Web 기반의 종합적 환경제어시스템의 개발 및 적용 (Web Based Comprehensive Environmental Control Engine)

  • 김준현
    • 산업기술연구
    • /
    • 제19권
    • /
    • pp.293-300
    • /
    • 1999
  • This paper is aimed at the development of comprehensive environmental management system, which can be operated on the basis of world wide web. This study has been initiated as a topic of G7 project in 1988, and will be accomplished in 2001. Even thought there should be lots of works remaining to achieve this goal, preliminary products can be summarized as follows : 1) integrated environments information management system, 2) web based control engine, 3) surface water environment management system, 4) subsurface water environment management system, 5) sewer and waterworks management system. The core methodology of the engine is the generalized multidimensional finite element matrices to depict the terms in the analysis of various partial differential equations. Spatial information management system (ArcView) and Visual Basic were extensively employed to construct GUI oriented web based engine. Developed systems were consist with very intense computer codes due to the necessity of combinatory management of environmental problems. The web based engine could be served as a decision tool for the integrated management of environmental projects in Korea.

  • PDF

건설업의 안전경영시스템 모델개발에 관한 연구 (Development of a Safety Management System Model in the Construction Industry)

  • 이근석;박범
    • 대한안전경영과학회지
    • /
    • 제1권1호
    • /
    • pp.41-54
    • /
    • 1999
  • The government has done much investment and its efforts to prevent the accident in the construction industry owing to the high rate of accident and the dangerous factors, but it is not improved the level of safety activities as desired. On the contrast, after adopted quality management system and environment management system in the advanced countries, they are developing the safety management system consequently and achieving high efficiency in this field. Although Korea executed the KISCO 2000 program by Korea Industrial Safety Corporation since July 1, 1999, it was excepted to the construction industry. Therefore, it is urgent matter to be developed the safety management system being applied to the construction industry. In this study, it was developed the safety management system in the construction industry, and suggested its documentation and an executive method according to the construction safety works.

  • PDF

연구개발 조직의 지식경영시스템 기능에 대한 인지적 중요도에 관한 연구: 정부출연 연구소를 중심으로 (The Perceived Importance of Knowledge Management System Functionalities in Research Teams: An Empirical Analysis of Government-sponsored Research Organizations)

  • 이홍주;유기현;김종우;박성주
    • Asia pacific journal of information systems
    • /
    • 제13권3호
    • /
    • pp.243-259
    • /
    • 2003
  • Many R&D organizations have interests on knowledge management system(KMS) to organize and utilize their knowledge resources. Currently, for research collaboration and knowledge management R&D organizations use either a specialized knowledge management system or a set of general application systems such as basic messaging system and document management system. The objectives of this paper are to identify important functionalities of knowledge management systems based on team characteristics and knowledge process of research teams in research organizations and to provide implications to design and implement knowledge management system for R&D teams. Survey results show that research teams perceive communication, collaboration and connection functionalities are important when their team sizes are large or they are distributed. During knowledge capture process, they need personalization of knowledge to reduce information overload.

건설업에 대한 안전보건경영시스템(OHSMS)도입 및 적용에 대한 사례 연구 (A Study on Introduction & Application of Occupational Health & Safety Management System for Construction Industry)

  • 장봉정;강경식
    • 대한안전경영과학회지
    • /
    • 제7권1호
    • /
    • pp.25-44
    • /
    • 2005
  • Safety management cost, $US\$$ one thousand billion has been input to the construction area from 1995 to 2000 but the management quality is still in the developing country level. The above mentioned increase of accident rate are attributed to the generous code regulation, net fit to the sense, varying with time change, but the more fundamental reason of this is no practical construction safety management system, up to now. Hardware-orienting operation for the system could be a main reason of this problem. In this paper, we developed a model for efficient construction safety system. It was found from the case study that the A Study on Introduction Application of Occupational Health & Safety Management System for Construction Industry.

DEVELOPMENT OF BRIDGE MANAGEMENT SYSTEMS IN TAIWAN

  • Nie-Jia Yau;Hsien-Ke Liao
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.440-449
    • /
    • 2007
  • This paper describes the efforts in developing several versions of bridge management system (BMS) in Taiwan. There were several versions of stand-alone BMS developed in Taiwan prior to the Ji-Ji earthquake that occurred in year 1999. Since many bridges were seriously damaged by this earthquake, the Ministry of Transportation and Communication determined to develop a nationwide BMS to have a better by control on the status of bridge maintenance. Implemented in year 2000, the Taiwan Bridge Management system (T-BMS) is now the dominating and mandatory system used by all the government agencies that are responsible for bridge maintenance. Having more then 25,000 bridges in its inventory, T-BMS has thousands of logins per month to update data in the relevant database. The experiences and difficulties of using such a nationwide bridge management system are discussed. Finally, future plans for BMS development are also proposed in this paper.

  • PDF

CREATING TOTAL PROJECT MANAGEMENT SYSTEM ON APPLYING LEAN CONSTRUCTION

  • Sang-Chul Kim;Chan-Jeong Park
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.41-49
    • /
    • 2007
  • GS E&C had developed construction management system, PMS which is based on EVMS in 1997. Recently, TPMS has developed for effective construction management through applying daily schedule management and JIT on materials, labors, equipments focusing field work. TPMS realizes "Shielding" and "Make-Ready Process" which are the main concept of Lean construction. Through this system, it can manage and plan daily field work, support the field work related material, labor, and equipment planning, and minimizes the non-valuable process. This paper introduces the concept of TPMS, and through established system, it can lead the construction culture and raise the competitive power of construction industry

  • PDF

원자력 통합안전경영시스템을 이용한 요르단연구로사업의 문서관리 (Document Management for Jordan Research and Training Reactor Project by ANSIM)

  • 박국남;최민호;권용세
    • 산업경영시스템학회지
    • /
    • 제39권2호
    • /
    • pp.113-118
    • /
    • 2016
  • Project management is a tool for smooth operation during a full cycle from the design to normal operation including the schedule, document, and budget management, and document management is an important work for big projects such as the JRTR (Jordan Research and Training Reactor). To manage the various large documents for a research reactor, a project management system was resolved, a project procedure manual was prepared, and a document control system was established. The ANSIM (Advanced Nuclear Safety Information Management) system consists of a document management folder, document container folder, project management folder, organization management folder, and EPC (Engineering, Procurement and Construction) document folder. First, the system composition is a computerized version of the Inter-office Correspondence (IOC), the Document Distribution for Agreement (DDA), Design Documents, and Project Manager Memorandum (PM Memo) works prepared for the research reactor design. Second, it reviews, distributes, and approves design documents in the system and approves those documents to register and supply them to the research reactor user. Third, it integrates the information of the document system-using organization and its members, as well as users' rights regarding the ANSIM document system. Throughout these functions, the ANSIM system has been contributing to the vitalization of united research. Not only did the ANSIM system realize a design document input, data load, and search system and manage KAERI's long-period experience and knowledge information properties using a management strategy, but in doing so, it also contributed to research activation and will actively help in the construction of other nuclear facilities and exports abroad.

GPS를 이용한 위치관리시스템 구현 (Implementation of GPS Based Location Management System)

  • 최재명;강희조;이상헌
    • 한국항행학회논문지
    • /
    • 제12권1호
    • /
    • pp.15-21
    • /
    • 2008
  • 본 논문에서는 관리대상자의 위치 및 기타 관련 정보를 위치관리시스템(LMS : Location Management System)에서 항시 감시 및 관리할 수 있는 GPS 기반 위치 인식 단말시스템 및 위치관리시스템을 구현하였다. 구현한 시스템은 PID(Personal Identification Device)의 정보를 전송하기 위한 모듈과 GPS 기반의 위치정보 수집 모듈로 구성된 위치 인식 단말장치 (Mobile HTE : Mobile Home Terminal Equipment)와 Mobile HTE에서 수신된 정보를 인터넷 망을 통하여 위치관리시스템에 전송할 수 있는 단말장치 (HTE : Home Terminal Equipment)를 구현하여 관리대상자의 위치를 관리할 수 있는 위치관리시스템을 설계 하였다.

  • PDF

A REAL-TIME PMIS BASED INDUSTRIAL CONSTRUCTION PROJECT MANAGEMENT SYSTEM

  • Kyusung Lee;Hojeong Song;Jaehyun Choi
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.352-358
    • /
    • 2013
  • As amount of information in construction industry is growing, the role of information system in project management is becoming increasingly important. With the emerging IT application to the advancing construction industry, construction project management system with advanced technology has been progressed vigorously to improve construction productivity and management efficiency. Recently, a web-based Project Management Information System (PMIS) is developed to support decision-making process by efficiently managing project related information generated from various discipline. Many firms are in the process of developing the PMIS system or already have been applied the system to various projects. However, PMIS is still in its early stage of development to be applied at industrial plant construction projects that process management is significantly emphasized for the successful execution of the project. With the complexity of the industrial plant projects, the industry practitioners need to be able to visualize the construction schedule information to manage the project efficiently. This study suggests methodologies for improving PMIS specialized for industrial plant piping construction projects to estimate the baseline schedule and performance measurement more accurately by developing a framework for the piping construction projects. By using this developed system, the researchers expect that piping construction projects will be more efficiently managed on a real-time basis through measuring progress of piping at each and every state of progress milestone and provide management with opportunities to forecast the level of efforts required to execute the remaining work scope in a timely manner

  • PDF

KOMPSAT-2 Fault and Recovery Management

  • Baek, Myung-Jin;Lee, Na-Young;Keum, Jung-Hoon
    • International Journal of Aeronautical and Space Sciences
    • /
    • 제3권2호
    • /
    • pp.31-39
    • /
    • 2002
  • In this paper, KOMPSAT-2 on-board fault and ground recovery management design is addressesed in terms of hardware and software components which provide failure detection and spacecraft safing for anomalies which threaten spacecraft survival. It also includes ground real time up-commanding operation to recover the system safely. KOMPSAT-2 spacecraft fault and recovery management is designed such that the subsequent system configuration due to system initialization is initiated and controlled by processors. This paper will show that KOMPSAT-2 has a new design feature of CPU SEU mitigation for the possible upsets in the processor CPUs as a part of on-board fault management design. Recovery management of processor switching has two different ways: gang switching and individual switching. This paper will show that the difficulties of using multiple-processor system can be managed by proper design implementation and flight operation.