($EE_{resting}$) was $0.42kgW^{0.75}MJ/d$ and maintenance ME ($ME_m$) was $0.37kgW^{0.75}MJ/d$. ME requirement increased to 1.65 times maintenance for the work of 3 hours. The energy expended for doing exercise ($E_{exercise}$) was 9.56, 20.0 and 25.86 MJ/cow for treatments 1, 2 and 3 II, respectively. Fat retention was absent in all groups of working cows, but protein retention was only negative for cows undertaking 3 h work. The relationship between $E_{exercise}$ (MJ), work load (F, kN), work duration (t, h) and body mass (W, kg) was found to be: $E_{exercise}=(0.003F^{1.43}t^{0.93})/W^{0.09}MJ$. The maintenance requirement for digestible protein was $2.51kgW^{0.75}g/d$, whereas digestible protein for growth ($DP_{growth}$) and for work ($DP_{work}$) followed the equations: $DP_{growth}=[(258+1.25W^{0.75}){\Delta}Wkg/d]g$ and $DP_{work}=[12.59e^{0.95t}]g$, respectively The coefficients a, b and c for the calculation of $E_{exercise}$ components according to the Lawrence equation were found to be 2.56 J/kgW.m, 5.2 J/kg load carried.m and 0.29, respectively, thus efficiencies to convert ME into work were 0, 16.09, 27.3 and 32.44% for control, 1, 2 and 3 h/d work, respectively. ME and DP requirements for a 250 to 400 kg working buffalo cow allowing to growth up to 0.5 kg/d are presented.

A Study on the Rationalization of Management and Maintenance Cost for Railway Investment Assessment - Focus on High Speed Railway - (철도투자평가를 위한 운영.유지보수비용 합리화 방안 - 고속철도를 중심으로 -)

  • Suh, Sang-Kyo;Sung, Deok-Yong;Roh, Byoung-Kuk;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.331-340
    • /
    • 2009
  • This study is objected by suggesting rationalization method of management and maintenance cost for railway investment assessment. The estimate of rational benefit and cost are a work of vital importance to decide railway investment as preliminary feasibility investigation is institutionally reinforced since January 2007. In particular, railway management and maintenance cost have to be applied to realistic and detail cost as railway investment assessment guide. For example, types of railway, construction of new line, improvement of conventional line, double tracking, railway electrification. However, railway investment assessment is inconsistency because of estimating the railway management and maintenance cost using existing unrealistic management and maintenance cost. Therefore, this study is performed parametric analysis effecting on the railway management and maintenance cost considered new technique, enhanced facilities and improved standard. Also, it suggests the itemized standard management and maintenance cost. Finally, it will be helped to establish the base of railway investment through the rationalization method of management and maintenance cost.

  • PDF

A Study on Garden Facility Management of Seoul Garden Show 2015 and 2016

  • Hong, Kwang-pyo;LEE, Hyuk-jae
    • International Journal of Advanced Culture Technology
    • /
    • v.7 no.2
    • /
    • pp.125-136
    • /
    • 2019
  • This study focuses(selected) on garden facilities of designer gardens created at the 1st and 2nd Seoul Garden Shows and examined installed facilities at each designer garden by categorization according to type, material and functions. The study observed problems occurring from maintenance of garden facilities as time passes by and collected basic data to develop maintenance guideline aiming to make contribution to further spreading and promotion of high quality garden culture. This study examined all gardens created at 1st and 2nd Seoul Garden shows in 2015 and 2016. There were 18 gardens built in 2015 and 16 in 2015.The study looked at responsible entities for maintenance of facilities and examined maintenance system for managing these gardens. Garden facilities of the study were categorized into paving, facility for rest, playground, water facility, environmental sculpture and planting media facility according to categorization by landscape design standards and construction guidelines. Target gardens of this study are maintained mostly by citizen gardeners who are passionately carrying out maintenance work while communicating with designers. However, these citizen gardeners lack technical knowledge to manage various facilities. Also, maintenance manuals submitted by garden designers do not offer sufficient details on facility maintenance which calls for professional maintenance and clear instructions on facilities from early phase of design.

Standardization of Maintenance and Failure of Transfer Crane (Transfer Crane의 고장 및 정비 표준화)

  • Yun Won-Young;Lee You-Hyoun;Ha Young-Ju;Kim Gui-Rae;Son Bum-Shin
    • Journal of Navigation and Port Research
    • /
    • v.30 no.6 s.112
    • /
    • pp.525-531
    • /
    • 2006
  • In the port, the yard crane is very important. If a container crane or a transfer crane is broken down, it costs a lot because of the delay of work during the period of repair or reorder. But, we don't have enough spare parts because of the high cost. It is necessary to maintain high reliability of the crane through effective preventive maintenance and failure analysis. In this paper, we analyse the function and failure mechanism of the transfer crane which is a main equipment in the yard Also, we standardize failures and maintenance works using the historical data of failure and maintenance. This study which is a basic work for effective equipment operation and maintenance will support reliability engineers to decide the optimal design of the next generation equipment and operational policy of equipment.

Development and Application of Dry Process Caisson for Maintenance of Submerged Barber Structure

  • Lee, Joong-Woo;Lee, Seung-Chul;Oh, Dong-Hoon;Kwak, Seung-Kyu;Lee, Jeong-Su
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2006.10a
    • /
    • pp.105-114
    • /
    • 2006
  • Together with the trend of enhancement in domestic industrial development and economic progress due to import and export, the demand for construction of the roads, bridges, especially port facilities, and several coastal protection and ocean structures is increasing rapidly. MOMAF of Korean Government is driving construction of 9 new ports and renovation of the existing fishery ports. Among these structures most of bridge base, wharves, dolphins, quays, and jetties are being newly built of steel or concrete pile. As the base, supporting bulkheads, and piles are underwater after construction, it is difficult to figure out the status of structures and not enough to get maintenance and strengthen the structures. Every year, moreover, these works suck the government budget due to higher incomplete maintenance expense for protection from corrosions of structures and increased underwater construction period. for the purpose of cutting down the government budget, it is necessary to extend the life cycle of the existing structures. We developed a new method for maintenance of submerged structures near the waterline by allowing dry work environment with the floating caisson. The method shows easy to move around the working area and handle. It also showed not only a significant reduction of maintenance expenses and time for anti-corrosion work but also better protection. This will be a milestone to reduce the maintenance and construction expenses for the shore and water structures.

  • PDF

Development of a General Occupational Safety and Health (OSH) Guide for Maintenance in Etching, Deposition, and Ion Implantation Facilities (반도체 공정 설비 정비 작업 안전보건 가이드: 증착, 식각, 이온주입)

  • Kyung Ehi Zoh;Taek-hyeon Han;Jae-jin Moon;Ingyun Jung;Yeong Woo Hwang;Seyoung Kwon;Kyung-yoon Ko;Mingun Lee;Jaepil Chang;Dong-Uk Park
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.34 no.2
    • /
    • pp.125-133
    • /
    • 2024
  • Objectives: The aim of this study is to develop a comprehensive Occupational Safety and Health (OSH) guide for maintenance tasks in semiconductor processing, specifically focusing on etching, deposition, and ion implantation processes. Methods: The development of the OSH guide involved a literature review, consultations with industry experts, and field investigations. It concentrates on Maintenance Work (MW) operations in these specialized areas. Results: The result is a detailed OSH guide tailored to MW in etching, deposition, and ion implantation facilities within semiconductor processing. This guide is structured to assist maintenance workers through pre-, during and post-MW phases, ensuring easy comprehension and adherence to safety protocols. It highlights the necessity of safety and health measures throughout the MW process to protect personnel. The guide is enriched with real-life scenarios and visual aids, including cartoons and photographs, to aid in the understanding and implementation of safety and health principles. Conclusions: This OSH guide is designed to enhance the protection of workers engaged in maintenance activities in the electronics sector, particularly in semiconductor manufacturing. It aims to improve compliance with safety and health standards in these high-risk environments.

The Characteristics of the Fatal Accidents Caused by Fire, Explosion and Asphyxiation during Welding and Flame Cutting in the Manufacturing Industry (제조업에서의 용접·용단 작업 중 화재·폭발·질식 사망사고 특성)

  • Seo, Dong-Hyun;Han, Ou-Sup;Lee, Keun-Won
    • Journal of the Korean Society of Safety
    • /
    • v.34 no.3
    • /
    • pp.21-27
    • /
    • 2019
  • Many accidents have been occurring during welding and flame cutting work related to maintenance and repair as the domestic manufacturing facilities gradually become decrepit. However, it is not easy to find the accurate statistics and analysis data on accidents occurring during welding or flame cutting operations related to maintenance and repair of machinery and equipment. Therefore, in this study, the fatal accident cases of fire/explosion and asphyxiation that occurred during the welding and flame cutting work in the manufacturing industry were collected and their characteristics were analyzed. Then, we tried to find the connection of the accidents according to the machinery/equipment and the work content, and to provide the materials and measures that can be used to prevent the similar accidents. We collected 329 cases of the fatal accidents related to fire/explosion and leakage/contact of chemical substances in the domestic manufacturing industry during the last 10 years (2008 ~ 2017). Among them, 72 accidents occurred during welding or flame cutting were extracted and the related reports were investigated whether they occurred during usual work or unusual work. Also, the machinery/equipment and the work content related to the accidents were classified and analyzed based on the criteria. The analysis results showed that 31 cases of the fire/explosion accidents occurred during usual work and 32 cases during unusual work, and it was found that 9 cases of asphyxiation death occurred during usual work. Then, from the analysis results, the connections of the machinery/equipment and the work contents related to the accidents were schematized into a accident tree.

Fracture behaviors of tunnel lining caused by multi-factors: A case study

  • Zhao, Yiding;Zhang, Yongxing;Yang, Junsheng
    • Advances in concrete construction
    • /
    • v.8 no.4
    • /
    • pp.269-276
    • /
    • 2019
  • The cracking and spalling caused by fracture of concrete lining have adverse impacts on serviceability and durability of the tunnel, and the subsequent maintenance work for damaged structure needs to be specific to the damaging causes. In this paper, a particular case study of an operational tunnel structure is presented for the serious cracking and spalling behaviours of concrete lining, focusing on the multi-factors inducing lining failure. An integrated field investigation is implemented to characterize the spatial distribution of damages and detailed site situations. According to results of nondestructive inspection, insufficient lining thickness and cavity behind lining are the coupled-inducement of lining failure bahaviors. To further understanding of the lining structure performance influenced by these multiple construction deficiencies, a reliable numerical simulation based on extended finite element method (XFEM) is performed by using the finite element software. The numerical model with 112 m longitudinal calculation, 100 m vertical calculation and 43 m vertical depth, and the concrete lining with 1450 solid elements are set enrichment shape function for the aim of simulating cracking behavior. The numerical simulation responses are essentially in accordance with the actual lining damaging forms, especially including a complete evolutionary process of lining spalling. This work demonstrates that the serious lining damaging behaviors are directly caused by a combination of insufficient thickness lining and cavity around the surrounding rocks. Ultimately, specific maintenance work is design based on the construction deficiencies, and that is confirmed as an efficient, time-saving and safe maintenance method in the operational railway tunnel.