References
- Anderson, E. J. and Nyirenda, J. C., 'Two New Rules to Minimize Tardiness in a Job Shop', International Journal of Production Research, 28(12): 2277-2292, 1990 https://doi.org/10.1080/00207549008942866
- Ashour, S., Sequencing Theory, Springer-Verlag Berlin Heidelberg, New York, Ch.1-3, 1972
- Baker, K. R., Introduction to Sequencing and Scheduling, John Wiley & Sons Inc., New York, Ch.2-8, 1974
- Bestwick, P. F. and Lockyer, K. G., 'A Practical Approach to Production Scheduling', International Journal of Production Research, 17(2): 95-109, 1979
- Blackstone, J. H., Phillips, D. T., and Hogg, G. L., 'A State-of-Art Survey of Dispatching Rules for Manufacturing Job Shop Operations', International Journal of Production Research, 20(1): 27-45, 1982 https://doi.org/10.1080/00207548208947745
- Blazewicz, J., Domschke, W., and Pesch, E., 'The Job Shop Scheduling Problem: Conventional and New Solution Techniques', European Journal of Operational Research, 93: 1-33, 1996 https://doi.org/10.1016/0377-2217(95)00362-2
- Chang, Y. L., Sueyoshi, T., and Sullivan, R. S., 'Ranking Dispatching Rules by Data Envelopment Analysis in a Job Shop Environment', IIE Transactions, 28: 631-642, 1996
- Fredendall, L. D., Melnyk, S. A., and Ragatz, G., 'Information and Scheduling in A Dual Resource Constrained Job Shop', International Journal of Production Research, 34(10): 2783-2802, 1996 https://doi.org/10.1080/00207549608905059
- Fry, T. D., Philipoom, P. R., and Blackstone, J. H., 'A Simulation Study of Processing Time Dispatching Rules', Journal of Operations Management, 7(4): 77-92, 1988 https://doi.org/10.1016/0272-6963(81)90006-1
- Fry, T. D., Philipoom, P. R., and Markland, R. E., 'Distatching in a Multistage Job Shop where Machine Capacities are Unbalanced', International Journal of Production Research, 26(7): 1193-1223, 1988 https://doi.org/10.1080/00207548808947935
- Gargeya, V. B. and Deane, R. H., 'Scheduling Research in Multiple Resource Constrained Job Shops: A Review and Critique', Journal of Operations Management, 34(8): 2077-2097, 1996
- Graves, S. C., 'A Review of Production Scheduling', Operation Research, 29(4): 646-674, 1981 https://doi.org/10.1287/opre.29.4.646
- Gunther, R. E., 'Server Transfer Delays in A Dual Resource Constrained Parallel Queueing System', Management Science, 25(12): 1245-1257, 1979 https://doi.org/10.1287/mnsc.25.12.1245
- Hankins, S. L., Wysk, R. A., and Fox, K. R., 'Using a CATS Database for Alternative Machine Loading', Journal of Manufacturing Systems, 3(2): 115-120, 1984 https://doi.org/10.1016/0278-6125(84)90002-5
- Hoitomt, D. J., Luh, P. B., and Pattipati, K. R., 'A Practical Approach to Job-Shop Scheduling Problems', IEEE Transactions on Robotics and Automation, 9(1): 1-13, 1991
- Hutchison, J., Leong, K., Snyder, D., and Peter, W., 'Scheduling Approaches for Random Job Shop Flexible Manufacturing Systems', International Journal of Production Research, 29(5): 1053-1067, 1991 https://doi.org/10.1080/00207549108930119
- Kim, Y. D., 'A Backward Approach in List Scheduling Algorithms for Multi-Machine Tardiness Problems', Computers and Operations Research, 22(3): 307-319, 1995 https://doi.org/10.1016/0305-0548(94)E0019-4
- Kim, Y. D., 'A Comparison of Dispatching Rules for Job Shops with Multiple Identical Jobs and Alternative Routeings', International Journal of Production Research, 28(5): 953-962, 1990 https://doi.org/10.1080/00207549008942766
- Mckay, K. N., Safayeni, F. R., and Buzacott, J. A., 'Job Shop Scheduling Theory: What is Relevant ?', Interface, 18(4): 84-90, 1988 https://doi.org/10.1287/inte.18.4.84
- Muhlemann, A. P., Lockett, A. G., and, Farn, C. K., 'Job Shop Scheduling Heuristics and Frequency of Scheduling'. International Journal of Production Research, 20(2): 227-241, 1982 https://doi.org/10.1080/00207548208947763
- Nasr, N. and Elsayed, E. A., 'Job Shop Scheduling with Alternative Machines', International Journal of Production Research, 28(9): 1595-1609, 1990 https://doi.org/10.1080/00207549008942818
- Nof, S., Barash, M., and Solberg, J., 'Operational Control of Item Flow in Versatile Manufacturing Systems', International Journal of Production Research, 17(5): 479-489, 1979
- Parunak, H. V. D., 'Characterizing The Manufacturing Scheduling Problem', Journal of Manufacturing System, 10(3): 241-259, 1991 https://doi.org/10.1016/0278-6125(91)90037-3
- Raman, N, Talbot, F. B., and Rachamadugu, R. V., 'Due Date Based Scheduling in a General Flexible Manufacturing System', Journal of Operations Management, 8(2): 115-132, 1989 https://doi.org/10.1016/0272-6963(89)90015-6
- Wilhelm, W. E. and Shin, H., 'Effectiveness of Alternative Operations in a Flexible Manufacturing System', International Journal of Production Research, 23(1): 65-79, 1985 https://doi.org/10.1080/00207548508904691