• Title/Summary/Keyword: MS-Project

Search Result 77, Processing Time 0.027 seconds

Assessing the Impacts of Project Interfaces in Construction Works in Nigeria

  • Okebugwu, Onyinyechi Francesca;Omajeh, Enoch Oghene-Mairo
    • Journal of Construction Engineering and Project Management
    • /
    • v.5 no.1
    • /
    • pp.20-25
    • /
    • 2015
  • Interface management problems inherent in construction projects hamper their successful delivery. Therefore, this study aimed at determining the most important project interfaces in construction works in Nigeria in terms of most significant potential impacts, so that management attention are objectively focused on potential highest impacting project interfaces. From a review of literature, 28 project interfaces management issues were identified and categorized. Structured questionnaires were used to collect data concerning the impact (estimated losses to the project in terms of cost) and probability of occurrence of the identified interfaces. The interfaces were ranked using their computed Matrix Scores (MS). The results reveal that "project-workers interfaces problem manifested in use of inappropriate mixes" is the highest impacting. A ranking of the interface categories also reveal that the interfaces at the execution phase of a project (MS = 1226.79) are those that could result in the highest losses to the project.

The study of EPC System S/W based on the UI (EPC시스템에서 UI기반의 소프트웨어에 대한 고찰)

  • Hwang, Seong Ha;Yoo, Sun Il;Jeong, Jin Su
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.6 no.1
    • /
    • pp.61-68
    • /
    • 2010
  • Generally EPC management system was simply management concept through the normal S/W. Our LNG Plant R&D Center wanted to the excellent management system from the S/W. So We developed the R&D management S/W and EPC management S/W Built in the Microsoft Project Server. Our system made to the customer Requirements. It was just User Interface protocol. But User Interface has more Weak position, because it makes from the MS Project Servers. Ms Projector server make easy to treat the project on the WBS. EPC parts mixed WBS and normally Ms SQL Database. It has very complicated Structures. Now We planed to make the general Database and Ms Project Server, It' means to the S/W Developer and Schedule Manager ability. We will successfully integrate R&D management system and EPC system and other softwares.

  • PDF

A Case Study on Team Project in Calculus for Medicine - Numerical Methods of Integration - (의대생을 위한 미분적분학 팀프로젝트 사례 - 정적분의 수치채산법을 중심으로 -)

  • Min, Sook
    • Communications of Mathematical Education
    • /
    • v.26 no.2
    • /
    • pp.155-176
    • /
    • 2012
  • In this paper, we present a practical and essential method of using team projects for calculus. We, specifically, take into account the team project that calculate the volume of lung represented on CT scan images. We have demonstrated that the process of analyzing the images in a team project encourage studying numerical methods of integration for calculus. Also, we have used various technological programs(MATLAB, MATHEMATICA, MS Excel) to solve the team project.

Development of A Computerized Risk Management System for International EPCS Projects

  • Yoo, Wi Sung;Kim, Woo-young;Sung, Yookyung
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.614-615
    • /
    • 2015
  • In these days, global construction market is speedily increasing and domestic construction companies have a chance of new contracts. In the meantime, international projects have been increasingly forced to cope with potential risks, which seriously impacted achieving the targeted time and cost. In this study, we introduce a computerized risk management system for international EPCS projects, which is constructed on the needs of practitioners and decision makers as an aid to proactively control the potential risks and to monitor continuously their status and variation. The system is called the Project Risk Management System (PRiMS) is useful for furnishing project managers with warning signals as a project is progressing and helpful for producing the total risk score and tracking risk variation.

  • PDF

Spreadsheet-based Educational Method for Management Science (스프레드시트를 기반으로 한 새로운 경영과학 강의 방식)

  • 정기호
    • Korean Management Science Review
    • /
    • v.19 no.2
    • /
    • pp.41-58
    • /
    • 2002
  • New attempt has been made on Management Science (MS) education since the end of 1990s. The most distinctive feature of the new attempt is using spreadsheet program like Excel as a teaching tool for MS course. The spreadsheet program gives an excellent tool for modeling and solvina MS problems. In order to improve the pedagogical effect through using the spreadsheet program for MS course, new teaching model based on spreadsheet encompassing new course contents, effective instruction method, and examination method is needed. For this purpose, professors teaching MS should share their own teaching experiences and methods. So this paper explains remarkable functions of Excel and how to use them for the MS tools. This paper also stresses the importance of team project and case study to improve the effect of MS education through the use of Excel and presents some tips on MS education.

MS Azure based IoT system for a Capstone Design Project (캡스톤디자인으로 구현한 MS Azure 기반 IoT 시스템)

  • Choi, Dae Woo;Choi, Moon Guen;Kim, Jong Woo
    • Journal of Engineering Education Research
    • /
    • v.22 no.1
    • /
    • pp.55-60
    • /
    • 2019
  • This paper deals with the process and requirements of a capstone design project performed by undergraduate students. We discuss about the preliminary study for the capstone design, the derivation of a subject, the level descriptor of the subject, and the system requirements. And then, we summarize the results of the capstone design project entitled as Microsoft Azure based IoT (Internet of Things) system which is performed by 4 undergraduate students during 10 months. This system is composed of a Zigbee sensor network, the TCP/IP Internet, an IoT server, and a smartphone application program, with which we can gather the sensor data and control actuators at the far away area.

DEVELOPMENT OF BUILDING INFORMATION MODEL FOR RESOURCES OPTIMIZATION IN CONSTRUCTION PROJECT

  • Gopal M. Naik;Rokhsareh Badamahgan
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.634-639
    • /
    • 2013
  • The aim of the study is to develop the 3D visualization of Building Information Model and integrated 4D model for optimization of resources in the construction project. This study discuss the process of methodology and creation of 4D model of the project and simulate it to monitor the workflow at the site. Different stages of the construction process and activities are generated by using Revit and MS Project. MS project has been used for creation of the schedules and these are linked with the Revit for 3D modeling. The time used as the fourth dimension and 4D model created by using Navisworks Time liner software. Narges shopping center is presented as a case study to realize the actual uses and benefits of Building Information Model (BIM). Narges shopping mall is located in Tehran, Iran. As a part of Hekmat master plan, Narges shopping center is an 11 stores building with a total area of 30000 Sq.m. This shopping and entertainment center is comprised of 150 retails and two multi-use public halls with a capacity of 400 persons each and underground parking with total 400 parking space. The main purpose of architecture was to create an urban public center along with its revolving, spiral like form and an ever changing continuous façade by means of different colors, materials, which is in harmony with the other building of the master plan. The approximate cost of the project is $17 million and duration of the project schedule is 30 months. The developed Building Information Model enabled us to identify the potential collisions or clashes between various structural and architectural systems. 4D model has been used for limiting the interaction between subcontractors installing the different systems so rework could be avoided and productivity maximized. It is also observed that the utility of BIM for construction stimulation and clash detection is the best suitable method. Clash detection before the implementation of work is highly recommended to avoid rework.

  • PDF

An Implementation Case of Database System using MS-Access (MS-Access를 이용한 데이터베이스 시스템 구축 사례)

  • Song, Eun-Jee;Kang, Min-Sik
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2011.10a
    • /
    • pp.755-758
    • /
    • 2011
  • 분산된 데이터를 효율적으로 관리하기 위해 일반적으로 DBMS을 사용하고 있다. DBMS에는 여러 시스템들이 있지만 대부분 상용판매이기 때문에 시스템을 구축하는데 있어 비용적인 문제가 있을 뿐만 아니라 사용방법도 복잡하여 사용하기 어려운 면이 있다. 이에 본 연구에서는 전문적인 지식 없이도 조작과 관리가 쉽고 체계적이고 통합적으로 관리가 가능하며 MS Office 제품과의 호환성이 뛰어난 MS-Access를 이용한 시스템구축 사례를 제안한다. MS-Access를 이용하면 서버나 기타 시스템 없이도 기존에 사용하고 있는 컴퓨터에서 데이터베이스를 운영할 수 있고 따로 전문적인 DB관리자가 필요가 없다. 본 논문에서는 이러한 점을 이용하여 프로젝트를 관리할 수 있는 시스템을 구현하였다. 이 시스템은 비용투자에 열악한 중소기업이나 비영리 단체에서 효율적으로 사용할 수 있다.

  • PDF

Development of Proteomics and Applications of Proteomics in Toxicology

  • Jung, Woon-Won;Huh, Yoon-Ee;Ryu, Jae-Chun;Lee, Eun-Il;Sul, Dong-Geun
    • Molecular & Cellular Toxicology
    • /
    • v.1 no.1
    • /
    • pp.7-12
    • /
    • 2005
  • Proteomics has recently received intense scientific interest after the completion of the Human Genome Project, because this genome-based high technology allows to search new drug targets or diagnostic markers. Many proteome projects including Human plasma proteome projects (HPPP), Human liver proteome projects (HLPP), Human brain proteome projects (HBPP), and Mouse and Rat Proteome Project (MRPP) have been carried out and proteomic analytical techniques have been developed in second dimensional electrophoresis (2-DE) and LC/MS system. This powerful method has been applied in toxicology producing a new term "Toxicoproteomics". In this review, recent proteome projects, proteomic technologies, and toxicoproteomics will be discussed.

THE HST COSMOS PROJECT: CONTRIBUTION FROM THE SUBARU TELESCOPE

  • TANIGUCHI YOSHIAKI;SCOVILLE N. Z.;SANDERS D. B.;MOBASHER B.;AUSSEL H.;CAPAK P.;AJIKI M.;MURAYAMA T.;MIYAZAK S.;KOMIYAMA Y.;SHIOYA Y.;NAGAO T.
    • Journal of The Korean Astronomical Society
    • /
    • v.38 no.2
    • /
    • pp.187-190
    • /
    • 2005
  • The Cosmic Evolution Survey (COSMOS) is a Hubble Space Telescope (HST) treasury project. The COSMOS aims to perform a 2 square degree imaging survey of an equatorial field in I(F814W) band, using the Advanced Camera for Surveys (ACS). Such a wide field survey, combined with ground-based photometric and spectroscopic data, is essential to understand the interplay between large scale structure, evolution and formation of galaxies and dark matter. In 2004, we have obtained high-quality, broad band images of the COSMOS field (B, V, r', i', and z') using Suprime-Cam on the Subaru Telescope, and we have started our new optical multi-band program, COSMOS-21 in 2005. Here, we present a brief summary of the current status of the COSMOS project together with contributions from the Subaru Telescope. Our future Subaru program, COSMOS-21, is also discussed briefly.