• Title/Summary/Keyword: Maintenance Model

Search Result 2,599, Processing Time 0.035 seconds

Methodologies of Duty Cycle Application in Weapon System Reliability Prediction (무기체계 신뢰도 예측시 임무주기 적용 방안에 대한 연구)

  • Yun, Hui-Sung;Jeong, Da-Un;Lee, Eun-Hak;Kang, Tae-Won;Lee, Seung-Hun;Hur, Man-Og
    • Journal of Applied Reliability
    • /
    • v.11 no.4
    • /
    • pp.433-445
    • /
    • 2011
  • Duty cycle is determined as the ratio of operating time to total time. Duty cycle in reliability prediction is one of the significant factors to be considered. In duty cycle application, non-operating time failure rate has been easily ignored even though the failure rate in non-operating period has not been proved to be small enough. Ignorance of non-operating time failure rate can result in over-estimated system reliability calculation. Furthermore, utilization of duty cycle in reliability prediction has not been evaluated in its effectiveness. In order to address these problems, two reliability models, such as MIL-HDBK-217F and RIAC-HDBK-217Plus, were used to analyze non-operating time failure rate. This research has proved that applying duty cycle in 217F model is not reasonable by the quantitative comparison and analysis.

A study on Determining Maintenance Intervals Considering the Maintenance Effect for the PDS in Metro EMU (전동차 승객용도어시스템의 유지보수 효과를 고려한 유지보수 주기 산정에 관한 연구)

  • Lee, Duk-Gyu;Son, Young-Jin;Lee, Hi-Sung
    • Journal of the Korean Society for Railway
    • /
    • v.14 no.3
    • /
    • pp.216-221
    • /
    • 2011
  • An important problem in reliability analysis for repairable systems is to model the maintenance effect. The most of researches have assumed two extreme cases; one is perfect maintenance and the other is minimal maintenance. However, many of maintenances performed by domestic subway operators are imperfect maintenances which have the effect between both of two extreme cases. This article deals with the problem determining the imperfect preventive maintenance intervals based on failure data in units of the PDS(passenger door system) in Metro EMU. This paper deals with a case study on determining imperfect maintenance interval by using the level of maintenance effect through reliability analysis of PDS.

Conceptual Simulation Model for Evaluating Availability of Railway System (철도 시스템 가용성능 시뮬레이션 개념 모형)

  • Kim, Jong-Woon;Kim, Hee-Wook;Ohn, Jung-Ghun;Kwon, Tae-Soo;Jeong, Do-Sik
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1241-1245
    • /
    • 2011
  • High RAM performance and efficient operation plan and maintenance equipment and policies are needed for improving the system availability performance such as punctuality and schedule adherence while reducing life cycle cost. Because railway systems are repairable, complex and have multi-echelon maintenance support structure, it is much complicated to set RAM performance targets and operation and maintenance plan. It is not easy to solve these problem by mathematical method and simulation can be consider for them. This article suggests the conceptual simulation model for analysing availability of railway system which has complex system structure and operation/maintenance environment.

  • PDF

Development of Maintenance Effectiveness Monitoring Program based on Design Characteristics for New Nuclear Power Plant (신규원전의 설계특성 기반 정비효과성감시 프로그램 개발)

  • Yeom, Dong-Un;Hyun, Jin-Woo;Song, Tae-Young
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.8 no.1
    • /
    • pp.25-32
    • /
    • 2012
  • Korea Hydro & Nuclear Power Co. (KHNP) has developed and implemented the maintenance effectiveness monitoring (MR) programs for the operating nuclear power plants. The MR program is developed by reflecting design characteristics of the operating nuclear power plants to monitor the plant performance for improving the safety and reliability. Recently, KHNP has built a new nuclear power plant, and developed the MR program to establish the advanced maintenance system by reflecting unique design characteristics based on the OPR1000 standard model. So, the MR program developed in this study has another characteristics in comparison with the OPR1000 standard model, and we will verify the suitability of the MR program through evaluating initial performance of the plant. The safety and reliability of the new plant will be improved by developing and implementing the MR program.

Life Cycle Cost Model for the Acquisition of Rolling Stocks (철도차량 획득단계에 적용되는 수명주기비용 모형에 관한 연구)

  • Kim, Jong-Woon;Chung, Kwang-Woo;Chung, Jong-Duk;Han, Seok-Yun
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.198-205
    • /
    • 2009
  • It is known that the operation and maintenance cost is generally higher than the acquisition cost of rolling stocks. It is very important for reducing the operation and maintenance cost to acquire the rolling stocks which are well designed with regard to the operation and maintenance cost. Therefore life cycle cost including the operation and maintenance cost is needed to be considered from the acquisition phase. This article presents a procedure and a model for life cycle cost which are applicable to the acquisition of rolling stocks.

  • PDF

The Optimal Inventory Level of the Maintenance Float to Achieve a Target Operational Availability of Korean-Made Helicopter (한국형 헬기의 목표 운용가용도 달성을 위한 정비대충장비 최적 재고수준 결정)

  • Lee, Sang-Jin;Kim, Seong-Won
    • Korean Management Science Review
    • /
    • v.24 no.2
    • /
    • pp.81-93
    • /
    • 2007
  • Achieving a target operational availability is more economical and efficient than having many quantities of the weapon system, since the cost of weapon system becomes expensive. The intent of this study is twofold; first, we develop the simulation model to determine the optimal inventory level of the maintenance float while achieving a target operational availability of the Korean-made helicopter. The quantity decision model considers following factors such as a reliability. a turn around time(TAT). a protection level for inventory, and so on. Second, we analyze whether the existence of a lateral transshipment among bases and the reduction of TAT relate to an inventory level and the operational availability. The research result shows that both TAT and lateral transshipment have an effect on reducing the inventory level of the maintenance float and improving an operational availability.

Cost Models for Warranty and Preventive Maintenance

  • Kim, Che-Soong
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.7 no.1
    • /
    • pp.66-74
    • /
    • 2002
  • Warranty cost analysis for one-dimensional warranties assumes that the usage intensity (or rate) is the same for all buyers. In real life the usage intensity varies across the population of buyers. Also for products sold with warranty, preventive maintenance actions by manufacturers and buyers have a significant impact on the total costs for both parties. In this paper we deals with models to study the expected warranty cost for products with free repairable warranty with varying usage intensity and three types of preventive maintenance. We also review the literature which links warranty and maintenance and develops a framework to define new topics for research in the future and examines a new model formulation. It then develops a new model and carries out its analysis.

  • PDF

Multi-Devices Composition and Maintenance Mechanism in Mobile Social Network

  • Li, Wenjing;Ding, Yifan;Guo, Shaoyong;Qiu, Xuesong
    • Journal of Communications and Networks
    • /
    • v.17 no.2
    • /
    • pp.110-117
    • /
    • 2015
  • In mobile social network, it is a critical challenge to select an optimal set of devices to supply high quality service constantly under dynamic network topology and the limit of device capacity in mobile ad-hoc network (MANET). In this paper, a multi-devices composition and maintenance problem is proposed with ubiquitous service model and network model. In addition, a multi-devices composition and maintenance approach with dynamic planning is proposed to deal with this problem, consisting of service discovery, service composition, service monitor and service recover. At last, the simulation is implemented with OPNET and MATLAB and the result shows this mechanism is better applied to support complex ubiquitous service.

A Cost Analysis Model of Minimal-Repairable Items in Free Replacement under the Periodic Maintenance Policy (정기보전제도에서 응급수리제품에 대한 무상수리 적용의 비용분석 모델)

  • 김재중;김원중;조남호
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.19 no.39
    • /
    • pp.89-98
    • /
    • 1996
  • This paper is concerned with cost analysis model in free -replacement policy under the periodic maintenance policy The free-replacement policy with minimal repairable item is considered as follows; in a manufacturer's view point operating unit is periodically replaced, if a failure occurs between minimal repair and periodic maintenance time, unit is remained in a failure condition. Also unit undergoes minimal repair at failures in minimal-repair interval. Then total expected cost per unit time is calculated according to maintenance period Tin a viewpoint of consumer's. The expected costs are included repair cost and usage cost: operating, fixed, minimal repair and loss cost. Numerical example is shown in which failure time of item has beta distribution.

  • PDF

A study on generator maintenance scheduling of system operator in competitive electricity markets (경쟁적 전력시장에서 계통운용자의 발전기 예방정비계획에 관한 연구)

  • Han, Seok-Man;Shin, Young-Kyun;Kim, Bal-Ho H.;Park, Jong-Bae;Cha, Jun-Min
    • Proceedings of the KIEE Conference
    • /
    • 2003.11a
    • /
    • pp.447-449
    • /
    • 2003
  • In competitive electricity markets, maintenance schedule is submitted by Genco's and Transco's, and coordinated by ISO with the adequacy criterion. This paper presents an alternative coordination procedure by ISO on the maintenance schedule.

  • PDF