SINGLE MACHINE GROUP SCHEDULING UNDER DECREASING LINEAR DETERIORATION

  • Wang, Ji-Bo;Guo, Ai-Xia;Shan, Feng;Jiang, Bo;Wang, Li-Yan
    • Journal of applied mathematics & informatics
    • /
    • v.24 no.1_2
    • /
    • pp.283-293
    • /
    • 2007
  • This paper considers single machine scheduling problems with group technology (GT) and deteriorating jobs. A sequence independent setup is required to process a job from a different group and jobs in each group are processed together. We consider the case of jobs whose processing times are a decreasing function of their starting time. The objectives of scheduling problems are to minimize the makespan and the total completion time, respectively. We also provide polynomial time algorithms to solve these problems.

A Study on Machine and AGV Dispatching in Flexible Manufacturing Systems (유연생산 시스템에서 기계와 무인 운반차의 할당규칙에 관한 연구)

  • 박성현;노인규
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.43
    • /
    • pp.81-89
    • /
    • 1997
  • This study is concerned with the scheduling problems in flexible manufacturing systems(FMSs). The scheduling problem in FMSs is a complex one when the number of machines and jobs are increased. Thus, a heuristic method is recommended in order to gain near-optimal solutions in a practically acceptable time. The purpose of this study is to develope a machine and AGV dispatching algorithm. The proposed dispatching algorithm is a on-line scheduling algorithm considering the due date of parts and the status of the system in the scheduling process. In the new machine and AGV dispatching algorithm, a job priority is determined by LPT/LQS rules considering job tardiness. The proposed heuristic dispatching algorithm is evaluated by comparison with the existing dispatching rules such as LPT/LQS, SPT/LQS, EDD/LQS and MOD/LQS. The new dispatching algorithm is predominant to existing dispatching rules in 100 cases out of 100 for the mean tardiness and 89 cases out of 100 for the number of tardy jobs.

  • PDF

An Improved Ant Colony System for Parallel-Machine Scheduling Problem with Job Release Times and Sequence-Dependent Setup Times (작업투입시점과 순서의존적인 준비시간이 존재하는 병렬기계 일정계획을 위한 개선 개미군집 시스템)

  • Joo, Cheol-Min
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.35 no.4
    • /
    • pp.218-225
    • /
    • 2009
  • This paper considers a parallel-machine scheduling problem with job release times and sequence-dependent setup times. The objective of this problem is to determine the allocation policy of jobs and the scheduling policy of machines so as to minimize the weighted sum of setup times, delay times, and tardy times. A mathematical model for optimal solution is derived and a meta heuristic algorithm based on the improved ant colony system is proposed in this paper. The performance of the meta heuristic algorithm is evaluated through compare with optimal solutions using randomly generated several examples.

An Engine for DRA in Container Orchestration Using Machine Learning

  • Gun-Woo Kim;Seo-Yeon Gu;Seok-Jae Moon;Byung-Joon Park
    • International journal of advanced smart convergence
    • /
    • v.12 no.4
    • /
    • pp.126-133
    • /
    • 2023
  • Recent advancements in cloud service virtualization technologies have witnessed a shift from a Virtual Machine-centric approach to a container-centric paradigm, offering advantages such as faster deployment and enhanced portability. Container orchestration has emerged as a key technology for efficient management and scheduling of these containers. However, with the increasing complexity and diversity of heterogeneous workloads and service types, resource scheduling has become a challenging task. Various research endeavors are underway to address the challenges posed by diverse workloads and services. Yet, a systematic approach to container orchestration for effective cloud management has not been clearly defined. This paper proposes the DRA-Engine (Dynamic Resource Allocation Engine) for resource scheduling in container orchestration. The proposed engine comprises the Request Load Procedure, Required Resource Measurement Procedure, and Resource Provision Decision Procedure. Through these components, the DRA-Engine dynamically allocates resources according to the application's requirements, presenting a solution to the challenges of resource scheduling in container orchestration.

Integrated Process Planning and Scheduling in Multiple Plants Chain (다중 플랜트 체인 구조에서 공정계획과 일정계획의 통합)

  • Moon, Chi-Ung;Kim, Kyu-Woong;Kim, Jong-Soo;Hur, Sun
    • IE interfaces
    • /
    • v.13 no.3
    • /
    • pp.388-395
    • /
    • 2000
  • In this paper, we propose an approach for integrated process planning and scheduling through analysis of the alternative operations sequences and machine selection in supply chain with multiple plants. It takes into account such factors alternative machine, alternative operations sequences, setup time, transportation time between plants, along with other manufacturing factors. The objective of the model is to minimize makespan of machine schedules for all parts, determines operations sequence for each part, and selects a machine for each operation simultaneously. Examples are presented to demonstrate the effectiveness of the proposed approach.

  • PDF

Determination of Machining Speed Considering Failure Cost (절삭 가공에서의 불량 발생 비용을 고려한 가공속도 결정에 관한 연구)

  • Park, Chan-Woong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.33 no.4
    • /
    • pp.153-158
    • /
    • 2010
  • This study presents a single machine scheduling algorithm to minimize total cost(lateness cost, earliness cost and failure cost) by controlling machining speed. Generally, production scheduling uses the information of process planning and machining speed is not changed at production scheduling. And failure cost is not consider for scheduling algorithm. Therefore, the purpose of this study is to consider the change of machining speed for efficient production scheduling. And performance criteria for algorithm considers total cost. Especially, failure cost of product by increasing machining speed is considered.

An Algorithm for Single Machine Scheduling Using The Control of Machining Speed (단일공정에서의 가공속도 조절에 의한 생산일정계획)

  • 박찬웅
    • Journal of the military operations research society of Korea
    • /
    • v.24 no.2
    • /
    • pp.162-169
    • /
    • 1998
  • This study presents an single machine scheduling algorithm minimize lateness of product by controlling machining speed. Generally, production scheduling uses the information of process planning. But the production scheduling algorithm has not considered the control of machining speed in its procedures. Therefore, the purpose of this study is to consider the machining speed in production scheduling algorithm for efficient production scheduling. Machining time and machining cost required to manufacture a piece of a product are expressed as a unimodal convex function with respect to machining speed, so it has minimal point at minimum time speed or the minimum cost speed. Therefore, because of considering the machining cost, the control of machining speed for the algorithm is executed between minimum speed and maximum speed. An example is demonstrated to explain the algorithm.

  • PDF

The New Dispatching Rules for Practical Approaches of Job Shop Scheduling (Job Shop 작업계획의 실제적 접근을 위한 할당규칙)

  • 배상윤
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.25 no.3
    • /
    • pp.41-49
    • /
    • 2002
  • In the study, for the practical approaches of job shop scheduling, we propose the new dispatching rules of job shop scheduling in order to complement the practical applications in the existing researches. The assumed situation for the practical approaches considers the following; relaxation of assumption for capacity constraint by machine flexibility, the addition of the common use of jig and fixture, unbalanced machine workloads and duedate tightness, and produces fast rescheduling that reflects unexpected situations. The performance of the new dispatching rules is compared and analyzed with the existing methods through the computer experiments in the assumed conditions. The results can be useful to improving a field application of the job shop scheduling.

An efficient algorithm for scheduling parallel machines with multiple servers (다중 서버를 사용하는 병렬 머신 스케줄링을 위한 효율적인 알고리즘)

  • Chong, Kyun-Rak
    • Journal of the Korea Society of Computer and Information
    • /
    • v.19 no.6
    • /
    • pp.101-108
    • /
    • 2014
  • The parallel machine scheduling is to schedule each job to exactly one parallel machine so that the total completion time is minimized. It is used in various manufacturing system areas such as steel industries, semiconductor manufacturing and plastic industries. Each job has a setup phase and a processing phase. A removal phase is needed in some application areas. A processing phase is performed by a parallel machine alone while a setup phase and a removal phase are performed by both a server and a parallel machine simultaneously. Most of previous researches used a single server and considered only a setup phase and a processing phase. If a single server is used for scheduling, the bottleneck in the server increases the total completion time. Even though the number of parallel machines is increased, the total completion time is not reduced significantly. In this paper, we have proposed an efficient algorithm for the parallel machine scheduling using multiple servers and considering setup, processing and removal phases. We also have investigated experimentally how the number of servers and the number of parallel machines affect the total completion time.

Development of a production scheduling system for the real time controlled manufacturing system (실시간 제어가 가능한 일정 계획 시스템 개발)

  • 이철수;배상윤;이강주
    • Korean Management Science Review
    • /
    • v.10 no.2
    • /
    • pp.61-77
    • /
    • 1993
  • This paper involves a study of developing the production scheduling system in a general job shop type mechanical factory. We consider realistic situations in the job-shop environments, such as alternative machines for operation, the new kinds of processes, the machining center with the plural pallet, the operational situation of each machine during the scheduling period, occurings of urgent orders and machine breakdowns. We also propose the methodology of re-schedule. It is very fast and acceptable for real time production control system. These all functions are implemented on IBM PC and program source is written in PASCAL language.

  • PDF