• 제목/요약/키워드: Maintenance Scheduling

검색결과 158건 처리시간 0.03초

고속철도차량의 유지보수계획 (Rolling Stock Maintenance Scheduling for High-Sneed Railway)

  • 김동희;홍순흠
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2003년도 춘계학술대회
    • /
    • pp.53-61
    • /
    • 2003
  • The process of railway traffic planning is composed of several steps such as long - term, mid - term, short - term, and real - time plan. The planning of vehicle and manpower resources is a main research topic in tactical short - term planning step Railway vehicle is usually consisted of a power car, passenger/freight cars and human resource is composed of engine driver, cabin crew, ground personnel. So far , power car was main research target in railway vehicle scheduling problem. Recently according as the light electric railway or high - speed railway is introduced, the operational planning of train set vehicles become important . In this paper , we introduce the conceptional model for trainset restoring problem and developed heuristic algorithm.

  • PDF

항공기 부품의 생산 및 정비를 위한 공정 계획 시스템의 개발 (Development of a CAPP System for Production and Maintenance of Aircraft Parts)

  • 노경윤;강수준
    • 한국군사과학기술학회지
    • /
    • 제2권2호
    • /
    • pp.83-91
    • /
    • 1999
  • Dynamic characteristic of manufacturing stage is understood and the utilization of each machine is maximized by developing on-line dynamic CAPP system to consider the overloads in the aircraft part manufacturing line. In this paper, a scheme of production planning and scheduling system was proposed through inspection about some predeveloped CAPP system. Developed production planning and scheduling system included process planning module. After precise inspection of some FMS line schema at domestic heavy industry, optimized FMS line was applied to aircraft part manufacturing and repairing factory. By virtue of considering overloads of factory and machine through on-line dynamic CAPP system, the utilization of resources is maximized and manufacturing lead time is minimized.

  • PDF

ILOG를 이용한 항공기 운항 일정계획 시스템 개발에 관한 연구 (A Study on Development of the Aircraft Scheduling System Using ILOG)

  • 윤종준;이장춘;이화기
    • 산업경영시스템학회지
    • /
    • 제24권65호
    • /
    • pp.89-102
    • /
    • 2001
  • In this paper, the aircraft route scheduling consists of two steps; the pairing generation and the aircraft assignment. The pairing generation is heuristic approach how flights construct pairings from and to the main base. The aircraft resource assignment which is to establish a aircraft route schedule is constructed by constraint satisfaction problem technique. ILOG solver and schedule is used to solve this problem. In addition, a aircraft route reschedule process against departure-arrival delay or aircraft maintenance schedule change is added by partial constraints satisfaction problem technique. Also, Gantt chart made by ILOG views is used to show aircraft route schedule results more easily.

  • PDF

전력시장의 발전기 보수계획을 고려한 확률적 발전 모델링 (Probabilistic Generation Modeling in Electricity Markets Considering Generator Maintenance Outage)

  • 김진호;박종배
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제54권8호
    • /
    • pp.418-428
    • /
    • 2005
  • In this paper, a new probabilistic generation modeling method which can address the characteristics of changed electricity industry is proposed. The major contribution of this paper can be captured in the development of a probabilistic generation modeling considering generator maintenance outage and in the classification of market demand into multiple demand clusters for the applications to electricity markets. Conventional forced outage rates of generators are conceptually combined with maintenance outage of generators and, consequently, effective outage rates of generators are newly defined in order to properly address the probabilistic characteristic of generation in electricity markets. Then, original market demands are classified into several distinct demand clusters, which are defined by the effective outage rates of generators and by the inherent characteristic of the original demand. We have found that generators have different effective outage rates values at each classified demand cluster, depending on the market situation. From this, therefore, it can be seen that electricity markets can also be classified into several groups which show similar patterns and that the fundamental characteristics of power systems can be more efficiently analyzed in electricity markets perspectives, for this classification can be widely applicable to other technical problems in power systems such as generation scheduling, power flow analysis, price forecasts, and so on.

Health Care Optimization by Maximizing the Air-Ambulance Operation Time

  • Melhim, Loai Kayed B.
    • International Journal of Computer Science & Network Security
    • /
    • 제22권2호
    • /
    • pp.357-361
    • /
    • 2022
  • Employing the available technologies and utilizing the advanced means to improve the level of health care provided to citizens in their various locations. Citizens have the right to get a proper health care services despite the location of their residency or the distance from the health care delivery centers, a goal that can be achieved by utilizing air ambulance systems. In such systems, aircrafts and their life spans are the essential component, the flight duration of the aircraft during its life span is determined by the maintenance schedule. This research, enhances the air ambulance systems by presenting a proposal that maximizes the aircraft flight duration during its life span. The enhancement will be reached by developing a set of algorithms that handles the aircraft maintenance problem. The objective of these algorithms is to minimize the maximum completion time of all maintenance tasks, thus increasing the aircraft operation time. Practical experiments performed to these algorithms showed the ability of these algorithms to achieve the desired goal. The developed algorithms will manage the maintenance scheduling problem to maximize the uptime of the air ambulance which can be achieved by maximizing the minimum life of spare parts. The developed algorithms showed good performance measures during experimental tests. The 3LSL algorithm showed a higher performance compared to other algorithms during all performed experiments.

개선된 수요 클러스터링 기법을 이용한 발전기 보수정지계획 모델링 (Modeling Planned Maintenance Outage of Generators Based on Advanced Demand Clustering Algorithms)

  • 김진호;박종배
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권4호
    • /
    • pp.172-178
    • /
    • 2006
  • In this paper, an advanced demand clustering algorithm which can explore the planned maintenance outage of generators in changed electricity industry is proposed. The major contribution of this paper can be captured in the development of the long-term estimates for the generation availability considering planned maintenance outage. Two conflicting viewpoints, one of which is reliability-focused and the other is economy-focused, are incorporated in the development of estimates of maintenance outage based on the advanced demand clustering algorithm. Based on the advanced clustering algorithm, in each demand cluster, conventional effective outage of generators which conceptually capture maintenance and forced outage of generators, are newly defined in order to properly address the characteristic of the planned maintenance outage in changed electricity markets. First, initial market demand is classified into multiple demand clusters, which are defined by the effective outage rates of generators and by the inherent characteristic of the initial demand. Then, based on the advanced demand clustering algorithm, the planned maintenance outages and corresponding effective outages of generators are reevaluated. Finally, the conventional demand clusters are newly classified in order to reflect the improved effective outages of generation markets. We have found that the revision of the demand clusters can change the number of the initial demand clusters, which cannot be captured in the conventional demand clustering process. Therefore, it can be seen that electricity market situations, which can also be classified into several groups which show similar patterns, can be more accurately clustered. From this the fundamental characteristics of power systems can be more efficiently analyzed, for this advanced classification can be widely applicable to other technical problems in power systems such as generation scheduling, power flow analysis, price forecasts, and so on.

공사 진척관리 현황분석을 통한 진척관리 개선방안에 관한 연구 (A Study on the Improvement through Analysis with Present Condition of Progress Management for Construction Project)

  • 박원호;심재광;윤석헌
    • 한국건축시공학회지
    • /
    • 제10권3호
    • /
    • pp.137-144
    • /
    • 2010
  • 건설 프로젝트가 대형 복잡화가 되어짐에 따라 프로젝트의 공정관리의 중요성이 대두되고 있다. 프로젝트 공정관리 기술은 한국에서 널리 사용되고 있지 않지만 점차적으로 증가하고 있는 추세다. 요즘 대부분의 연구 프로젝트들도 공정쪽에 초점을 두고 있다. 프로젝트 진척관리 또한 프로젝트 공정관리의 하나로써 매우 중요하다. 이에 본 연구에서는 국내 진척관리의 상태를 분석하기로 하며 진척관리의 현재 상태에 대해 전문가와 현장사람들에 대한 인터뷰를 진행하였다. 본 연구는 질적, 양적으로 프로젝트 진척분석을 위한 방법으로 BIM 기반의 진척관리를 제안하고 있다. 현재 BIM은 설계, 시공, 유지관리단계등에서 사용되고 있으며 또한 BIM을 이용한 진척관리는 프로젝트에 대해 이해하고 정확성을 키우는데 이바지 할 것이라고 생각된다.

위상배열 레이다 검출 및 추적 매개변수의 최적 스케쥴링 (Optimal Scheduling of Detection and Tracking Parameters in Phased Array Radars)

  • 정영헌;김현수;홍순목
    • 전자공학회논문지S
    • /
    • 제36S권7호
    • /
    • pp.50-61
    • /
    • 1999
  • 이 논문에서는 클러터 환경에서 항적 유지에 필요한 레이다 에너지를 최소하하기 위한 위상배열 레이디의 표적 검출 및 추적 매개변수 제어방법을 제시한다. 이를 위해 위상배열 레이다의 표적 탐색과정에서 비롯되는 표적 검출과정을 수학적 모델로 전개한다. 수학적 전개과정을 통해 표적 검출과정에서 발생하는 클리터나 측정 잡음에 의한 거짓 정보(false alarm)등과 같은 실제 표적이외의 측정을 고려한다. 추적필터 역시 클리터의 영향을 고려하기 위해 확률적 데이터 연관(Probabilistic Data Association: PDA)필터의 수정된 리카티 방정식의 근사식을 이용한다. 표적 탐색과정과 추적모델을 바탕으로, 최적의 매개변수 계획(scheduling)문제를 비선형 최적제어문제로 수식화하며, 최적제어문제의 해를 얻기 위해 제한조건을 가진 비선형 최적화 문제를 푼다.

  • PDF

목적함수별 발전기 최적보수계획 (Various Objective Functions Based Optimal GMS)

  • 이연찬;;오웅진;임진택;최재석
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.471-472
    • /
    • 2015
  • This paper proposes a generator maintenance scheduling (GMS) problem with due consideration of various objective functions. The objectives include leveling the reserve rate, maximizing reliability and minimizing production cost. The practicality and effectiveness of the proposed approach are demonstrated in the simulation for a real-size power system model in South Korea.

  • PDF

하이브리드 PSO 알고리즘을 이용한 발전기 보수 계획 (Generating Unit Maintenance Scheduling Considering Regional Reserves using Hybrid PSO Algorithm)

  • 박영수;김진호;박준호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2007년도 제38회 하계학술대회
    • /
    • pp.800-801
    • /
    • 2007
  • 본 연구는 지역별 전력수급을 고려한 발전기 보수 계획 수립에 관한 Hybrid Particle Swarm Optimization알고리즘(HPSO) 접근법을 제시하였다. 전체 계통의 예비력 확보에 초점이 맞춰진 기존의 연구에 지역별 예비력을 고려한 제약조건을 추가하였다. 본 연구의 목적함수로는 결정적 신뢰도 지수인 공급 예비율 분산값의 최소화(공급예비율 평활화)를 사용하였으며, IEEE RTS(1996) 계통에서의 사례연구를 수행하여 기존의 PSO알고리즘의 경우와의 비교분석을 통해 제안된 방법의 우수성을 보였다.

  • PDF