• Title/Summary/Keyword: Long tunnel design

검색결과 177건 처리시간 0.025초

고속도로 터널에 대한 전단면 발파 설계방안 연구 (Design guide for full-face blasting in highway tunnel)

  • 이상돈;최해문;이현구;류창하
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2004년도 춘계학술발표회
    • /
    • pp.930-937
    • /
    • 2004
  • In tunnel blasting, rock damage and overbreak at excavation limits are strongly related to stability of the tunnel and cost for rock support, and also affect to maintenance after tunnel construction. In this study, many field tests and measurements have been carried out in highway tunnels so that discordance between blast design and practical production blasting could be settled and actual methods of over break control could be proposed through the understanding of the problems in existing blasting patterns. Test blasting in tunnel was carried out many times in two tunnel sites. Also, long hole blasting longer than existing blasting pattern was executed for good grade of rock mass whose RMR value is more than 60. Using the results of test blasting, new standard blasting patterns for two lane tunnel were proposed. As a result of profile measurement after blasting, drilling is a major factor of overbreak. And then the methods for minimizing overbreak were adapted in new blasting patterns.

  • PDF

연약암반에서 암반의 특성을 고려한 광산갱도의 최적 설계 (Optimized Design of Mine Span Considering the Characteristics of Rockmass in Soft Ground)

  • 장명환;하태욱;정희선
    • 터널과지하공간
    • /
    • 제28권2호
    • /
    • pp.125-141
    • /
    • 2018
  • 장기적 광산 개발계획을 위하여 광산의 갱도설계는 장비계획, 운반계획, 운영계획 등의 기본이 되므로 매우 중요하다. ${\bigcirc}{\bigcirc}$광산은 생산성 향상에 중점을 둔 갱도설계가 이루어짐으로써 채광계획 변경이 매우 어렵고, 굴착갱도를 유지하기 위한 많은 노력이 필요하였다. 본 연구에서는 암반의 역학적 특성을 고려한 최적갱도를 설계하고 지보계획을 수립하고자 하였다. 이를 위하여 암반의 역학적 변수(팽윤압력, 변형계수, 지압계수)들에 대한 추정, 다양한 현장조사와 분석 등을 수행하였다. 그 결과 roof bolt 등을 활용하여 갱도유지를 하려면 갱도단면 축소 등을 고려할 필요가 있었으며, 현 갱도규격을 유지하기 위해서는 지보재와 지보방법에 대한 다양한 기능적 기술들이 필요할 것으로 분석되었다.

소음 및 진동을 고려한 도심지 내 대단면 수직구 발파설계 사례 -싱가포르 Transmission Cable Tunnel EW2 공구- (Blasting Design for Large Shaft in Urban Area Considering Noise and Vibration -Singapore Transmission Cable Tunnel EW2-)

  • 김지연;이효;김도훈;고태영;이승철
    • 화약ㆍ발파
    • /
    • 제31권1호
    • /
    • pp.55-63
    • /
    • 2013
  • 싱가포르 전력구 터널 건설공사는 싱가포르 내의 전력수요 증가에 대응하기 위해 지하에 400kV의 고압 전기 케이블 등 송전설비 설치를 위한 터널을 건설하는 공사이다. 본 전력구는 총연장 35km의 터널로서 18.5km의 North-South Line의 3개 공구 (NS1, NS2, NS3)와 16.5km의 East-West Line의 3개 공구 (EW1, EW2, EW3)로 나누어 건설된다. 총 6개의 공구 중 SK건설은 EW2 공구와 NS2 공구를 수주하여 현재 시공중이다. 본 프로젝트의 과업 중 지상과 고압 송전 케이블 터널을 연결하는 수직구가 공구당 3~4개소가 있으며, 시공 중에는 TBM 발진용으로 활용된다. 지하 전력구는 싱가포르 내 도심 한복판을 가로질러 건설되며, 수직구 또한 대부분 도심지 내에 있어 수직구 굴착 시 발파 효율의 극대화와 동시에 싱가포르 소음 및 진동 기준을 만족하는 최적의 발파 설계가 요구된다. 싱가포르 전력구 터널 EW2 공구의 수직구 발파는 현지 허용 진동속도기준을 준수하고 국내의 우수한 발파 설계기술을 적용하여 설계되었으며 본 설계를 통하여 국내의 우수한 발파 설계 및 시공 기술을 전파할 좋은 기회가 될 것으로 기대된다.

다목적 복층터널의 기능전환과 지하수위 변화에 따른 거동분석 (Behavior of double deck tunnel due to feature change and variation of ground water table)

  • 박노현;김호종;신종호
    • 한국터널지하공간학회 논문집
    • /
    • 제18권6호
    • /
    • pp.581-591
    • /
    • 2016
  • 최근 사회기반시설의 투자효율성을 높이기 위하여 평상 시 도로터널로 운영되지만 홍수 시 수로로 이용되는 수로 도로 다목적 터널의 계획이 시도되고 있다. 이러한 다목적 터널은 수로터널로의 이용이 한시적이기 때문에 내수압과 지하수위가 일정하지 않아 터널 내부와 외부의 압력변화가 상당할 수 있다. 특히 지하수위 아래에 건설 된 다목적 터널의 경우 장기간 운영 중에 발생하는 계절적 압력변화는 터널에 반복하중으로 작용하여 구조물과 인접지반의 열화로 이어질 가능성이 있다. 본 연구에서는 다목적 터널의 외부 및 내부 수위조건에 따라 발생할 수 있는 구조물의 거동특성을 모형실험 및 수치해석을 통하여 조사하였다. 그 결과 수위변화로 인한 터널 거동의 주 원인은 부력이며, 터널 내부 및 외부의 반복적인 수위변화는 터널 주변지반의 이완영역을 확대시키는 것으로 나타났다. 따라서 다목적 터널의 설계 시 수위변화에 따른 영향검토가 필요하며 경우에 따라 저항성을 유지시킬 수 있는 대책의 검토가 필요하다.

국내 최초 소형차 전용 도심지 대심도 복층터널 설계 사례 (A Case Study for the 1st Double-level Tunnel for Light vehicle in Urban Area in Korea)

  • 김경훈;최준동;전덕찬;신일재;심동현
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2010년도 추계 학술발표회
    • /
    • pp.1302-1313
    • /
    • 2010
  • The west express way is notorious for extremely heavy traffic area in the west of Seoul, South Korea. Hence, the city government recently initiated a new underground BTO (Build-Transfer-Operate) road project to solve traffic congestion and a high construction cost. The proposed underground express road being designed is the first double-level tunnel ever designed in South Korea and using Conventional tunnelling method (NATM). A total length of tunnel for light vehicles is 10.91km long including both open cut structures and concrete lining with middle-deck in bored tunnel. There are also 4 ventilation shafts for ventilation and evacuation on emergency. Many design issues had been aroused during the preliminary design phase and detail design phase is currently going on. This paper discusses design focuses including excavation methods, ground water issues, a deck slab installation, and a construction cost etc. for the double level road tunnel design of urban area.

  • PDF

Reliability analysis of tunnels with consideration of the earthquakes extreme events

  • Azadi, Mohammad;Ghasemi, S. Hooman;Mohammadi, Mohammadreza
    • Geomechanics and Engineering
    • /
    • 제22권5호
    • /
    • pp.433-439
    • /
    • 2020
  • Tunnels are one of the most important constructions in civil engineering. The damage to these structures caused enormous costs. Therefore, the safe and economic design of these structures has long been considered. However, both applied loads on the tunnels as well as the resistance of the structural members are naturally uncertain parameters, hence, the design of these structures requires considering the probabilistic approaches. This study aims to determine the load and resistant factors of lining tunnels concerning the earthquake extreme events limit state function. For this purpose, tunnels that have been designed according to the previous design codes (AASHTO Tunnel LRFD 2017) and using reliability analysis, the optimum reliability of these structures for different loading scenarios is determined. In this paper, the tunnel is considered circular. Finally, the proper load and resistance factors are calculated corresponding to the obtained target reliability. Based on the performed calibration earthquake extreme events limit state function, the result of this study can be recommended to AASHTO Tunnel LRFD 2017.

RPUM 강관의 효율적인 설계기법에 관한 연구 (A Study on Efficient Design Technique of RPUM Steel Pipes)

  • 김정수;박태순
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2006년도 추계학술대회 논문집
    • /
    • pp.1354-1363
    • /
    • 2006
  • Until now, NATM(New Austrian Tunneling Method) has been increasingly developed based on concept of making use of ground as support. Also, NATM in its essence is a method of risk based on monitoring behaviour of tunnel. This Monitoring is irreplaceable for the quality construction of tunnel, and safety of tunnel itself. Pre-reinforcement ahead of a tunnel face using long steel pipes in NATM, known as the RPUM(Reinforced Protective Umbrella Method), is the auxiliary method to sustain the stability of a tunnel face and reduce the ground settlements. Since design of RPUM has been dependent on the empirical design, it is necessary to develop the improved design methods. In this study, to understand behaviour of steel pipes, it is monitored displacement of tunnel crown, axial force of rock bolt, displacement and axial stress of steel pipes. Also, in order to clarify the mechanical behaviour and RPUM effects, 3-Dimensional numerical analysis is performed that various cases of different parameter combinations including original length and repeated length of steel pipes, installation width and angle, repeated length of steel. In the results of comparison monitoring with analysis, it is suggested more economical and efficient design technique than empirical design methods.

  • PDF

고수압 초장대 해저터널에 관한 연구 (The review about ultra long subsea tunnel design under high water pressure)

  • 전덕찬;김기림;홍의준;김찬동;이영준;홍철화
    • 한국터널지하공간학회 논문집
    • /
    • 제19권6호
    • /
    • pp.829-843
    • /
    • 2017
  • 최근 국가간 대륙간의 정치 경제 문화의 통합에 따른 여객 및 물류수송의 증가로 인해 이를 수용할 수 있는 교통 시스템 건설을 위한 필수적 요소 중 하나인 해저터널의 필요성이 대두됨에 따라 해저터널의 연장이 점차 증가되는 추세에 있다. 하지만, 현재 연장 5 km 이상의 해저터널은 19개가 건설되어 있으나, 연장 50 km 이상의 해저터널 시공 및 운영사례는 전무한 실정이다. 우리나라의 경우에는 한 중 해저터널, 한 일 해저터널, 호남~제주 해저터널 등 연장 50 km 이상의 해저터널이 계획 중에 있으며, 지역특성상 국가간 연결터널이 대다수로서, 해저터널 건설에 대한 기술선점의 중요성이 더욱더 크게 대두되고 있다. 이러한 해저터널은 대부분 초장대의 고수압 조건에 건설됨에 따라, 초장대 터널에서의 환기 및 방재기술, 고수압 조건에서의 구조적 안정성 확보기술, 열차고속화에 의한 공력저감기술 등 육상터널과는 다른 새로운 개념의 건설기술들이 종합적으로 요구되나, 유로터널 등 기존사례의 기술수준 반영 시에는 과도한 건설비와 건설기간이 소요된다. 이에, 본 논문에서는 호남~제주 구간에 대한 가상설계를 통하여 현재 설계 및 시공사례가 없는 고수압(최대수심 160 m), 초장대(총 연장 108 km), 고속철도(설계속도 350 km) 터널의 구조적 안정성 확보, 시공 중 및 운행 시 효율적 환기 방재 시스템 확립 등 다양한 문제점들에 대한 합리적인 해결방안을 제시하였다.

Seismic applicability of a long-span railway concrete upper-deck arch bridge with CFST rigid skeleton rib

  • Shao, Changjiang;Ju, Jiann-wen Woody;Han, Guoqing;Qian, Yongjiu
    • Structural Engineering and Mechanics
    • /
    • 제61권5호
    • /
    • pp.645-655
    • /
    • 2017
  • To determine the seismic applicability of a long-span railway concrete upper-deck arch bridge with concrete-filled steel-tube (CFST) rigid skeleton ribs, some fundamental principles and seismic approaches for long-span bridges are investigated to update the design methods in the current Code for Seismic Design of Railway Engineering of China. Ductile and mixed isolation design are investigated respectively to compare the structural seismic performances. The flexural moment and plastic rotation demands and capacities are quantified to assess the seismic status of the ductile components. A kind of triple friction pendulum (TFP) system and lead-plug rubber bearing are applied simultaneously to regularize the structural seismic demands. The numerical analysis shows that the current ductile layout with continuous rigid frame approaching spans should be strengthened to satisfy the demands of rare earthquakes. However, the mixed isolation design embodies excellent seismic performances for the continuous girder approaching span of this railway arch bridge.

Unlined Tunnel 공법 지보재의 설계 및 시공 기준 고찰 (A Study on the Design/construction Standard of Unlined Tunneling Method)

  • 서영화;김성구;나승훈
    • 한국지반공학회:학술대회논문집
    • /
    • 한국지반공학회 2002년도 가을 학술발표회 논문집
    • /
    • pp.121-134
    • /
    • 2002
  • Tunneling is a very dangerous and expansive work. Especially, the concrete lining works need many long hours and much cost. As an alternative, the unlined tunneling methods including NMT have been developed in various country. These methods have advantages in cost, time and quality. In Korea, many considerations have been conducted to apply the unlined tunneling method in comparatively good rock. Since primary reinforcements play the role of the final supporting system in unlined tunnels, the initial stiffness and long term durability of reinforcements are very important for tunnel safety. To establish the reinforcements standard suitable to Korea, we investigated the foreign standards and construction cases, comparing geological and construction conditions of foreign land and Korea. As the result, we have proposed the standard of primary supporting system for unlined tunnel in aspects of material, design, construction and quality control etc.

  • PDF