• Title/Summary/Keyword: Maintenance Consideration

Search Result 453, Processing Time 0.033 seconds

Maintenance Limit Renewal Policy for Inferiority System based on Opportunity Cost (기회비용을 고려한 열화시스템의 보전한계갱신정책)

  • 박상민;김연수
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.17 no.32
    • /
    • pp.233-242
    • /
    • 1994
  • This study deals with the derivative adverse minimum for inferiority system depends on continuose operating under infinite planning horizon. This planning will be accomplished by maintenance limit renewal policy in consideration of opportunity cost which affects system by failure during operation periods and expected cost under nomal operation states. By the results, we will be expected incresing total efficiency for the system by optimal renewal policy.

  • PDF

FEG Development of MCR HVAC System for NPP (원자력발전소 주제어실 공기조화계통 기능적설비그룹 개발)

  • Hyun, Jin Woo
    • Transactions of the Korean Society of Pressure Vessels and Piping
    • /
    • v.8 no.2
    • /
    • pp.21-25
    • /
    • 2012
  • Functional Equipment Group(FEG) of Nuclear Power Plant(NPP) is the bundling of multiple equipment subcomponents around a major equipment with a common system isolation characteristic or out-of-service consideration. The main purpose of FEG is to reduce out-of-service time to enhance maintenance effectiveness. KHNP(Korea hydro & Nuclear Power Co.) needs to develop these FEGs to successfully perform On-line Maintenance(OLM) which will be expected to institute in the future. Recently, there has been growing interest in OLM in KHNP. The aim of this paper is to suggest the way of FEG development and to build the FEG of MCR(Main Control Room) HVAC(Heat, Ventilation and Air Conditioning) system. The results of this study might be make good use of OLM and be helpful for equipment maintenance for MCR HVAC system.

A Research of Data Gathering Middleware and User Friendly Display for vessel PMS(Planned Maintenance System) (선박 PMS를 위한 데이터 수집 미들웨어와 사용자 편의적 디스플레이연구)

  • Lee, Seojeong
    • Journal of Information Technology Services
    • /
    • v.12 no.2
    • /
    • pp.335-348
    • /
    • 2013
  • Vessel PMS (Planned Maintenance System) is a paper and/or software based system to monitor vessel engine equipment including main propulsion, steering, auxiliary machinery and cargo handling information. This is one of mandatory survey for vessel introduced by IMO (International Maritime Organization). The planned maintenance as well as documentation must be performed according to a system to be approved by classification agencies. Recently, vessel owners have preferred software based systems to collect and preserve accurate data. However, not ship specific and not taking into account the user are said by end users as operational difficulties. To relieve these concerns, this research analyzes vessel PMS data, suggests a middleware to support automatic collection and design consideration of user interface.

Investigation of Recent Maintenance and Management in Existing Railway Bridges for Development of Urban Maglev Track Structures Inspection Manual (도시형 자기부상철도 토목구조물 유지관리 지침 작성을 위한 국내 철도교 유지관리 현황 분석)

  • Lee, Gi-Yeol;Yang, Tae-Sock;Chung, Won-Yong
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.107-111
    • /
    • 2008
  • This paper presented a literature review and investigation analysis results of total 19 present guide book and provisions of maintenance and management system in existing railway bridges to development of urban maglev track structures inspection manual. This research carried out a cooperated research subject 3-1, development a design code and maintenance and management inspection manual for urban maglev track structures, of the Center for Urban Maglev Program. Three types of track structures were includes as a major analytical parameter together with railroad, high speed railroad, subway and light rail transit. Bridges were analyzed a general rules, investigation, evaluation, repair and strengthen method as a key aspect. And rail were analyzed examination and maintenance also. This analysis results show that the track structures evaluation are based on the test and examination results, and repaired or strengthened consideration of deterioration, track irregularity and materials according to provision requirements.

  • PDF

Critical Criteria Based on Facility Condition Index for Supporting Priority Decision-making in Educational Facilities

  • Shin, Seung Woo;Yi, June Seong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.687-688
    • /
    • 2015
  • The objective of identifying the cause of inconsistency in determining priority of educational facility maintenance, any related factors were thoroughly identified and tested, to see if it has any effect on decision-making process in resource allocation for educational facilities. On the assumption that 'the more there are to be repaired/maintained and deferred, the higher the relevant cost will be, this will lead to a significant social loss. Accordingly, this study established a framework of determining resource allocation priority based on deferred maintenance and its related expenses. For doing so, it was required to determine relative ranking in terms of resource allocation within a pre-assigned school district, in consideration of the criticality of each deferred maintenance attribute/variable.

  • PDF

Comparative Cost Analysis of Repair Method according to Bridge Superstructure Type (교량 상부구조 형식에 따른 보수공법 비용 비교분석)

  • Lee, Changjun;Park, Taeil
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.277-278
    • /
    • 2023
  • The need for maintenance of bridge infrastructure is increasing due to aging, and the cost of maintaining the infrastructure must be calculated for effective budget distribution. Therefore, in this study, representative defects according to bridge superstructure type are derived to calculate the cost for each repair method. First of all, the representative bridges, PSCI girder bridge, Rahmen bridge, Steel box girder bridge, and RC slab bridge, were selected as superstructures using BMS data, and repair methods for defects were presented. In addition, the cost of the repair method by superstructure type was compared. This result is expected to predict total maintenance costs in consideration of the maintenance cycle.

  • PDF

Current Situation of Employment and Factors Affecting the Job Maintenance of Women with Disabilities (여성장애인의 고용현황 및 직업유지에 영향을 미치는 요인)

  • Kim, Se-Yun;Ku, In-Soon;Park, Ja-Kyung
    • The Journal of the Korea Contents Association
    • /
    • v.12 no.8
    • /
    • pp.318-329
    • /
    • 2012
  • The purpose of this study was to investigate current situation of employment and factors affecting the job maintenance of women with disabilities. The second Panel Survey of Employment for the Disabled(PSED) and the third PSED are used to investigate current situation of employment and factors affecting the job maintenance of women with disabilities. We analysed whether women with disability who were employed in the second PSED maintain employment in the third PSED. The results showed that women with disabilities had lower wages(p<.001) and higher non-regular work(p<.001) than men with disabilities. Also, women with disabilities experienced more consideration of job(p<.05) and working time(p<.001) than men with disabilities. The job stability among job satisfactions of women with disabilities was higher than men with disabilities. The factors affecting the job maintenance of women with disabilities were health status(p<.05), wages(p<.05), consideration of job(p<.05).This study suggested that the health status, wages, consideration of job were needed to consider when establishing employment policy for women with disabilities.

Visualization and Analysis of Remote Operation involved in Advanced Conditioning Process

  • Yoon, Ji-Sup;Kim, Sung-Hyun;Song, Tai-Gil
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2004.02a
    • /
    • pp.205-219
    • /
    • 2004
  • The remote operation of the Advanced Spent Fuel Conditioning Process (ACP) is analyzed by using the 3D graphic simulation tools. The ACP equipment operates in intense radiation fields as well as in a high temperature. Thus, the equipment should be designed in consideration of the remote handling and maintenance. As well as suitable remote handling and maintenance technology needs to be developed along with the design of the process concepts. To develop such remote operation technology, we developed the graphic simulator which provides the capability of verifying the remote operability of the ACP without fabrication of the process equipment. In other words, by applying virtual reality to the remote maintenance operation, a remote operation task can be simulated in the graphic simulator, not in the real environment. The graphic simulator will substantially reduce the cost of the development of the remote handling and maintenance procedure as well as the process equipment, while at the same time developing a remote maintenance concept that is more reliable, easier to implement, and easier to understand.

  • PDF

The consideration of the electronic cooling device for outside panel (옥외 자립형 PANEL에 적용한 전자냉각장치 고찰)

  • Ok, Yeon-Ho;Lim, Jae-Il;Park, Ji-Kun;Kwak, Won-Ku;Lee, Jae-Heung;Kim, Byung-Ki
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.353-354
    • /
    • 2008
  • 옥외 현장에 설치되어 있는 PANEL은 하절기에 내부 온도가 높아져 PANEL 내부에 설치되어 있는 제어장치의 정상 동작을 방해 할 수 있다. 실제로 하절기 오후 $2{\sim}3$시경 PANEL 내부의 온도는 약 $60{\sim}75^{\circ}C$ 정도의 고온을 유지한다. 근래에는 현장 PANEL 내부에 PLC 및 컨트롤러등 전자화된 제어 장치의 설치 비중이 증가하고 있고 대부분의 컨트롤러 사용 온도는 약 $0{\sim}55^{\circ}C$ 이므로 하절기 고온 상태에서 정상적인 동작을 기대하기는 어렵다. 본 논문에서는 옥외 자립형 PANEL의 냉각 장치를 개발하여 운영하고 그 효과를 분석, 검토함으로써 하절기 고온 상태에서도 안정적으로 설비가 정상 동작하기 위한 방안 제시를 주요 목적으로 한다.

  • PDF

A Study on the Life Cycle Cost Calculation of the Railroad Vehicle Based on the Maintenance Information (철도차량 유지보수정보를 이용한 수명주기비용 계산 연구)

  • Kim, Jae-Hoon;Jun, Hyun-Kyu;Park, Jun-Seo;Jeong, Hyun-Yong
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.1
    • /
    • pp.88-94
    • /
    • 2009
  • Life cycle costing is one of the most effective approaches for the cost analysis of long-life products such as the railroad vehicle. Life cycle costing includes the cost of concept design, development, manufacture, operation, maintenance and disposal. Especially, life cycle costing in the railroad industry has been focused on the maintenance cost. In this paper, the standard, guide and maintenance information of railroad vehicle were investigated, and the unique corrective and preventive maintenance templates of railroad vehicle were proposed. Maintenance cost of an auxiliary power supply system of EMU was predicted by using the proposed templates. The results show that the preventive maintenance, PM, cost is much higher compare to corrective maintenance, CM, cost because of daily and monthly maintenance tasks which require lots of labor work. It is expected that these templates can help railroad operators make maintenance strategies with consideration of the cost parameter.