The process of determining whether, when, where and how to intervene, of deciding on optimum allocation of resources and minimizing the cost is a very complex problem: different track sections tend to behave differently under the effects of loading; decision-making processes for maintenance work are closely interrelated technically and economically; decision-making for maintenance plans is based on a large quantity of technical and economic information, extensive knowledge and above all experience. For that reason, It is considered very important to develope objective and computer-aided decision-making support system for track maintenance plan. On this paper, we made a survey of the state-of-art of decision-making support systems for track maintenance which were developed and used abroad and reviewed requirements of system and present the plan of develope decision-making support system for track maintenance appropriate to local condition.
International Journal of Reliability and Applications
/
v.18
no.2
/
pp.21-44
/
2017
Accelerated life tests (ALTs) are frequently used in manufacturing industries to evaluate the reliability of products within a reasonable amount of time and cost. Test units are subjected to elevated stresses which yield quick failures. Most of the previous works on designing ALT plans are focused on tests that involve a single stress. Many times more than one stress factor influence the product's functioning. This paper deals with the design of optimum modified ramp-stress ALT plan for Burr type XII distribution with Type-I censoring under two stress factors, viz., voltage and switching rate each at two levels- low and high. It is assumed that usage time to failure is power law function of switching rate, and voltage increases linearly with time according to modified ramp-stress scheme. The cumulative exposure model is used to incorporate the effect of changing stresses. The optimum plan is devised using D-optimality criterion wherein the ${\log}_{10}$ of the determinant of Fisher information matrix is maximized. The method developed has been explained using a numerical example and sensitivity carried out.
Proceedings of the Earthquake Engineering Society of Korea Conference
/
2006.03a
/
pp.589-596
/
2006
Torsional behavior of eccentric structures under seismic loading may cause stress and/or strain concentration, which result in the failure of the structures in an unexpected manner. This study propose how to assess the seismic capacity of plan-irregular RC wall structures. The seismic capacities ate expressed in terms of lateral displacement capacity of each wall. The seismic demands for displacement are assessed by so called displacement-based design approach. Those seismic capacity and demands are combined D-R coordinate, which is made up of lateral displacement and rotation angle. To expand these concepts to the inelastic region the adaptive modal analysis method is used. In addition, the failure mechanisms including torsional failure are defined on D-R coordinate. Finally, seismic assessments of two 3-story plan-irregular wall structures ate presented.
Journal of Korean Institute of Industrial Engineers
/
v.38
no.2
/
pp.157-172
/
2012
In most container terminals, containers are piled up and stored in a yard in order to utilize the space efficiently. Hence, it requires unproductive container-handling operations to retrieve a container that is not placed on the top of a container stack. As a result, to streamline container-loading operations by which containers are transferred from a yard to a vessel, it is necessary to pre-marshal (i.e., shuffle in advance) containers in accordance with container-loading plan. We propose $A^*$ algorithm to find the optimal container-relocation sequence for the intra-bay container pre-marshalling problem. To work out the heuristic estimate for the proposed $A^*$ algorithm, we introduce the container rearrangement problem and obtain the lower bound of the length of the optimal relocation sequence. The performance of the algorithm is validated extensively by the numerical experiments on the problem instances that are given in the previous studies and generated randomly with various parameters.
Agriculture reservoirs need a systematic approach that can control water purity and water improvement. The area under study, Bunam Lake exceeds the agricultural water standard level due to contamination from the upper stream. When the Taean Enterprise City was planned, the water quality improvement plan was applied to minimize the environmental change. However, in order to continuously maintain the water quality in the Bunam Lake, it was essential to apply the Total Pollution Load Management System (TPLMs). In order to achieve the targeted water quality in the Bunam Lake, standard flow rates and targeted water quality levels were applied to obtain the loading capacity which is as follows : BOD 1,891.2 kg/d, T-N 1,945.7 kg/d, T-P 131.7 kg/d. Also, the regional development load was calculated as, BOD 1,083.6 kg/d, T-N 942.2 kg/d, T-P 61.8 kg/d, which is required to be deceased :- by BOD 378.4 kg/d, T-N 198.9 kg/d, T-P 31.6 kg/d in order to safely achieve the targeted water quality in the Bunam Lake.
Journal of The Korea Institute of Healthcare Architecture
/
v.14
no.2
/
pp.53-64
/
2008
This study is the architectural planning of 5 distribution supporting facilities for traditional herbal medicine cultivated in the rural areas. The main function of the facility consists of storage, pre-treatment/processing, loading/unloading and the assistant function consists of inspection, office, exhibition/sale, technical equipment etc. The planning shows the modular plan and the section plan of the storage space reflecting the shape and size of storage container, the action radius of carrier and the possibilities of space lease. The total floor area of the storage is 3,192$m^2$ consisting of 27 space. The total floor area of the pre-treatment/processing is 1,488$m^2$ consisting of 7 space. The total floor area of the loading/unloading is 329$m^2$ consisting of 4 space. The total floor area of each facility storage is 8,284$m^2$ including of public space 2,170$m^2$. Also this planning shows the preliminary design, "fundamental model design" for 5 rural government BTL project. Therefore, this result of planning will be the guidelines of the RFP(Request For Proposal) for the private sector company interested in this BTL project.
Journal of Dental Rehabilitation and Applied Science
/
v.18
no.2
/
pp.127-144
/
2002
There is an increasing appreciation of the vital role that biomechanics play in the performance of oral implant. The aim of this article is to provide some basic principles that will allow a clinician to formulate a biomechanically valid treatment plan. However, at this point in the history of oral implantology, the clinician should realize that we do not know enough to provide absolute biomechanical rules that will guarantee success of all implants in all situations. To examine the biomechanical questions, one must begin with an analysis of the distribution of biting forcess to implants. Related topics, such as stress transfer to surrounding tissues and interrelationships between bone biology and mechanical loading are major subjects, deserving a separate discussion. Once rigid fixation, angulation, crestal bone level, contour, and gingival health are achieved, stress beyond physiologic limits is the primary cause of initial bone loss around implants. The restoring dentist has specific responsibilities to reduce overload to the bone-implant interface. These include proper diagnosis, leading to a treatment plan designed with adequate retention and form, and progressive loading to improve the amount and density of bone and further reduce the risk of stress beyond physiologic limits. The major remaining factor is the development of occlusal concept in harmony with the rest of the stomagnetic system.
Purpose - Loading can decrease the productivity due to the possibility of carrying out with the opposite order of storage in container terminal. When the container is to be taken out, it is needed to move the container stacked upon the container to be carried out to other place temporarily. It is called as rehandling. Remarshalling, with the loading plan, is the arranging the containers before the ship arrives in order to avoid the rehandling during the carrying out. The present study tried to find out the factors affecting the efficiency when building the remarshalling plan with the utilization of neighboring storage space as a outer slot, and analyzed the efficiency of several remarshalling algorithms with the combination of those factors. Research design, data and methodology - The present study used, when the remarshalling plan is prepared for utilizing the outer slot, the simulation methods in order to compare the efficiency of the remarshalling algorithms which made with the factors affecting the efficiency. The factors affecting the efficiency are the method of making the child node, method of arrangement, and possibility of application of FIX. In order to analyze the affecting factors on the efficiency, several algorithms are prepared with the combination of production of the child node and the arrangement method with the availability of FIX application. With this algorithm, the effect of the factors on the efficiency after building up of remarshalling plan with the target on the bay with 10 rows, 8 columns, and 10 indices. Results - The method of rearrangement and making of a child node as the factor affecting the efficiency of remarshalling utilization of the outer bay were studied. It is efficient to combine the method of making a child node with MCS in order to reduce the number of moving the containers. For reducing the time in carrying out, it was found that all arrangement methods should be combined with RCS for the efficiency. The result of experiment shows the application of FIX with good result in case of succession ratio. In addition, when FIX was not applied, all of the most combinations resulted in short time in remarshalling. As a result, it can be concluded that the algorithm with proper combination of making the child node and the arrangement can increase the job efficiency based on the importance. Conclusion - The present study suggested and analyzed the algorithms with the combination of the arrangement method, the making of child node, and FIX. It is needed to develop the algorithm to judge the possibility whether the best remarshalling plan can be built or not within the bay in order to find a better method between the two cases such as within the bay and outer the bay. As a method for extending the study on the factors affecting the efficiency, it is possible to find out the way to build the remarshalling plan within the permitted time under any storage situation.
The aims of this study are the characterization of runoff from nonpoint source, the analysis of the pollutant loads and an establishment of a management plan for nonpoint source of Okcheon. For this purpose the basin of the stream So-okcheon was selected to the investigated. During the period from May 29 to July 21 in 2003, the water automatic sampler system has been installed in Okkagkyo and parameters such as SS, COD, TOC, TP and TN were analyzed. The pollutants of nonpoint source seem to be washed out along the stream water in the beginning of rainfall, remain in water and cause the stream pollution. The runoffs during heavy rainfall, especially, much higher concentration of SS than those during dry period. With respect to the annual loading of pollutants of the nonpoint source, the COD was 124 ton/yr, TOC 396 ton/yr, TN 1,429 ton/yr and TP 4.2 ton/yr in the year 2002. With respect to the pollutants loading of the nonpoint source, the COD was 375 ton/yr(95% of the total COD loading of 394 ton/yr), TOC 844 ton/yr(96% of the tatal TOC loading of 876 ton/yr), TN 1,985 ton/yr(96% of the total TN loading of 2,062 ton/yr) and TP 37.1 ton/yr(92% of the total TP loading of 40.3 ton/yr) in the year 2003.
Milyanggang mid-watershed is located in downstream of Nakdong river basin. The pollutants from that watershed have an direct effect on Nakdong river water quality and it's control is important to manage a water quality of Nakdong river. A target year of Milyanggang mid-watershed water environment management plan is 2013. To predict a water quality at downstream of Milyang river, we have investigated and forecasted the pollutant source and it's loading. There are some plan to construction the sewage treatment plants to improve the water quality of Milyang river. Those are considered on predicting water quality. As results, it is shown that the population of Milyanggang mid-watershed is 131,857 and sewerage supply rate is 62.2% and the livestock is 1,775.300 in 2006. It is estimated that the population is 123,921, the sewerage supply rate is 75.5% in 2013. The generated loading of BOD and TP is 40,735 kg/day and 2,872 kg/day in 2006 and discharged loading is 11,818 kg/day and 722 kg/day in 2006 respectively. Discharged loadings were forecasted upward 1.0% of BOD and downward 2.7% of TP by 2013. The results of water quality prediction of Milyanggang 3 site were 1.6 mg/L of BOD and 0.120 mg/L of TP in 2013. It is over the target water quality at that site in 2015 about 6.7% and 20.0% respectively. Consequently, there need another counterplan to reduce the pollutants in that mid-watershed by 2015.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.