• Title/Summary/Keyword: Maintenance Model

Search Result 2,629, Processing Time 0.029 seconds

A Cost Analysis Model of Minimal-Repairable Items in Free Replacement under the Periodic Maintenance Policy (정기보전제도에서 응급수리제품에 대한 무상수리 적용의 비용분석 모델)

  • 김재중;김원중;조남호
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.19 no.39
    • /
    • pp.89-98
    • /
    • 1996
  • This paper is concerned with cost analysis model in free -replacement policy under the periodic maintenance policy The free-replacement policy with minimal repairable item is considered as follows; in a manufacturer's view point operating unit is periodically replaced, if a failure occurs between minimal repair and periodic maintenance time, unit is remained in a failure condition. Also unit undergoes minimal repair at failures in minimal-repair interval. Then total expected cost per unit time is calculated according to maintenance period Tin a viewpoint of consumer's. The expected costs are included repair cost and usage cost: operating, fixed, minimal repair and loss cost. Numerical example is shown in which failure time of item has beta distribution.

  • PDF

A study on generator maintenance scheduling of system operator in competitive electricity markets (경쟁적 전력시장에서 계통운용자의 발전기 예방정비계획에 관한 연구)

  • Han, Seok-Man;Shin, Young-Kyun;Kim, Bal-Ho H.;Park, Jong-Bae;Cha, Jun-Min
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.447-449
    • /
    • 2003
  • In competitive electricity markets, maintenance schedule is submitted by Genco's and Transco's, and coordinated by ISO with the adequacy criterion. This paper presents an alternative coordination procedure by ISO on the maintenance schedule.

  • PDF

Application of Blockchain Technology to Verify Reliability of Life Cycle BIM Model for Civil Engineering Project (블록체인기술을 활용한 토목공사 생애주기 BIM 모델의 신뢰성 확보 방안)

  • Lee, Jaehee;Moon, Hyounseok;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.116-124
    • /
    • 2021
  • As the utilization of the BIM model increases in the design and construction stages of a construction project, the utilization of BIM in the maintenance stage can also increase. In the maintenance stage, BIM objects created in the design and construction stages that have already been completed are used. Therefore, it is necessary to verify the reliability of whether the used BIM object is a certified model created in the design stage. In particular, the reliability of the BIM model becomes more important in a project such as railway facilities composed of various construction activities with civil engineering, architecture, electricity, signal, and track work. This study proposes a methodology of using blockchain technology as a way to secure the reliability of the BIM model used in the maintenance phase, and constructs the block structure and detailed process for applying the blockchain technology to BIM. In addition, by applying this process to the BIM model of an actual facility to generate a block, it was confirmed that the blockchain technology can be used as a tool to secure the reliability of the BIM model.

Preventive Maintenance Scheduling Guide

  • Park, Kyung-S.
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.1 no.1
    • /
    • pp.93-98
    • /
    • 1975
  • This paper presents a generalized model for determining minimum cost preventive maintenance schedules where accurate failure data are not available except the "average"(mean) and the "typical" value(mode) of the component lifetime.

  • PDF

A Study on the Improvement for EMU Maintenance System of Urban Transit (도시철도 전동차 유지보수체계의 개선에 관한 연구)

  • Kim, Kyu-Joong;Lee, Keun-Oh
    • Journal of the Korean Society of Safety
    • /
    • v.25 no.1
    • /
    • pp.87-92
    • /
    • 2010
  • Urban transit system must secure fast, safe and reliable transportation capacity as a metropolitan mass transit. For this purpose, it is important to make all the sub-systems (which consist of EMU, power feeding, signaling & telecommunication, railway, platform facility, and control system and so on) work well. To operate all the systems effectively and reliably, a maintenance measure optimal to each system's characteristics is needed to be established and executed. So, highly reliable maintenance should be performed. But, EMU maintenance methods suitable to its own model and EMU lines are not yet introduced. This study examined few examples mainly to secure reliability on a maintenance quality in operating method and the features of train maintenance system based on travel distance.

Simulation Analysis of the Train Overhaul Maintenance Capacity for Rolling Stock Depot (열차 차량기지의 중정비 검수 용량 시뮬레이션 분석)

  • Jeon, Byoung-Hack;Lee, Won-Young;Jang, Seong-Young;Yoo, Jae-Kyun
    • Proceedings of the KSR Conference
    • /
    • 2007.05a
    • /
    • pp.1481-1498
    • /
    • 2007
  • As railroad industry face the new Renaissance era, effective and efficient maintenance methods for rolling stock operation are required with advanced railroad technology. All kinds of railroad systems such as high speed long distance train, metropolitan mass transit and light rail require systematic maintenance technology in order to maintain the safe railroad operation. Simulation models for detailed operations of the sample maintenance center are developed. In this study, standard maintenance procedures, layout, equipments and number of workers of Siheung Metropolitan Railroad Maintenance Rolling Stock Depot are considered. The proposed simulation models are developed using simulation package ARENA. Three simulation analysis using the developed simulation model are done. First, the bottleneck operation is identified. Second, the relationship between maintenance center size, number of workers and cycle time is analyzed. Lastly, the scheduling performances between PERT/CPM and Critical Chain Project Management(CCPM) are compared.

  • PDF

A Study on the Information System Maintenance Activities and Performance

  • Lee, Young-Joo;Choi, Young-Jin
    • Journal of the Korea Society of Computer and Information
    • /
    • v.20 no.12
    • /
    • pp.175-180
    • /
    • 2015
  • It is important to maintain information system (IS) following the business and institutional change. Even if successfully developed information systems, we cannot gain the benefit from the systems without the proactive maintenance activities. However, the importance of IS maintenance has not been considered as much as the system development, and we don't have any specific performance management structure. The objective of this study is to identify the relationship between IS maintenance activities and utilization. For empirical test of the hypothesis model, the sample data is collected from public information system sites. Results from multiple regression analysis reveal that proactive maintenance activities including IS maintenance cost increase, improving functionality, and enhancing ease of use have a causal effect on the IS utilization.

주기적 예방보전의 최적정책에 관한 연구

  • Na Myeong Hwan;Son Yeong Suk;Kim Mun Ju
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2005.06a
    • /
    • pp.115-120
    • /
    • 2005
  • This paper introduces models for preventive maintenance policies and considers periodic preventive maintenance policy with minimal repair when the failure of system occurs. It is assumed that minimal repairs do not change the failure rate of the system. The failure rate under prevention maintenance received an effect by a previously prevention maintenance and the slope of failure rate increases the model where it considered. Also the start point of failure rate under prevention maintenance considers the degradation of system and that it increases quotient, it assumed. Per unit time it bought an expectation cost from under this prevention maintenance policy. We obtain the optimal period time and the number for the periodic preventive maintenance by using Nakagawa's Algorithm, which minimizes the expected cost rate per unit time. Finally, it suppose that the failure time of a system has a Weibull distribution as an example and we obtain an expected cost rate per unit time the optimal period time and the number when cost of replacement and cost of minimal repair change.

  • PDF

Performance Analysis of Urban Railway Rolling Stock Condition-based Maintenance Process Redesign Applying Mobile-IoT (모바일 사물인터넷을 적용한 도시철도 차량 상태기반 유지보수 프로세스 재 설계안 성과 분석)

  • Hyun-Soo Han;Kyoung-Soo Seo;Tae-Wook Kang
    • Journal of Information Technology Applications and Management
    • /
    • v.29 no.6
    • /
    • pp.63-80
    • /
    • 2022
  • In this paper, we study structural changes and performance gains in condition-based maintenance process redesign when mobile IoT technology is embedded into urban railway rolling stock. We first develop condition-based maintenance To-Be process model in accordance with the IoT deployment scheme. Secondly, we draw upon theoretical framework of redesign process analysis to develop performance evaluation method suitable to predictive maintenance shift from As-Is ordinary maintenance practice. Subsequently, To-Be process performance evaluations are conducted adopting both the quantitative and qualitative method for time, cost, and dependability dimensions. The results ascertain the considerable benefits captured through detection abnormality prior to actual rolling stock failure occurrence, and details of performance improvements and enhancement of standardization level is revealed. The procedures and results presented in this paper offers useful insights in the fields of IoT economic analysis, condition based maintenance, and business process redesign.