A Study on the Risk Examination of the Unit Price of Public Housing Construction Projects (공공주택공사에서의 도급단가 리스크 규명에 관한 연구)

  • Kim, Soon-Young;Han, Choong-Hee;Baek, Tae-Ryong;Kim, Kyoon-Tai;Lee, Jun-Bok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.2
    • /
    • pp.35-44
    • /
    • 2010
  • Currently, the unit price of public construction projects are not being evaluated appropriately for several reasons. First, the evaluation of the unit price differ per nature of the bidding process and its estimation process. In fact, pricing is determined to meet the total price in turnkey projects and to pass the low bid price deliberation process in unit price projects, and thus, such prices cannot be said to be reasonable prices per public project. After the contract is awarded, however, the prices determined without taking into consideration the characteristic of each bidding process and price estimate process are used for the valuation of progress payment, design changes, and escalation. Furthermore, this is also being applied to other low bid deliberation process as actual public project unit price, thereby affecting other processes as well. In effect, this system increases the risks for both the owner and the bidder who have determined the unit price. This research examines the risk factor and its extent in order to properly manage it in preparation for the future.

Refining and Validating a Two-stage and Web-based Cancer Risk Assessment Tool for Village Doctors in China

  • Shen, Xing-Rong;Chai, Jing;Feng, Rui;Liu, Tong-Zhu;Tong, Gui-Xian;Cheng, Jing;Li, Kai-Chun;Xie, Shao-Yu;Shi, Yong;Wang, De-Bin
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.15 no.24
    • /
    • pp.10683-10690
    • /
    • 2015
  • The big gap between efficacy of population level prevention and expectations due to heterogeneity and complexity of cancer etiologic factors calls for selective yet personalized interventions based on effective risk assessment. This paper documents our research protocol aimed at refining and validating a two-stage and web-based cancer risk assessment tool, from a tentative one in use by an ongoing project, capable of identifying individuals at elevated risk for one or more types of the 80% leading cancers in rural China with adequate sensitivity and specificity and featuring low cost, easy application and cultural and technical sensitivity for farmers and village doctors. The protocol adopted a modified population-based case control design using 72, 000 non-patients as controls, 2, 200 cancer patients as cases, and another 600 patients as cases for external validation. Factors taken into account comprised 8 domains including diet and nutrition, risk behaviors, family history, precancerous diseases, related medical procedures, exposure to environment hazards, mood and feelings, physical activities and anthropologic and biologic factors. Modeling stresses explored various methodologies like empirical analysis, logistic regression, neuro-network analysis, decision theory and both internal and external validation using concordance statistics, predictive values, etc..

An Analysis on the Characteristics of Each Phase's Risk Factors for High-Rise Development Project (초고층 개발사업 추진을 위한 단계별 리스크 요인의 특성 분석)

  • Chun, Young-Jun;Cho, Joo-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.103-115
    • /
    • 2016
  • The 106 buildings of 200 meters' height or greater were completed around the world in 2015 (CTBUH, The Council on Tall Buildings and Urban Habitat). They beat every previous year on record, including the previous record high of 99 completions in 2014. This brings the total number of 200-meter-plus buildings in the world to 1,040, exceeding 1,000 for the first time in history and marking a 392% increase from the year 2000, when only 265 existed. South Korea recorded three completions during 2015 - improving slightly over 2014, in which it had one. This study focused on the fact that high-rise building development project risks have not reduced in Korea in spite of numerous studies and measures. And it attempted to examine whether existing studies and measures have been presented on the basis of the accurate analysis of existing studies and measures and classify and analyze the characteristics of each phase' s risk factors in the hope that its results would be one reference point as to the measure to prevent high-rise building development project risks in the future. A high-rise building development project is the high risk project as compared with the low-rise project. Because a high-rise development project takes long and is very sensitive to the changing environment. Therefore, in order to succeed the project it becomes necessary to effectively manage the risk involved in the process of the high-rise building development project. The result of this study can be used as the guideline to make the risk management system for the high-rise development project.

How to Improve the Competency of Agency CM Companies to Conduct the CM at Risk Projects? (용역형 CM사가 책임형 CM 프로젝트를 수행하기 위해 필요한 역량)

  • Jeon, Myeongsik;Kang, Youngcheol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.44-54
    • /
    • 2021
  • As the CM at Risk market grows recently, designers and CM companies that have been performing agency CM services have been showing their interests to participate in the CM at Risk projects. With the assumption that agency CM companies with a lot of experiences and know-how in the field of construction project management have created the circumstances to enter the CM at Risk market, this study investigates the competencies necessary for the agency CM companies to carry out the CM at Risk projects. The compentencies to run the CM at Risk projects were identified based on the literature review. A survey was conducted to identify the competencies that need to be supplemented first. The survey results revealed that competency related to partner companies, finance and guarantee, risk and claim, and project cost were identified to have a higher level of complementation compared to other competencies. In addition, considering that the level of competency that need to be secured is high, as the level of holding of all competency is on average 76% of the required level, in the beginning, small-scale CM at Risk projects with relatively low risk are mainly carry out, strengthening competency and then increasing the scale is considered more appropriate strategy.

A System Dynamics View of Safety Management in Small Construction Companies

  • Guo, Brian H.W.;Yiu, Tak Wing;Gonzalez, Vicente A.
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.92-96
    • /
    • 2015
  • Due to unique characteristics of small construction companies, safety management is comprised of complex problems (e.g., resources constraints, a lack of formalized management structures, low level of management safety commitment etc.). In order to understand causal interdependencies between safety factors at different system levels (regulation, organization, technical and individual), this paper aims to develop a system dynamics (SD) model of safety management in small construction companies. The purpose of the SD model is to better understand why small construction companies have low level of safety performance. A causal loop diagram (CLD) was developed based on literature, with an attempt to map causal relationships between variables. The CLD was then converted into stock and flow diagram for simulation. Various tests were conducted to build confidence in the model's ability to represent the reality. A number of policies were analyzed by changing the value of parameters. The value of a system dynamics approach to safety management in small construction companies is its ability to address joint effects of multiple safety risk factors on safety performance with a systems thinking perspective. By taking into account feedback loops and non-linear relationships, such a system dynamics model provides insights into the complex causes of relatively poor safety performance of small construction companies and improvement strategies.

  • PDF

How to Sustain Smart Connected Hospital Services: An Experience from a Pilot Project on IoT-Based Healthcare Services

  • Park, Arum;Chang, Hyejung;Lee, Kyoung Jun
    • Healthcare Informatics Research
    • /
    • v.24 no.4
    • /
    • pp.387-393
    • /
    • 2018
  • Objectives: This paper describes an experience of implementing seamless service trials online and offline by adopting Internet of Things (IoT) technology based on near-field communication (NFC) tags and Bluetooth low-energy (BLE) beacons. The services were provided for both patients and health professionals. Methods: The pilot services were implemented to enhance healthcare service quality, improve patient safety, and provide an effective business process to health professionals in a tertiary hospital in Seoul, Korea. The services to enhance healthcare service quality include healing tours, cancer information/education, psychological assessments, indoor navigation, and exercise volume checking. The services to improve patient safety are monitoring of high-risk inpatients and delivery of real-time health information in emergency situations. In addition, the services to provide an effective business process to health professionals include surveys and web services for patient management. Results: Considering the sustainability of the pilot services, we decided to pause navigation and patient monitoring services until the interference problem could be completely resolved because beacon signal interference significantly influences the quality of services. On the other hand, we had to continue to provide new wearable beacons to high-risk patients because of hygiene issues, so the cost increased over time and was much higher than expected. Conclusions: To make the smart connected hospital services sustainable, technical feasibility (e.g., beacon signal interference), economic feasibility (e.g., continuous provision of new necklace beacons), and organizational commitment and support (e.g., renewal of new alternative medical devices and infrastructure) are required.

A Study on the Scale Effort Estimation Model based on Industry Characteristics (산업별 특성에 따른 소요공수 규모 산정 모델 연구)

  • Kwoak, Song-Hae;Park, Koo-Rack;Kim, Dong-Hyun
    • Journal of Digital Convergence
    • /
    • v.14 no.11
    • /
    • pp.233-240
    • /
    • 2016
  • Information system development projects, have a mechanism for many of the costs generated by a variety of risk factors. In general, the probability that the software project of the information system is carried out successfully in the delivery time is very low. This prediction of a formal cost is needed as the most important factor since it can prevent the project from being failed. However, objectivity of most of the project scale calculation during the calculation criteria is insufficient. Further, it is the actual situation that the management of the base line is not properly made during the project. Therefore, in this paper, we propose a model to calculate the number of steps it takes to develop on the basis of a methodology in an attempt to overcome the limitation of being unpractical in the early stage of the information system development project. It is expected to be a tool to estimate the effort and cost required by the information system development business through these convergence proposals model.

Safety Techniques-Based Improvement of Task Execution Process Followed by Execution Maturity-Based Risk Management in Precedent Research Stage of Defense R&D Programs (국방 선행연구단계에서 안전분석 기법에 기반한 수행프로세스의 개선 및 수행성숙도 평가를 활용한 위험 관리)

  • Choi, Se Keun;Kim, Young-Min;Lee, Jae-Chon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.10
    • /
    • pp.89-100
    • /
    • 2018
  • The precedent study stage of defense programs is a project stage that is conducted to support the determination of an efficient acquisition method of the weapon system determined by the requirement. In this study, the FTA/FMEA technique was used in the safety analysis process to identify elements to be conducted in the precedent study stage and a methodology for deriving the key review elements through conceptualization and tailoring was suggested. To supplement the key elements derived from the existing research, it is necessary to analyze various events that may arise from key elements. To accomplish this, the HAZOP technique for safety analysis in other industrial fields was used to supplement the results of kdy element derivation. We analyzed and modeled the execution procedure by establishing input/output information and association with the key elements of the precedent study stage derived by linking HAZOP/FTA/FMEA techniques. In addition, performance maturity was evaluated for performance of precedent study, and a risk-based response manual was generated based on inter-working information with key elements with low maturity. Based on the results of this study, it is possible to meet the performance, cost, and schedule of the project implementation through application of the key elements and procedures and the risk management response manual in the precedent study stage of the defense program.

Proposes the Total Management Model by using Directory Service and through the development HR Solution (Directory Service와 HR 솔루션 개발을 통한 IT 통합 관리 모델 제안)

  • Lee, Sung-jun;Kim, Min-Soo
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2013.05a
    • /
    • pp.684-689
    • /
    • 2013
  • The reality is that many security and administrative issues with the expansion of the IT assets in accordance with the abrupt change in the business environment, most companies today are struggling. Information within an organization is a party through external hackers and viruses that are increasingly intelligent risk, and the risk of internal data spills occur through an unauthorized party and internal information in accordance with the co-operation of the outsourcing company and the employee wants to see a sense of security and due to the frequent project asset outflows the risk is increasing gradually. In this paper, in preparation for such a growing security risk management and the increasing of problems, proposes the Total Management Model by using Microsoft's Directory Service & HR Solution that is an integrated management model that can take low-cost, high-efficiency.

  • PDF

The Development of Risk Management Process Model during Bidding Phase for Success of Oversea Construction Projects (성공적 해외건설사업을 위한 입찰단계의 리스크 관리 프로세스 모델 개발 - 발전 플랜트 EPC 사업을 중심으로 -)

  • Seo, Jae-Pil;Ryu, Han-Guk;Son, Bo-Sik;Choi, Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.4
    • /
    • pp.76-86
    • /
    • 2016
  • Recently, the Contracts of International Construction Business has been decreased from the beginning of 2015 in Korea, although it has been steadily increased until 2014. This trend could be caused by Low-Price Contracts, the lack of Know-how and experience in operating, the poor management of Claims and Low-Profitability in Business. It has been recognized that the qualitative improvement of Business Contacts are necessary for successful Projects. In the Bidding Process, therefore, Experience data as In-House Data and Lessons Learned for projects should be strategically involved to assure riskless offers. Accordingly the Proposal Process are needed to be organized and enhanced by including processes for risks review about technical, marketing and commercial part during the bidding. This paper proposes a Risk Management Process model during Bidding Phase, using Risk Evaluation Method through the project life-cycle. The Concept of Model is to define CSF (Critical Success Factor) in the bidding process and Risk Factors are linked to CSF and Organization based on RAM (Responsibility assignment matrix).