Kim, Woo-Seok;Kim, Sung-Hoon;Hahn, Song-yop;Park, Kyeong-Dal;Joo, Hyeong-Gil;Hong, Gye-Won;Han, Jin-Ho;Lee, Don-Kun;Park, Yeon-Suk
Progress in Superconductivity and Cryogenics
/
v.5
no.3
/
pp.34-37
/
2003
A 1 MVA single-phase high temperature superconducting (HTS) transformer with BSCCO-2223 wire was designed in this paper. The rated voltages of each sides of the transformer are 22.9 kV and 6.6 kV respectively. Double pancake HTS windings arranged reciprocally will be used for the transformer windings, because of the advantages of insulation and distribution of surge voltage in case of a large power and high voltage transformer. Single HTS wire was used for the primary windings and four parallel wires were used for the secondary windings of the transformer with transposition. A core of the transformer was designed as a shell type core separated with the windings by a cryostat made of GFRP with a room temperature bore. The operating temperature of the HTS windings will be about 65K with sub-cooled liquid nitrogen. A cryogenic cooling system using a GM-cryocooler for this HTS transformer by natural convection of liquid nitrogen was designed. This type of cooling system can be a good option for compactness, efficiency, and reliability of the HTS transformer.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.21
no.5
/
pp.60-67
/
2007
In this paper, a simulation method of the internal winding fault is proposed to calculate winding current and electromagnetic force in a distribution power transformer by suing FEM program. The model of the transformer is a single phase, 60[Hz], 1[MVA], 22.9[kV]/220[V], cable-type winding. The short-circuit current and electromagnetic force are calculated by FEM(Finite Element Method) program(Flux2D) and the results we verified with theoretical formula and PSPICE program. The simulation results are fairly good agreement with the other verified methods within 5[%] error rate. The turn-to-turn short-circuit current is 500 times of the rated current and the electromagnetic force is about $20{\sim}200times$. The method presented in this study may serve as one of the useful tools in the electromagnetic force analysis of the transformer winding behavior under the short circuit condition for design of the structure.
Objective : This study was designed to evaluate the relationship between the initial neurosurgical or psychosocial factors and the psychosocial outcome. Patients and Methods : We analyzed 123 head-injured patients who were referred to the department of psychiatry for the evaluation of psychosocial function. We analyzed initial neurosurgical variables such as Glasgow Coma scale(GCS) score, skull fracture, CT finding, and psychosocial outcomes with regards to psychosis, personality change, depression, anxiety and IQ on Intelligence Scale. Results : Patients with mild head injury(GCS score 13-15, N=94, 76.4%) had better recovery rate on Glasgow Outcome Scale(GOS), less personality change than those with moderate or severe head injury. However, depression, anxiety and intelligence were not significantly different between two groups. The skull fracture(N=37, 30.1%) did not influence on the psychosocial outcome with reference to personality change, depression, anxiety and intelligence. The patients with abnormal CT findings(N=64, 52%) had lower recovery rate on GOS, more frequent tendency in psychosis, personality change and severe depression, less frequent in anxiety and mild depression, than patients with normal CT finding. However, levels of intelligence were not different between two groups. The patients with industrial accidents(IA) had lower educational level, milder head injury, more delay for the psychiatric evaluation (longer treatment period) than those with motor vehicular accidents(MVA). The psychosocial outcome with reference to personality change, depression, anxiety, intelligence were not different between two groups. Conclusion : These findings indicate that the more severe initial trauma, the poorer psychosocial outcome. However, it was frequently observed that patients with mild head injury suffered from mild anxiety and depression. Therefore mild head injury appeared to be more complicated by psychosocial stressors. The patients with IA, despite the fact that initial head injury was mild, required longer treatment period than MVA.
We present domestic efforts for superconducting fault current limiter (SFCL) application in the Korea Electric Power Corporation (KEPCO) grid and pending points at issue. KEPCO's decision to upgrade the 154 kV/22.9 kV main transformer from 60 MVA to 100 MVA cast a problem of high fault current in the 22.9 kV distribution lines. The grid planners supported adopting an SFCL to control the fault current. This environment friendly to SFCL application must be highly dependent upon the successful development of SFCL having specifications that domestic utility required. The required conditions are (1) small size of not greater than twice of 22.9 kV gas insulated switch-gear (GIS), (2) sustainability of current limitation without the line breaking by circuit breakers (CB) for maximum 1.5 seconds. Also, optionally, recommended is (3) the reclosing capability. Conventional resistive SFCLs do not meet (1) $\sim$ (3) all together. A hybrid SFCL is an excellent solution to meet the conditions. The hybrid SFCL consists of HTS SFCL components for fault detection and line commutation, a fast switch (FS) to break the primary path, and a limiter. This characteristic structure not only enables excellent current limiting performances and the reclosing capability, but also allows drastic reduction of HTS volume and small size of the cryostat, resulting in economic feasibility and compactness of the equipment. External current limiter also enables long term limitation since it is far less sensitive to heat generation than HTS. Semi-active operation is another advantage of the hybrid structure. We will discuss more pending points at issues such as maintenance-free long term operation, small size to accommodate the in-house substation, passive and active control, back-up plans, diagnosis, and so on.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.22
no.12
/
pp.36-46
/
2008
This paper is to study on the Construction of Test circuit and Unification of Experiment Method for high voltage gas-insulated load switch using high power testing system The high power testing system is a equipment to verify electrical and mechanical performance on electrical product. The system consist of short-circuit generator, back-up breaker, making switch, impedance, high voltage transformer, low voltage transformer, measuring and protection system, etc. Using this system, we can test related to high power, for example, short-time current test, active load Current test, magnetizing Current test, capacitive current test, closed loop current test, etc. Standards of high voltage gas-insulated load switch that is in use domestic distribution line are ES 5925-0002, IEC 60265-1, IEC 62271-1 and IEEE C 37.74, etc. In this paper, we standardized on the test procedure, organization of test circuit and analysis of measured data prescribed many difference standards, and applied this test method to 600[MVA] high power testing system. So that we can test the load switch satisfied standards.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.23
no.12
/
pp.191-200
/
2009
This paper, which consists of two parts, dealt with the parameter tuning of the power system stabilizer for a 612[MVA] thermal power plant in KEPCO system and its validation in field test. In Part 1 of the paper, the selection of parameters such as lead-lag time constants for phase compensation, system gain was optimized by using linear & eigenvalue analyses and they were verified through the time-domain transient stability analysis. In part 2, the performance of PSS was finally verified by the generator's on-line field test. Through the comparisons of simulation results and measured data before and after tuning of the PSS, the models of generator and its controllers including AVR, Governor and PSS used in the simulation are validated and confirmed.
Frimpong, Paul;Nguyen, Truc Thi Hoang;Sodnom-Ish, Buyanbileg;Nimatu, Edinam Salia;Dampare, Nana Yaa Asantewaa;Rockson, Roberta;Awuah, Samuel Baffour;Amponsah, Emmanuel Kofi;Newton, Cardinal;Kim, Soung Min
Journal of the Korean Association of Oral and Maxillofacial Surgeons
/
v.47
no.6
/
pp.432-437
/
2021
Objectives: The mandible and other parts of the maxillofacial region suffer significant morbid injuries following road traffic accidents. Our study gives epidemiological description of mandibular fractures in Ghana and also evaluates the relevance of closed reduction and indirect fixation for managing mandibular fractures in low-resource health facilities in low-income countries like Ghana. Patients and Methods: This is a retrospective study involving 268 patients who reported to the Department of Oral and Maxillofacial Surgery of the Sunyani Regional Hospital with mandibular fractures from January 2010 to December 2019. Patient medical records were assessed for information on age, sex, fracture etiology, anatomic location of fracture, time of day of road traffic accident, and other associated injuries. Results: A total of 268 patients were included in this study (males, 216 [80.6%]; females, 52 [19.4%]). Motor vehicular accident (MVA) was the leading cause of mandibular fractures (202 injuries, 75.4%). Other etiologies included assault (39, 14.6%), gunshot (13, 4.9%), falls (12, 4.5%), and industrial accidents (2, 0.7%). Of the 161 male cases caused by MVA, 121 (75.2%) occurred at night and in the evening while the remaining 40 (24.8%) occurred in the morning and afternoon. Among all managed 222 patients, 212 (79.1%) were treated with closed reduction and indirect fixation technique while 10 (3.7%) were treated with open reduction and direct fixation. Conclusion: Closed reduction with indirect fixation could successfully be used to manage mandibular fractures in low resourced health facilities, especially in low-income countries. The poor lightening system on roads in Ghana is a major contributory factor to motor vehicular accidents.
The Journal of the Institute of Internet, Broadcasting and Communication
/
v.22
no.4
/
pp.127-132
/
2022
Among the electrical components mounted on railroad cars, the largest load is the main transformer, which has a low power density of 0.2~0.4 MVA/ton due to the low operating frequency(60Hz), which is an important factor for weight reduction. Therefore, research on molded transformers, semiconductor transformers, etc. is being actively conducted at Domestic and foreign in order to improve the main transformer for railway vehicles. Meanwhile, attempts are being made to apply a permanent magnet synchronous motor (PMSM) to replace an induction motor as a traction motor that is mostly applied to domestic and foreign railway vehicles. Permanent magnet synchronous motors (PMSMs) can secure higher power density and efficiency compared to induction motors, but have disadvantages in that the materials required for manufacturing are expensive and design is somewhat difficult compared to induction motors. Considering these problems, in this paper, we suggest that a small and lightweight semiconductor transformer is applied, and a simple structure, high torque, low cost SRM can be applied in accordance with the requirements such as weight reduction and high efficiency of railroad vehicles. content.
The characteristics of voltage drop and THD for parallel operating 11 PCRs (Phase Controlled Rectifiers) are analysed. The PCRs are used to drive high current (1.6 kA ${\sim}$ 3.7 kADC) electromagnetic coils for electromagnets. All the PCRs operate simultaneously in pulsed mode, and the pulse shot occurs every 150 seconds. During the pulse operation the PCR output current ramps up for 4 seconds, and then keeps flat top state for 2 seconds, and finally ramps down for 4 seconds. For the flat top mode a severe voltage drop and distortion appear in the power system because transformers for the PCRs are designed considering pulsed mode operation. It is expected that the analysis method can be applied to improve the system performance including power factor and design of high power pulsed mode operating power supply systems.
Wind turbines as a power distribution system linked to the driving operation according to the characteristics of the distribution system can be adversely affected by a change of circumstances, depending on Distribution Systems with driving characteristics of a wind turbine can be affected. Thus according to the grid-tied wind turbines and transient suppression of the distribution lines and distribution lines outside of the accident in order to maintain stable power supply to supply reactive power efficient system is necessary to keep the voltage constant. In this paper, we substantiated in Jeju Hangwon 12 Unit Level 1MVA STATCOM system configuration, control, configure, and test results will be introduced.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.