실습선 새바다호의 선체진동에 관하여 (On the Hull Vibration of the Training Ship Sae-Ba-Da)

  • 박중희
    • 수산해양기술연구
    • /
    • 제22권3호
    • /
    • pp.23-28
    • /
    • 1986
  • This paper describes on the measurement of the deck vibration produced by the main engine vibration of stern trawler MjS SAE-BA-DA (2,275GT, 3,600PS) while the ship is cruising and drifting. The obtained results are as follows; 1. The deck vibration level was the highest point at vertical line which pass main engine and the lowest point at vertical line which pass top bridge while the crusing. 2. The vibration source level of the main engine, screw shaft and screw propeller were respectively 110, 90 and 80% while the crusing. 3. The main deck vibration pressure level at the check points 2, 20, 30, 40, 60, 70, 80, 86m from the bow to stern was respectively 9, 8, 7, 10, 22, 45, 18, 23%. 4. The frequency distributions of the rr.ain engine, screw shaft, screw propeller vibration were from 3 Hz to 10 KHz, predominant frequency was 1 KHz, each vibration accelration the highest level were respectively 1. 3, 0.8, 0.5 $mm/s^2.$ 5. The predominant frequency distributions of the main deck, second deck, bridge deck and top bridge deck-s vibration were from 10 to 30 Hz, and each vibration accelration level were respectively 0.7, 0.05, 0.07, 0.04 $mm/s^2.$

  • PDF

실측응력 및 시뮬레이션에 의한 트러스 철도교의 피로피해도 분석 (Analysis of the Degree of Fatigue Damage in Truss Railway Bridge by Actual Stress and Simulation)

  • 정영호;김익겸;김지훈;김은성
    • 산업기술연구
    • /
    • 제20권A호
    • /
    • pp.149-158
    • /
    • 2000
  • After measuring actual stress by two measurements(Dynamic Strain Meter, Histogram Recorder) on truss rail road bridge, we could perform time history analysis by 3-D beam element method on modelling bridge. And then, after analyzing bridge structure in static by 3-D modelling, we estimated degree of fatigue damage in main member, secondary member of tie zone, cutting area of base metal cross section for confirming the result. In case that the simulated stress is carried out on modeling bridge, most of those simulation mainly is performed by main members. But in real bridge fatigue damage problems generally caused by junctions, connections, joints in which especially local stress is activated. Therefore, in this paper actual stress on critical area was estimated through the analysis result by simulation. With this study, we can estimate the degree of fatigue damage from a safety point of view and comparative accuracy.

  • PDF

Earthquake performance of the two approach viaducts of the bosphorus suspension bridge

  • Bas, Selcuk;Apaydin, Nurdan Memisoglu;Celep, Zekai
    • Earthquakes and Structures
    • /
    • 제11권3호
    • /
    • pp.387-406
    • /
    • 2016
  • The main purpose of this paper is to determine the dynamic characteristics and the structural stability of the two approach viaducts of the Bosphorus Suspension Bridge under the expected stresses that would be caused during earthquake conditions. The Ortakoy and the Beylerbeyi approach viaducts constitute the side spans of the bridge at two locations. The bridge's main span over the Bosphorus is suspended, whereas they are supported at the base at either end. For the numerical investigation of the viaducts, 3-D computational structural finite element-FE models were developed. Their natural frequencies and the corresponding mode shapes were obtained, analyzed, presented and compared. The performances of the viaducts, under earthquake conditions, were studied considering the P-Delta effects implementing the push-over (POA) and the non-linear time-history analyses (NTHA). For the NTHA, three earthquake ground motions were generated depending on the location of the bridge. Seismic performances of the viaducts were determined in accordance with the requirements of the Turkish Seismic Code for the Earthquake Design of Railways Bridges (TSC-R/2008) and those of Caltrans (CALTRANS-2001) given for Seismic Design of Steel Bridges, separately. Furthermore, the investigation was extended for evaluating the possible need for retrofitting in the future. After the analysis of the resultant data, a retrofit recommendation for the viaducts was presented.

가로거더공법에서 주형의 연속화 시점에 따른 주형의 거동 (Behavior of Main Girder in Continuous Girder System using Cross Girder Method)

  • 박정웅;서원주;이선호
    • 한국방재학회:학술대회논문집
    • /
    • 한국방재학회 2008년도 정기총회 및 학술발표대회
    • /
    • pp.533-536
    • /
    • 2008
  • H 형강은 시공성과 유지관리의 간편성으로부터 교량의 주형과 가설 구조물에 사용하는 경우가 증가하고 있다. 특히 H형강을 교량에 적용하는 경우 지점부의 부모멘트에 의해 지간장 20m 내외가 한계이고, 기존공법의 경우 콘크리트를 사용한 공법에 비해 큰 장점을 가지고 있지 못한다. 따라서 본 연구에서는 교량의 장지간화가 가능한 가로거더공법을 개발하여 기존의 강교량의 문제점을 극복한 장지간 H형강 강합성 교량을 개발하고자한다. 여기서는 수치해석적 방법으로 주형과 주형이 연속화되는 시점을 변화시켜 내하력을 계산하고, 그 결과로 부터 합리적인 가로거더공법을 개발하고자한다.

  • PDF

Reliability considerations in bridge pier scouring

  • Muzzammil, M.;Siddiqui, N.A.;Siddiqui, A.F.
    • Structural Engineering and Mechanics
    • /
    • 제28권1호
    • /
    • pp.1-18
    • /
    • 2008
  • The conventional design of bridge piers against scour uses scour equations which involve number of uncertain flow, sediments and structural parameters. The inherent high uncertainties in these parameters suggest that the reliability of piers must be assessed to ensure desirable safety of bridges against scour. In the present study, a procedure for the reliability assessment of bridge piers, installed in main and flood channels, against scour has been presented. To study the influence of various random variables on piers' reliability sensitivity analysis has been carried out. To incorporate the reliability in the evaluation of safety factor, a simplified relationship between safety factor and reliability index has been proposed. Effects of clear water (flood channel) and live bed scour (main channel) are highlighted on pier reliability. In addition to these, an attempt has also been made to explain the failure of Black mount bridge of New Zealand based on its pier's reliability analysis. Some parametric studies have also been included to obtain the results of practical interest.

당산철교의 설계 (Design of Dang-San Steel Railway Bridge)

  • 유동호;김선일
    • 전산구조공학
    • /
    • 제12권4호
    • /
    • pp.69-69
    • /
    • 1999
  • Design of Dangsan Steel Railway Bridge(a part of Seoul Subway Line NO. 2), which is supposed to be replaced after its 15years survice, was done, and the reconstruction has begun in Dec. 1997. The design include new superstruc-ture and bridge piers, retrofitting of the foun-dation, rail system, electric and signal, etc. In this paper, design of the structure is mainly summarized. The main span superstructure, across Han river, is composite section which is com-posed of steel box and reinforced concrete deck slab with 9 span continuous. The superstructure for the approaches is bottom througth type 2-cell steel box girder with steel floor system and concrete deck slab with 3 or 4 span continuous. The bridge piers was planned to be reconstructed based upon the result from the various investi-gations, while the foundation(cassion and pile foundation) was planned to be retrofitted. For superstructure erection, the method of combination of barge bent and heavy lifting and the launching truss method was investigated for the main span and approach spans, respectively.

  • PDF

A method for nonlinear aerostatic stability analysis of long-span suspension bridges under yaw wind

  • Zhang, Wen-Ming;Ge, Yao-Jun;Levitan, Marc L.
    • Wind and Structures
    • /
    • 제17권5호
    • /
    • pp.553-564
    • /
    • 2013
  • By using the nonlinear aerostatic stability theory together with the method of mean wind decomposition, a method for nonlinear aerostatic stability analysis is proposed for long-span suspension bridges under yaw wind. A corresponding program is developed considering static wind load nonlinearity and structural nonlinearity. Taking a suspension bridge with three towers and double main spans as an example, the full range aerostatic instability is analyzed under wind at different attack angles and yaw angles. The results indicate that the lowest critical wind speed of aerostatic instability is gained when the initial yaw angle is greater than $0^{\circ}$, which suggests that perhaps yaw wind poses a disadvantage to the aerostatic stability of a long span suspension bridge. The results also show that the main span in upstream goes into instability first, and the reason for this phenomenon is discussed.

Rapid assessment of suspension bridge deformation under concentrated live load considering main beam stiffness: An analytical method

  • Wen-ming Zhang;Jia-qi Chang;Xing-hang Shen;Xiao-fan Lu;Tian-cheng Liu
    • Structural Engineering and Mechanics
    • /
    • 제88권1호
    • /
    • pp.53-65
    • /
    • 2023
  • With the gradual implementation of long-span suspension bridges into high-speed railway operations, the main beam's bending stiffness contribution to the live load response permanently grows. Since another critical control parameter of railway suspension bridges is the beam-end rotation angle, it should not be ignored by treating the main beam deflection as the only deformation response. To this end, the current study refines the existing method of the main cable shape and simply supported beam bending moment analogy. The bending stiffness of the main beam is considered, and the main beam's analytical expressions of deflection and rotation angle in the whole span are obtained using the cable-beam deformation coordination relationship. Taking a railway suspension bridge as an example, the effectiveness and accuracy of the proposed analytical method are verified by the finite element method (FEM). Comparison of the results by FEM and the analytical method ignoring the main beam stiffness revealed that the bending stiffness of the main beam strongly contributed to the live load response. Under the same live load, as the main beam stiffness increases, the overall deformation of the structure decreases, and the reduction is particularly noticeable at locations with original larger deformations. When the main beam stiffness is increased to a certain extent, the stiffening effect is no longer pronounced.

현수교 PPWS 가설중 형상관리를 위한 PPWS 새그 및 장력민감도 산정법 개발 (Development of Sag and Tension Sensitivity Estimation Method for Configuration Control under PPWS Erection in a Suspension Bridge)

  • 정운;서주원;이원표
    • 대한토목학회논문집
    • /
    • 제32권5A호
    • /
    • pp.255-266
    • /
    • 2012
  • 현수교 주케이블은 완성시 교량의 구조적 건전성을 나타내는 중요한 지표이다. 주케이블은 가설완료시 자유 매달림(free hanging) 상태의 형상이 되며 교량완성시 행어, 보강형 등의 고정하중을 지지하여 가설완료시 형상과는 차이가 발생한다. 따라서, 주케이블의 가설완료시 형상이 교량완성시 형상에 직접적인 영향을 미치므로 가설중 형상관리가 매우 중요하다. 주케이블의 가설중 형상관리는 중앙 및 측경간은 새그조정으로, 정착경간은 장력조정으로 수행된다. 새그조정은 새그조절량에 대한 스트랜드 길이 조절량을 나타내는 산정값인 새그민감도가 필요하며 장력조정은 온도변화에 대한 장력변화량을 나타내는 장력민감도가 필요하다. 이에 본 연구에서는 케이블 형상가정에 따라 유도된 기본식과 이로부터 도출된 미분 관계식으로부터 새그 및 장력민감도를 산정하는 방법을 제안하였다. 그리고, 다양한 새그변화 요인에 대해 현수선 기본식을 사용한 비선형 수치해석 새그민감도 계산 흐름도를 제안하여 미분관계식을 적용한 새그민감도 결과와 비교하였다. 또한, 각 새그변화 요인이 복합적으로 발생함으로 이를 고려하여 케이블의 최종 새그변화량을 산정하는 방법을 제안하였다. PPWS 공법으로 시공중인 실교량을 대상으로 PPWS의 길이변화 및 온도변화, 경간장변화 등의 다양한 시공여건의 변화에 따른 새그 및 장력민감도를 산정하였다. 본 연구내용이 주케이블 가설중 형상관리 방법에 대한 체계적인 지침이 되기를 바라며, 향후 실교 현장적용 및 실증에 의해 완성도를 높일 것이다.

차량 하중 방향 변경에 의한 기존교량의 피로안정성 연구 (A Fatigue Stability Study of an Existing Bridge Due to Vehicle Load Direction Change)

  • 이규세;이승열
    • 한국산학기술학회논문지
    • /
    • 제10권8호
    • /
    • pp.2062-2067
    • /
    • 2009
  • 도로 건설 중 기존 교량에 가교를 접속하여 사용하는 경우가 종종 발생한다. 이 경우 차량 하중 방향의 변경으로 인하여 기존 교량의 주형의 설계 시 고려하지 못한 피로 안정성 문제가 발생할 수 있다. 따라서 본 연구에서는 기존 교량의 내민 슬라브와 주형의 안정성을 도로교 설계기준의 허용 피로 응력을 이용하여 검토하였다. 응력변동이 가장 큰 지점은 가교 접속 구간의 교량 시점에서 55m 떨어진 지점부, 그리고 교량 시점과 지점부 사이의 중앙점(교량 시점에서 32.5m 떨어진 지점)의 응력 변동이 크다는 것을 알 수 있었다. 이에 대한 기존 교량의 내민 슬라브와 주형에 보강이 필요함을 확인하여 보강대책을 수립하였고 보강 후 가교와 기존 교량의 피로 안정성 검토를 다시 수행하여, 도로교 설계 기준의 허용 피로 응력에 만족함을 확인하였다.