• Title/Summary/Keyword: MCE(Mission Control Element)

Search Result 7, Processing Time 0.017 seconds

Operational Report of the Mission Analysis and Planning System for the KOMPSAT-I

  • Lee, Byoung-Sun;Lee, Jeong-Sook;Kim, Jae-Hoon;Lee, Seong-Pal;Kim, Hae-Dong;Kim, Eun-Kyou;Choi, Hae-Jin
    • ETRI Journal
    • /
    • v.25 no.5
    • /
    • pp.387-400
    • /
    • 2003
  • Since its launching on 21 December 1999, the Korea Multi-Purpose Satellite-I (KOMPSAT-I) has been successfully operated by the Mission Control Element (MCE), which was developed by the ETRI. Most of the major functions of the MCE have been successfully demonstrated and verified during the three years of the mission life of the satellite. This paper presents the operational performances of the various functions in MAPS. We show the performance and analysis of orbit determinations using ground-based tracking data and GPS navigation solutions. We present four instances of the orbit maneuvers that guided the spacecraft form injection orbit into the nominal on-orbit. We include the ground-based attitude determination using telemetry data and the attitude maneuvers for imaging mission. The event prediction, mission scheduling, and command planning functions in MAPS subsequently generate the spacecraft mission operations and command plan. The fuel accounting and the realtime ground track display also support the spacecraft mission operations.

  • PDF

Operational Report of the Mission Analysis and Planning System for the KOMPSAT-I

  • Lee, Byoung-Sun;Lee, Jeong-Sook;Kim, Jae-Hoon;Lee, Seong-Pal;Kim, Hae-Dong;Kim, Eun-Kyou;Park, Hae-Jin
    • Bulletin of the Korean Space Science Society
    • /
    • 2003.10a
    • /
    • pp.46-46
    • /
    • 2003
  • Since its launching on 21 December 1999, the KOrea Multi-Purpose SATellite-Ⅰ (KOMPSAT-Ⅰ) has been successfully operated by the Mission Control Element (MCE), which was developed by the Electronics and Telecommunications Research Institute (ETRI). Most of the major functions of the MCE have been successfully demonstrated and verified during the three years of the mission life of the satellite. The Mission Analysis and Planning Subsystem (MAPS), which is one of the four subsystems in the MCE, played a key role in the Launch and Early Orbit Phase (LEOP) operations as well as the on-orbit mission operations. This paper presents the operational performances of the various functions in MAPS. We show the performance and analysis of orbit determinations using ground-based tracking data and GPS navigation solutions. We present four instances of the orbit maneuvers that guided the spacecraft from injection orbit into the nominal on-orbit. We include the ground-based attitude determination using telemetry data and the attitude maneuvers for imaging mission. The event prediction, mission scheduling, and command planning functions in MAPS subsequently generate the spacecraft mission operations and command plan. The fuel accounting and the realtime ground track display also support the spacecraft mission operations. We also present the orbital evolutions during the three years of the mission life of the KOMPSAT-Ⅰ.

  • PDF

Orbit Determination and Maneuver Planning for the KOMPSAT Spacecraft in Launch and Early Orbit Phase Operation

  • Lee, Byung-sun;Lee, Jeong-Sook;Won, Chang-Hee;Eun, Jong-Won;Lee, Ho-Jin
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1999.10a
    • /
    • pp.29-32
    • /
    • 1999
  • Korea Multi-Purpose SATellite(KOMPSAT) is scheduled to be launched by TAURUS launch vehicle in November, 1999. Tracking, Telemetry and Command(TT&C) operation and the flight dynamics support should be performed for the successful Launch and Early Orbit Phase(LEOP) operation. After the first contact of the KOMPSAT spacecraft, initial orbit determination using ground based tracking data should be performed for the acquisition of the orbit. Although the KOMPSAT is planned to be directly inserted into the Sun- synchronous orbit of 685 km altitude, the orbit maneuvers are required fur the correction of the launch vehicle dispersion. Flight dynamics support such as orbit determination and maneuver planning will be performed by using KOMPSAT Mission Analysis and Planning Subsystem(MAPS) in KOMPSAT Mission Control Element(MCE). The KOMPSAT MAPS have been jointly developed by Electronics and Telecommunications Research Institute(ETRI) and Hyundai Space & Aircraft Company(HYSA). The KOMPSAT MCE was installed in Korea Aerospace Research Institute(KARI) site for the KOMPSAT operation. In this paper, the orbit determination and maneuver planning are introduced and simulated for the KOMPSAT spacecraft in LEOP operation. Initial orbit determination using short arc tracking data and definitive orbit determination using multiple passes tracking data are performed. Orbit maneuvers for the altitude correction and inclination correction are planned for achieving the final mission orbit of the KOMPSAT.

  • PDF

ANALYTICAL STUDY ON MISSION CONTROL ELEMENT SYSTEM AVAILABILITY FOR KOREA MULTIPURPOSE SATELLITE(KOMPSAT)I (다목적 실용위성 1호 관제시스템 가용도 분석 연구)

  • 은종원;장대익;김재명
    • Journal of Astronomy and Space Sciences
    • /
    • v.15 no.2
    • /
    • pp.485-497
    • /
    • 1998
  • To estimate the availability of the MCE for KOMPSAT I, mathematical models of H/W and S/W availability, the availability estimating methods for parallel and redundant system were presented. Furthermore, to improve and estimate the MCE system availability, we analyzed the computational procedure of redundant methods, and we also included effective switch choosing methods in this paper. The analytical results of the MCE system availability were estimated as follows: - 0.995216 not considering system redundancy, - 0.9955165 considering system redundancy, and -0.9963991 for the time of system real time operation.

  • PDF

Design Approach to Satellite Test and Operations Common Procedure Languages (위성시험운영 통합 절차서 언어 설계 접근)

  • Kwak, Nam-Yee;Huh, Yun-Goo;Choi, Jong-Yeoun
    • Aerospace Engineering and Technology
    • /
    • v.8 no.2
    • /
    • pp.170-178
    • /
    • 2009
  • In order to develope a common ground system, a general procedure language that can be used in both EGSE and MCS is primarily needed. As the first step in developing a common test and integration procedure language, KARI's ATS for AIT and MCE for GS were compared to some of the most representative languages such as PLUTO regarded European standard, STOL and ELISA and PIL. Based on the analysis, design features of developing a common test and integration procedure language were presented.

  • PDF

Launch and Early Orbit Phase Simulations by using the KOMPSAT Simulator

  • Lee, Sanguk;Park, Wan-Sik;Lee, Byoung-sun;Lee, Ho-Jin;Park, Hanjun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1999.10a
    • /
    • pp.33-36
    • /
    • 1999
  • The KOMPSAT, which is scheduled to be launched by Taurus launch vehicle in late November of 1999, will be in a sun-synchronous orbit with an altitude of 685km, eccentricity of 0.001, inclination of 98deg and local time of ascending node of 10:50 a.m. Electronics and Telecommunications Research Institute and Daewoo Heavy Industry had jointly developed a KOMPSAT Simulator as a component of the KOMPSAT Mission Control Element. The MCE had been delivered to Korea Aerospace Research Institute for the KOMPSAT ground operation. It is being used for training of KOMPSAT ground station personnel. Each of satellite subsystems and space environment were mathematically modeled in the simulator. To verify the overall function of KOMPSAT simulator, a Launch and Early Orbit Phase(LEOP) operation simulations have been performed. The simulator had been verified through various tests such as functional level test, subsystem test, interface test, system test, and acceptance test. In this paper, simulation results for LEOP operations to verify flight software adapted into simulator, satellite subsystem models and environment models are presented.

  • PDF

OSMI를 이용한 달 촬영 가능 시각 결정을 위한 고속 시뮬레이터 개발

  • Kang, Chi-Ho
    • Aerospace Engineering and Technology
    • /
    • v.1 no.2
    • /
    • pp.132-140
    • /
    • 2002
  • By utilizing OSMI (Ocean Scanning Multi-spectral Imager) onboard KOMPSAT-1, the moon can be imaged. Because the moon has no atmosphere and reflects sun lights at a constant rate, it can be the radiance source for calibration of OSMI. But there are a lot of risks which made KOMPSAT-1 enter into safe-hold mode. So planning the imaging of the moon with OSMI should be determined seriously with consideration to information on KOMPSAT-1 operation, the moon, the sun, etc. But it takes a long time for determining the imaging time of the moon using MCE(Mission Control Element) simulator and there are operational problems to be solved. In this paper, fast simulator for determining imaging time for the moon with OSMI has been developed. The proper timeline for imaging the moon and the position of the moon image in OSMI image coordinates and the phase of the moon are determined. STK was used for acquiring information on KOMPSAT-1, the moon, the sun and the characteristitcs of OSMI are considered. As a result, we can determine imaging time of the moon with OSMI much faster and efficiently.

  • PDF