• Title/Summary/Keyword: Looped system

Search Result 25, Processing Time 0.025 seconds

LED Headlamp Thermal Characteristics by Looped Heat Pipe (루프형 히트파이프를 이용한 LED 헤드램프 열적 특성)

  • Noh H.C.;Park K.S.;Kang B.D.;Son S.M.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2006.05a
    • /
    • pp.443-444
    • /
    • 2006
  • The influence of the heat sources on LED junction temperature are Engine room air, Back plate, Electric power device, and so on. LED lamp cooling system is considered to be an important subject fur high light efficiency. Because LED Chip will be problem When LED junction temperature be over $135^{\circ}C$, In this Study, The Looped Heat Pipe System is considered to prevent LED Chip fall. The LHPS is consist of evaporator part, condenser part, heat pipe part. The working fluid of LHPS is HCFC-123. In this study, to prevent LED Chipfall, we study thermal characteristics for Looped Heat Pipe System with LED lamp.

  • PDF

A Study on Loop operation of 154kV Substation Distribution line for Stable power supply (안정적 전력공급을 위한 154kV 변전소 배전선로간 연계운영에 관한 연구)

  • Kim, Kwang-Ho;Son, Myoung-Gwon;Jeong, Jong-Chan
    • Journal of Industrial Technology
    • /
    • v.29 no.B
    • /
    • pp.221-228
    • /
    • 2009
  • For a stable supply of electric power, periodical inspection of the electric facilities and repair of the distribution lines are required. In case of any unexpected accidents, looped operation among distribution lines may be necessary in order to supply electricity through the sound lines, separating the faulted lines. As a result of this study, it was found that normal looped operation became impossible when phase difference of the looped distribution lines is more than 3 degrees compared with the voltage supply of the distribution lines. Therefore, for a stable supply of electric power to Chuncheon, it is judged to be desirable that looped operation of the distribution lines coming from the same substation M. Tr Bank shall be performed in principle and in case of looped operation with the substation of different system, looped operation among the lines shall be performed after voltage regulation of the substation M. Tr Bank, maintaining similar voltages and load supply volume in order to avoid phase difference through checking the operation conditions of each substation M. Tr Banks. And when looped operation among the distribution lines is scheduled, voltage regulation schedule has been established so far by calculating maximum supply volume through the transformer of the substation and the maximum load volume through the distribution lines but in the future, looped operation of the distribution lines shall be carried out by removing voltage difference with regulating tap or load of the surrounding transformers, with giving prior notice to the substation operators.

  • PDF

Unsteady Flow Analysis by the Looped Network Channel Model (폐합형수계 모형에 의한 부정류 해석)

  • Park, Bong-Jin;Lee, Hwan-Ki;Jung, Kwan-Sue
    • Water for future
    • /
    • v.29 no.5
    • /
    • pp.129-138
    • /
    • 1996
  • Loopnet model was developed to simulate unsteady flow in the looped network channel, considering change of the time and space. In this study, the looped solution algorithm was derived and the accuracy and stability of the model was tested. The Gulpo river system was used to calculate the flood water levels considering the hydraulic structures, tidal effect and inflow hydrographs. The result of the simulation showed that the accuracy and stability of this model was reliable. The change of flood water level of the Gulpo River system and the spillway section were not greatly affected by the operation water level of the navigation channel. But this analysis showed that roughness was one of the very important physical factor in changing flood water level.

  • PDF

ANALYSIS OF LOOPED WATER DISTRIBUTION NETWORK

  • Ioan Sarbu
    • Water Engineering Research
    • /
    • v.2 no.3
    • /
    • pp.171-178
    • /
    • 2001
  • There are three methods for analyzing flow and pressure distribution in looped water distribution networks (the loop method, the node method, the element method) taking into consideration hydraulic parameters chosen as unknown. For all these methods the non-linear system of equations can be solved by iterative procedures. The paper presents a different approach to this problem by using the method of variational formulations for hydraulic analysis of water distribution networks. This method has the advantage that it uses a specialized optimization algorithm which minimizes directly an objective multivariable function without constraints, implemented in a computer program. The paper compares developed method to the classic Hardy-Cross method. This shows the good performance of the new method.

  • PDF

Leader-Following Sampled-Data Control of Wheeled Mobile Robots using Clock Dependent Lyapunov Function (시간 종속적인 리아프노프 함수를 이용한 모바일 로봇의 선도-추종 샘플 데이터 제어)

  • Ye, Donghee;Han, Seungyong;Lee, Sangmoon
    • IEMEK Journal of Embedded Systems and Applications
    • /
    • v.16 no.4
    • /
    • pp.119-127
    • /
    • 2021
  • The aim of this paper is to propose a less conservative stabilization condition for leader-following sampled-data control of wheeled mobile robot (WMR) systems by using a clock-dependent Lyapunov function (CDLF) with looped functionals. In the leader-following WMR system, the state and input of the leader robot are measured by digital devices mounted on the following robot, and they are utilized to construct the sampled-data controller of the following robot. To design the sampled-data controller, a stabilization condition is derived by using the CDLF with looped functionals, and formulated in terms of sum of squares (SOS). The considered Lyapunov function is a polynomial form with respect to the clock related to the transmitted sampling instants. As the degree of the Lyapunov function increases, the stabilization condition becomes less conservative. This ensures that the designed controller is able to stabilize the system with a larger maximum sampling interval. The simulation results are provided to demonstrate the effectiveness of the proposed method.

A Protection Algorithm Discriminating Between Internal and External Faults for Wind Farms (풍력발전단지 보호를 위한 내외부 고장 판별 알고리즘)

  • Kwon, Young-Jin;Kang, Sang-Hee
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.56 no.5
    • /
    • pp.854-859
    • /
    • 2007
  • A wind farm consists of many wind generator(WG)s therefore, it is generally a complex power system. A wind farm as a distributed generation(DG) affects utility power system. If a conventional protection schemes are applied, it is difficult to detect faults correctly and the schemes can't provide proper coordination in some cases. This paper presents a protection algorithm for a wind farm which consists of a looped collection circuit. Because the proposed algorithm can distinguish between an internal fault and an external fault in a wind farm, The proposed algorithm can disconnect the faulted section in a wind farm. This algorithm is based on an overcurrent protection technique with the change of the ratio of the output current of a generator to the current of the looped line connected to each generator to collect the each generator's power. In addition, operating time of the algorithm is shortened by using the voltage drop at a generator collection point. The performance of the proposed algorithm was verified under various fault conditions using PSCAD/EMTDC simulations.

Extended inverse impedance method for multiple branches or loops pipeline systems (복합 관수로에서 인버스 임피던스 확장연구)

  • Dongwon Ko;Sanghyun Kim
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.37 no.6
    • /
    • pp.437-446
    • /
    • 2023
  • We propose a transient evaluation scheme using a pressure measurement in a complicate pipeline systems. Conservation of mass and momentum equations in time domain can be transformed into a pressure head and flowrate relationship between upstream and downstream point in frequency domain. The impedance formulations were derived to address measured pressure at downstream to evaluate of flowrate or pressure head at any point of system. Both branched pipeline element and looped pipeline element can be generally addressed in the platform of the basic reservoir pipeline valve system. The convolution of time domain response function with measured pressure head from a downstream point provides flowrate or pressure head response in any point of the designated pipeline system. The proposed method was validated through comparison between traditional method of characteristics and the proposed method in several hypothetical systems.

Oculomotor system characteristic by using MIMIC program (MIMIC 프로그램에 의한 동안계의 특성)

  • 변윤식;박상희
    • 전기의세계
    • /
    • v.30 no.5
    • /
    • pp.291-296
    • /
    • 1981
  • In the paper, in order to get the characteristics of the saccadic and the smooth pursuit movements of the oculomotor systems, a revised stochastic sampled data model suggested by Young et. al. was simulated and analyzed by using the MIMIC language. The results are summerized as follows; (1) The predictability to the sinusoidal inputs increased as the input frequency increased, but at the frequency of 1.0[Hz] the prediction started to decrease. (2) The responses of the system drifted when the system was open-looped. (3) The responses showed the transient state during the first period of the input waves, and then moved into the steady state.

  • PDF

Development of Control Algorithm and Pick & Placer (반도체 소자 Pick &Placer 및 제어 알고리즘 개발)

  • 심성보;김재희;유범상
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2004.10a
    • /
    • pp.1339-1343
    • /
    • 2004
  • This paper presents a development of the control algorithm and Pick & Placer. The Pick & Placer provides a powerful multi-task system that includes both graphical and remote interface. Users can easily set up sorting parameters and record important data including wafer number, data, and operator information. This System sets up a dustproof device and massively machined components to provide an extremely stable sorting environment. Precise resolution and accuracy result from using machine vision, a pneumatic slide drive and close -looped positioning.

  • PDF

Field Application of Least Cost Design Model on Water Distribution Systems using Ant Colony Optimization Algorithm (개미군집 최적화 알고리즘을 이용한 상수도관망 시스템의 최저비용설계 모델의 현장 적용)

  • Park, Sanghyuk;Choi, Hongsoon;Koo, Jayong
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.4
    • /
    • pp.413-428
    • /
    • 2013
  • In this study, Ant Colony Algorithm(ACO) was used for optimal model. ACO which are metaheuristic algorithm for combinatorial optimization problem are inspired by the fact that ants are able to find the shortest route between their nest and food source. For applying the model to water distribution systems, pipes, tanks(reservoirs), pump construction and pump operation cost were considered as object function and pressure at each node and reservoir level were considered as constraints. Modified model from Ostfeld and Tubaltzev(2008) was verified by applying 2-Looped, Hanoi and Ostfeld's networks. And sensitivity analysis about ant number, number of ants in a best group and pheromone decrease rate was accomplished. After the verification, it was applied to real water network from S water treatment plant. As a result of the analysis, in the Two-looped network, the best design cost was found to $419,000 and in the Hanoi network, the best design cost was calculated to $6,164,384, and in the Ostfeld's network, the best design cost was found to $3,525,096. These are almost equal or better result compared with previous researches. Last, the cost of optimal design for real network, was found for 66 billion dollar that is 8.8 % lower than before. In addition, optimal diameter for aged pipes was found in this study and the 5 of 8 aged pipes were changed the diameter. Through this result, pipe construction cost reduction was found to 11 percent lower than before. And to conclusion, The least cost design model on water distribution system was developed and verified successfully in this study and it will be very useful not only optimal pipe change plan but optimization plan for whole water distribution system.