• Title/Summary/Keyword: Maintenance Performance

Search Result 3,019, Processing Time 0.027 seconds

A Study on the Performance Evaluation and the Improvement of the Quality Stand ard of Block Pavements (블록포장의 공용성 평가 및 품질기준개선 연구)

  • Jung, Jong-Suk;Park, Yong-Boo;Lee, Kyoung-Hee;Hwang, Chang-Kyu
    • International Journal of Highway Engineering
    • /
    • v.10 no.2
    • /
    • pp.115-124
    • /
    • 2008
  • This Study was investigated in main breakage types of 50 interlocking block pavements in apartment houses and evaluated on their performance. According to performance evaluation, maintenance control index of 9 aged interlocking block pavements ranged 7.9 to 8.9. These values meant that the condition of interlocking block pavements were still good. Therefore, it was concluded that the 10-year cycle of the block replacement recommended by Ministry of Construction & Transportation is necessary to reappraise. To objectively evaluate the performance of interlocking block pavements, this study presented the criteria of maintenance control by combining two maintenance control standards suggested by Ministry of Construction & Transportation and the Japan Interlocking Block Pavement Engineering Association. Also, this study suggested that the domestic standard is necessary to include durability standards and quality standards of joint filling materials and bedding sand layer for increasing expectation life and reducing maintenance costs of interlocking block pavements.

  • PDF

A Study on the Repair Method for Performance Degradation Cause of Korean Arch Bridge -Focused on the Seonamsa Seungseonggyo, Songgwangsa Geukrockgyo- (홍예교 성능저하 원인에 따른 보수방안 고찰 - 선암사 승선교·송광사 극락교를 중심으로 -)

  • Kim, Jeong-Eon;Cheon, Deuk-Youm
    • Journal of architectural history
    • /
    • v.23 no.1
    • /
    • pp.7-19
    • /
    • 2014
  • This study considers the proper repair techniques by examining the most representative repair cases of the Korean arch bridges and proposes the constructional manual which can apply similar occasions. The cases are Seonamsa Seungseongyo and Songgwangsa Geukrockgyo where this researcher had taken part in the repair works. This Study proposes the maintenance construction manual about the performance degradation drew by performance degradation of the both Korean arch bridges in the maintenance process. First, arch bridge maintenance should be carried out in the dry season, when water is impermeable in the bottom surface of the bridge. Moreover, risk factors of the maintenance should be excluded to secure the water vally flow, the bypass and the temporary bridge. Second, prior to repair, it has to precede (1)3D shooting (2)formal examination (3)structure safety test (4)geological and lithic surveys (5)arch curvature establishment and makeshift frame settlement before transformation (6)relationship expert comments. Third, if the baduk and the foundation stones are inevitable to replace due to performance degradation on the foundation, it should use the high quality stones and secure greater stress by extending the standard range. The foundation on irregular rock needs to be flattened and underside on the replaced materials require Grengyijil to deliver the equal loads. Fourth, In the process of dismantling the stones of the arched bridge, it could make heavy weathering degree and not reuse the materials. Charge should converge the expert advices to choose the reuseable, the conservate and the alternative materials, and increase the reutilization of the raw materials by preservation and reinforcement treatments. Fifth, the side wall should be repaired by the rubble work technique which is not able to pile compost satiety, so it must use long depth of masonary stones for reinforcement. It is considered to reinforce the stone wall in shore as much as possible and protect the abutment and the side wall on the upstream for the arch bridge maintenance works.

Proactive Maintenance Framework of Manufacturing Equipment through Performance-based Reliability

  • Kim, Yon-Soo;Chung, Young-Bae
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.22 no.53
    • /
    • pp.45-54
    • /
    • 1999
  • Manufacturing today is becoming increasingly competitive. If a company is to exist and successfully compete, it must pay very careful attention to production management, total quality assurance and total proactive maintenance issues. Overall machine performance, repair efficiency, system level utilization, productivity and quality of output need to be optimized as possible. To accomplish that objective, the behavior of manufacturing equipment and systems need to be monitored and measured continuously if it is possible. Then early warning of possible failure should be generated and proacted on that type of the situation to improve overall operation performance of manufacturing environment. In this paper, Proactive maintenance framework using performance-based reliability structure as enabler technology is proposed. Its paradigm enables one to maximize system through-put and product quality as well as resources in the performance domain. In the case of inadequate knowledge of the failure mechanics, this empirical modeling concept along with performance degradation knowledge can serve as an important product and process improvement tool. The real-time framework extension to proposed framework uses on-line performance information and is capable of projecting the remaining useful period.

  • PDF

The Impact of TPM Activities on the Business Performance of Small and Medium Sized Enterprises (TPM활동이 중소기업의 경영성과에 미치는 영향)

  • Lee, Jae-Sik
    • Management & Information Systems Review
    • /
    • v.30 no.4
    • /
    • pp.415-440
    • /
    • 2011
  • Purposes of this paper are to find out the implementation strategy of TPM activities for SMEs through the analysis which examine the relationship between key activity factors and business performance. TPM activity has been playing a important role to strengthen the competitive power of the enterprises through the optimization of equipment management and maintenance. This study has been conducted using the data collected from 124 SMEs propelling TPM activity. By analyses of the questionnaires, empirical results shows that TPM activities has positive effect on business performance. The contribution of this study is that it provides a conceptual framework and empirical evidence of the causal relationship between key activity factors and business performance. The result of this study can be used for selection of the performance measurement indicators for target achievement in TPM activity. And it will contribute for objectivity of activity performance in case of displaying measurement indicator showing the performance of TPM activity.

  • PDF

Determination of Resetting Time to the Process Mean Shift with Failure (고장을 고려한 공정평균 이동에 대한 조정시기 결정)

  • Lee, Do-Kyung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.42 no.4
    • /
    • pp.145-152
    • /
    • 2019
  • All machines deteriorate in performance over time. The phenomenon that causes such performance degradation is called deterioration. Due to the deterioration, the process mean of the machine shifts, process variance increases due to the expansion of separate interval, and the failure rate of the machine increases. The maintenance model is a matter of determining the timing of preventive maintenance that minimizes the total cost per wear between the relation to the increasing production cost and the decreasing maintenance cost. The essential requirement of this model is that the preventive maintenance cost is less than the failure maintenance cost. In the process mean shift model, determining the resetting timing due to increasing production costs is the same as the maintenance model. In determining the timing of machine adjustments, there are two differences between the models. First, the process mean shift model excludes failure from the model. This model is limited to the period during the operation of the machine. Second, in the maintenance model, the production cost is set as a general function of the operating time. But in the process mean shift model, the production cost is set as a probability functions associated with the product. In the production system, the maintenance cost of the equipment and the production cost due to the non-confirming items and the quality loss cost are always occurring simultaneously. So it is reasonable that the failure and process mean shift should be dealt with at the same time in determining the maintenance time. This study proposes a model that integrates both of them. In order to reflect the actual production system more accurately, this integrated model includes the items of process variance function and the loss function according to wear level.

Development of National Competency Standards for Automotive Maintenance (자동차정비직무를 위한 국가직무능력표준(NCS) 개발)

  • Jie, Myoung-Seok;Noh, Hi-Kui;Han, Young-Min
    • Transactions of the KSME C: Technology and Education
    • /
    • v.2 no.2
    • /
    • pp.81-87
    • /
    • 2014
  • Automotive field specialist developed National Competency Standards for Automotive Maintenance to apply for the education and evaluation of automotive maintenance. National Competency Standards scope and system for Automotive Maintenance has been developed and provided Performance Criterion, knowledge, skill, attitude, and evaluation methods for each item. Also it has provided vocational basic knowledge level and qualification frame for automotive maintenance.

A Study on the Equipment Maintenance Management Support System for Production Efficiency (생산효율화를 위한 설비보전관리 지원시스템에 관한 연구 -설비보전정보시스템을 중심으로-)

  • 송원섭
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.21 no.48
    • /
    • pp.279-289
    • /
    • 1998
  • This study deals with the schemes of design, plan and operate maintenance management support systems and with the engineering approach for the solutions to build the maintenance management for the production efficiency. Maintenance Management Information System(MMIS) is the task that must focus on machinery historical data and planned maintenance action. Also the efficient supporting system in a maintenance management is achieved by database which is based on process of machinery's failure history. Designing method of maintenance management information system, maintenance modules are consisted of six factors ; machinery's historical data, lubrication control, check sheet, repair work, availability report, and performance report(control board and detailed reports), and then operators can rapidly utilize data in work place. In the implementation of designed model, program coding has been developed by Visual Basic 3.0. Data insertion, deletion and updating which perform menu screen is implemented by reading data from database. Implementation model based on LAN environment and related data is stored in Microsoft DBMS.

  • PDF

Comparison of AMO System between Korea and US (우리나라와 미국의 승인된 정비조직 제도 비교)

  • Joe, Hyunmyung
    • Journal of Aerospace System Engineering
    • /
    • v.10 no.2
    • /
    • pp.27-33
    • /
    • 2016
  • For the continued airworthiness of aviation products, aviation authority requires that every manufacturer should provide ICA(Instruction of Continued Airworthiness) to their users, and the users should follow it by themselves or using another approved maintenance agent. To reduce the cost and improve performance quality of maintenance activities, lots of users tries to outsource this job. To perform maintenance or repair of other owned air products, an air carrier and aviation maintenance companies should obtain AMO(approval of maintenance organization). It means AMO is a postulation to enter MRO(Maintenance Repair and Overhaul) market. For that, this paper discusses the comparison of requirements and procedures of AMO system between Korea and US to help understand the AMO system, and then, tries to point out what improvement should be made to Korean AMO system to be more effective, efficient and safe.

Stochastic analysis of a non-identical two-unit parallel system with common-cause failure, critical human error, non-critical human error, preventive maintenance and two type of repair

  • El-Sherbeny, M.S.
    • International Journal of Reliability and Applications
    • /
    • v.11 no.2
    • /
    • pp.123-138
    • /
    • 2010
  • This paper investigates a mathematical model of a system composed of two non-identical unit parallel system with common-cause failure, critical human error, non-critical human error, preventive maintenance and two type of repair, i.e. cheaper and costlier. This system goes for preventive maintenance at random epochs. We assume that the failure, repair and maintenance times are independent random variables. The failure rates, repair rates and preventive maintenance rate are constant for each unit. The system is analyzed by using the graphical evaluation and review technique (GERT) to obtain various related measures and we study the effect of the preventive maintenance preventive maintenance on the system performance. Certain important results have been derived as special cases. The plots for the mean time to system failure and the steady-state availability A(${\infty}$) of the system are drawn for different parametric values.

  • PDF

Analysis for the Problem and Improvement of Maintenance Monitoring in Subway Tunnel (지하철 터널에서 유지관리계측의 문제점 분석 및 개선방안)

  • Woo, Jong-Tae;Kim, Jong-Soo;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.5 no.4
    • /
    • pp.161-167
    • /
    • 2001
  • By means of analyzing the problems in monitoring plan, design, installation, operation based on maintenance monitoring system installed in subway tunnel section, the improved methods of were proposed for applying to subway monitoring maintenance effectively in the future. The choice of the better monitoring system, the operating method of monitoring system, the confidence and continuity of maintenance monitoring, the performance of responsible monitoring supervision in the phase of the planning of monitoring and design were proposed. The problem and developed plan in the different monitoring systems, the calibration and correction of monitoring system, the analysis for the results and plan for maintenance in the phase of installation of monitoring system and operation were also proposed.

  • PDF