• Title/Summary/Keyword: Machine Scheduling

Search Result 381, Processing Time 0.029 seconds

Parallel Machine Scheduling with an Aid of Network Flow Model (네트워크 흐름 모형을 이용한 병행기계(併行機械) 시스템의 스케쥴링)

  • Chung, Nam-Kee;Park, Hyung-Kyu;Yang, Won-Sub
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.15 no.2
    • /
    • pp.11-22
    • /
    • 1989
  • The problem of scheduling n-jobs on m-uniform parallel machines is considered, in which each job has a release time, a deadline, and a processing requirement. The job processing requirements are allocated to the machines so that the maximum of the load differences between time periods is minimized. Based on Federgruen's maximum flow network model to find a feasible schedule, a polynomially bounded algorithm is developed. An example to show the effectiveness of our algorithm is presented.

  • PDF

The dynamic production scheduling on flexible flowshop systems using simulation (유연흐름 생산시스템에서의 시뮬레이션을 이용한 동적일정계획 연구)

  • 우훈식
    • Journal of the Korea Society for Simulation
    • /
    • v.5 no.2
    • /
    • pp.1-12
    • /
    • 1996
  • Utilizing the simulation approaches, the dynamic production scheduling system FOLS(Flexible flowshop On-Line Simulation) is developed under the flexible flowshop environment. When an interruption such as machine failure/recovery is occurred at the shop floor, the FOLS system performs evaluations for job selection rule oriented alternatives, and generates a dynamic production schedule based on the collected current shop floor data. For the case study, the FOLS system is applied to the printed circuit card assembly(PCCA) line and simulation results are reported.

  • PDF

Production Scheduling for a Flexible Manufacturing Cell

  • 최정상
    • Proceedings of the Korean Society of Machine Tool Engineers Conference
    • /
    • 1998.03a
    • /
    • pp.209-213
    • /
    • 1998
  • This study considers flowshop scheduling problem related to flexible maufacturing cell in which consists of two machining centers, robots for loading/unloading, and an automated guided vehicle(AGV) for material handling between two machining centers. Because no machinng center has buffer storage for work in process, a machining center can not release a finished job until the empty AGV is available at that machining center. While the AGV cannot tranfer an unfinished job to a machining center until the machining center empty. In this paper, an new heuristic algorithm is given to find the sequence that minimize their makespan.

  • PDF

A Code Scheduling Algorithm for Pipelined Architecture (파이프라인 아키텍쳐를 위한 코드 스케쥴링 알고리듬)

  • 김은성;임인칠
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • v.25 no.7
    • /
    • pp.746-758
    • /
    • 1988
  • This paper proposes a code scheduling algorithm which gives a software solution to the pipeline interlock. This algorithm provides a heuristic solution by recordering the instructions, instead of using hardware interlock mechanism when pipeline interlock prevents the execution of a machine instruction in a pipelined architecture. Program code size and overall execution time can be reduced due to the increased flexibility in the selection of instructions, which is possible from the alleviated ordering restriction on the use of conflict resources.

  • PDF

Optimal Scheduling Algorithm for Minimizing the Quadratic Penalty Function of Completion Times (작업 완료시간의 2차벌과금함수를 최소화하는 알고리즘에 관한 연구)

  • 노인규;이정환
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.13 no.22
    • /
    • pp.35-42
    • /
    • 1990
  • This paper deals with a single machine scheduling problem with a quadratic penalty function of completion times. The objective is to find a optimal sequence which minimizes the total penalty. A new type of node elimination procedure and precedence relation is developed that determines the ordering between adjacent jobs and is incorporated into a branch and bound algorithm. In addition, modified penalty function is considered and numerical examples are provided to test the effectiveness of the optimum algorithm.

  • PDF

An economic lot scheduling problem considering controllable production rate and mold cost (생산속도 조절이 가능한 단일설비에서 금형비용을 고려한 경제적 생산계획)

  • 문덕희;조상종;김진욱
    • Korean Management Science Review
    • /
    • v.13 no.3
    • /
    • pp.37-48
    • /
    • 1996
  • This paper presents an Economic Lot Scheduling Problem in which controllable production rates are considered. We also take into account the controllable range of production rate (i.e., maximum and minimum production rate) of each product and the mold cost which varies to the production rate. A mathematical model is developed and an iterative solution procedure is suggested. The objective of this problem is to minimize production related cost and the decision variables are common production cycle time and production rate of each product. As a case study, we adapted this model to the press machine of a company.

  • PDF

Application of Genetic Algorithms to a Job Scheduling Problem (작업 일정계획문제 해결을 위한 유전알고리듬의 응용)

  • ;;Lee, Chae Y.
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.17 no.3
    • /
    • pp.1-12
    • /
    • 1992
  • Parallel Genetic Algorithms (GAs) are developed to solve a single machine n-job scheduling problem which is to minimize the sum of absolute deviations of completion times from a common due date. (0, 1) binary scheme is employed to represent the n-job schedule. Two selection methods, best individual selection and simple selection are examined. The effect of crossover operator, due date adjustment mutation and due date adjustment reordering are discussed. The performance of the parallel genetic algorithm is illustrated with some example problems.

  • PDF

A Study on Determining Single-Center Scheduling using LTV(LifeTime Value) (고객 생애 가치를 활용한 단일 창구 일정계획 수립에 관한 연구)

  • 양광모;박재현;강경식
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2003.05a
    • /
    • pp.285-290
    • /
    • 2003
  • There is only one server available and arriving work require services from this server. Job are processed by the machine one at a time. The most common objective is to sequence jobs on the severs so as to minimize the penalty for being late, commonly called tardiness penalty Based on other objectives, many criteria may serve as s basis for developing job schedules. Therefore, this study tries to proposed that Scheduling by customer needs group for minimizing the problem and reducing inventory, product development time, cycle time, and order lead time.

  • PDF

Efficient Duplication Based Task Scheduling with Communication Cost in Heterogeneous Systems (이질 시스템에서 통신 시간을 고려한 효율적인 복제 기반 태스크 스케줄링)

  • Yoon, Wan-Oh;Baek, Jueng-Kuy;Shin, Kwang-Sik;Cheong, Jin-Ha;Choi, Sang-Bang
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.33 no.3C
    • /
    • pp.219-233
    • /
    • 2008
  • Optimal scheduling of parallel tasks with some precedence relationship, onto a parallel machine is known to be NP-complete. The complexity of the problem increases when task scheduling is to be done in a heterogeneous environment, where the processors in the network may not be identical and take different amounts of time to execute the same task. This paper introduces a Duplication based Task Scheduling with Communication Cost in Heterogeneous Systems (DTSC), which provides optimal results for applications represented by Directed Acyclic Graphs (DAGs), provided a simple set of conditions on task computation and network communication time could be satisfied. Results from an extensive simulation show significant performance improvement from the proposed techniques over the Task duplication-based scheduling Algorithm for Network of Heterogeneous systems(TANH) and General Dynamic Level(GDL) scheduling algorithm.