• Title/Summary/Keyword: Load-duration curve

Search Result 128, Processing Time 0.018 seconds

Application of Web-based Load Duration Curve System to TMDL Watersheds for Evaluation of Water Quality and Pollutant Loads (수질오염총량제도 유역의 수질 및 부하량 평가를 위한 웹기반 LDC 시스템의 적용)

  • Kang, Hyunwoo;Ryu, Jichul;Shin, Minhwan;Choi, Joongdae;Choi, Jaewan;Shin, Dong Seok;Lim, Kyoung Jae
    • Journal of Korean Society on Water Environment
    • /
    • v.27 no.5
    • /
    • pp.689-698
    • /
    • 2011
  • In South Korea, Total Maximum Daily Load (TMDL) has been enforced since 2004 to restore and manage water quality in the watersheds. However, the appraisal of TMDL in South Korea has lots of weaknesses to establish the plan for recovery of water quality because it just evaluates the target water quality during the particular flow duration interval. In the United States, Load Duration Curve (LDC) method bas been widely used in the TMDL to evaluate the water quality and pollutant loads considering variation of stream flow. In a recent study, web-based Load Duration Curve system was developed to create the LDC automatically and provide the convenience of use. In this study, web-based Load Duration Curve system was applied in the Gapyeongcheon watershed using the daily flow and 8-day interval water quality data, and Q-L Rating Curve was used to evaluate the water quality and pollutant load in the watershed, also. As a result of study, water quality and pollutant load in Gapyeongcheon watershed were met with water quality standard and allocated load in the all flow durations. Web-based Load Duration Curve system could be applied to the appraisal of South Korean TMDL because it can be used to judge the impaired flow duration and build up the plan of load reduction, and it could enhance the publicity. But, web-based Load Duration Curve system should be enhanced through addition of load assessment tools such as Q-L rating curve to evaluate water quality and pollutant load objectively.

Applicability of Load Duration Curve to Nakdong River Wateished Management (낙동강 유역관리를 위한 부하량 유황곡선의 적용 가능성)

  • Han, Suhee;Shin, Hyun Suk;Kim, Sangdan
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.5
    • /
    • pp.620-627
    • /
    • 2007
  • In this study a general analysis method for watersheds with the entire runoff conditions and corresponding water quality is proposed and its applicability based on the currently available information is investigated. Using the 8-day-interval data set of runoff and water quality observed by Nakdong River Environment Research Center, the flow duration curve and discharge-load relation curve for each unit watershed are established, then the load duration curve is finally constructed. This paper discusses how the load duration curve can be used in the assessment of TMDL. The entire Nakdong river watershed is also divided into prior managing areas of point sources or non-point sources in a way of general management. It is thought that LDC can be a great tool for visualizing overall probabilities of current water quality and thus for the TMDL management.

Development and Application of Coliform Load Duration Curve for the Geum River (금강에 대한 대장균 부하 지속곡선의 개발 및 적용)

  • Kim, Geonha;Yoon, Jaeyoung
    • Journal of Korean Society on Water Environment
    • /
    • v.21 no.5
    • /
    • pp.516-519
    • /
    • 2005
  • An useful protocol coiled load duration curve methodology to estimate contaminant loading to a river on an exceedance probability scale was developed in this research. The technique was further applied to estimate total coliform loading to the Geum River, using the daily mean flow rate and total coliform concentration data during January, 1996 and July, 2004 for the Gongju where an automated monitoring station is located. Drought flow of the Gongju (=50.3 cms) was equivalent to 40% on an exceedance probability scale. Load duration curve for total coliform loading at the Gongju was constructed. Standard duration curve was constructed with the water quality criteria for the class 2 (total coliform concentration = 1000 MPN/100 mL). By plotting load duration curve with standard duration curve, it could be revealed that water quality do not meet the desired water quality for 47% on an exceedance probability scale. If linearity between flow rate and coliform concentration is assumed, it can be interpretated that water quality exceeds desired criteria when average mean flow rate is over 51 cms.

A Study on a Methodology of Determining an Appropriate Load Power Factor Effectively by the Use of Reactive Power Sensitivity and Load Duration Curve (무효전력 민감도와 부하지속곡선을 활용한 적정 부하역률의 효과적인 산정 기법에 관한 연구)

  • Lee, Byung Ha;Hwang, Sung-Ho
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.12
    • /
    • pp.1782-1790
    • /
    • 2012
  • In this paper, a methodology to use load duration curve and the reactive power factor sensitivity of generation cost is proposed for analyzing the effects of load power factor effectively. A great deal of cases of power systems are classified into several patterns according to the characteristics using load duration curve, and the overall effects of load power factor are assessed by integrating the analysis results of load power factor in all the patterns. The reactive power sensitivity of generation cost and the integrated costs such as generation cost, investment cost, voltage variation penalty cost and CO2 emission cost are used for determining an appropriate load power factor. A systematic procedure for effective analysis of load power factor is presented. It is shown through the application to the practical power system of KEPCO(Korea Electric Power Corporation)that the effects of load power factor can be analyzed effectively using load duration curve and reactive power factor sensitivity.

Assessment of the Water Quality of Jungnang Stream by Flow Conditions Using Load Duration Curve (부하지속곡선을 이용한 중랑천의 유량 조건별 수질특성 평가)

  • Choi, Kyung-Wan;Shin, Kyung-Yong;Lee, Hyung-Jin;Jun, Sang-Ho
    • Journal of Environmental Health Sciences
    • /
    • v.38 no.5
    • /
    • pp.438-447
    • /
    • 2012
  • Objective: The objective of this study was to suggest a method through which load duration curve was used to assess the achievement of water quality targets in accordance with the criteria for pollutant load depending on flow rate variation. Methods: The stage-discharge curve and flow duration curve of Jungnang Stream were deduced. Using water quality targets and measurement of the stream, the flow duration curve was also drawn. Based on these, the feasibility of achievement of water quality targets in respect to flow rate was assessed. Results: In terms of the load duration curve of the stream, it was observed that excess of criteria for concentrations of $BOD_5$, $COD_{Mn}$ and SS frequently occurred. On the other hand, when the flow rate was low, the concentrations of T-N and T-P exceeded the criteria. Conclusions: Through the load duration curve, the overall water quality of Jungnang Stream was understood. When the flow rate is high, management of point source of $BOD_5$, $COD_{Mn}$ and SS is needed to achieve water quality targets for Jungnang Stream. On the other hand, when the flow rate is low, the management of non-point source T-N and T-P is necessary to attain the water quality goal.

Development and Application of Coliform Load Duration Curve for the Geumho River (금호강 유역의 대장균 부하지속곡선 개발 및 적용)

  • Jung, Kang-Young;Im, Tae-Hyo;Kim, Gyeong-Hoon;Lee, In-Jung;Yoon, Jong-Su;Heo, Seong-Nam
    • Journal of Korean Society on Water Environment
    • /
    • v.28 no.6
    • /
    • pp.890-895
    • /
    • 2012
  • Duration curves describe the percentage of time that a certain water quality (total/fecal coliform (=TC/FC)) or discharge is exceeded. The curves methodology are usually based on daily records and are useful in estimating how many days per year and event will be exceeded. The technique was further applied to estimated TC/FC loading to the Geumho River, using the daily mean flow rate and TC/FC concentration data during January, 2001 and December, 2011 for the Geumhogang6 (=Seongseo water level station) where an automated monitoring station is located in Gangchang-bridge. Low flow of the Seongseo (=11.1 cms) was equivalent to 75.3% on an exceedance probability scale. Load Duration curve for TC/FC loading at the Seongseo was constructed. Standard load duration curve was constructed with the water quality criteria for class III (TC/FC concentration = 5000/1000 CFU/ 100 mL). By plotting TC/FC observed load duration curve with standard load duration curve, it could be revealed that water quality do not meet the desired water quality for 68.8/11.2% on an exceedance probability scale. IF linear correlation between flow rate and coliform concentration is assumed, it can be interpreted that water quality exceed desired criteria when daily average flow rate is over 11.9/109.9 cms.

Application of the Load Duration Curve (LDC) to Evaluate the Achievement Rate of Target Water Quality in the Han-River Watersheds (부하지속곡선(Load Duration Curve; LDC)을 이용한 한강수계 오염총량관리 목표수질 평가방법 적용 방안)

  • Kim, Eunkyoung;Ryu, Jichul;Kim, Hongtae;Kim, Yongseok;Shin, Dongseok
    • Journal of Korean Society on Water Environment
    • /
    • v.31 no.6
    • /
    • pp.732-738
    • /
    • 2015
  • Water quality in four major river basin in Korea was managed with Total Maximum Daily Load (TMDL) System. The unit watershed in TMDL system has been evaluated with Target Water Quality (TWQ) assessment using average water quality, without considering its volume of water quantity. As results, although unit watershed are obtained its TWQ, its allocated loads were not satisfied and vice versa. To solve these problems, a number of TWQ assessments with using Load Duration Curve (LDC) have been studied at other watersheds. The purpose of this study was to evaluate achievement of TWQ with Flow Duration Curve (FDC) and Load Duration Curve(LDC) at 26 unit watersheds in Han river basin. The results showed that achievement rates in TWQ assessment with current method and with LDC were 50~56 % and 69~73%, respectively. Because of increasing about 20% of achievement rates with using LDC, the number of exceeded unit watershed at Han river Basin was decreased about 4~6 unit watersheds.

Reliability Evaluation of Distributed Generation and Distribution System Using Load Duration Curve (Load Duration Curve를 이용한 분산전원과 배전계통의 신뢰도 산출)

  • Bae, In-Su;Kim, Jin-O
    • The Transactions of the Korean Institute of Electrical Engineers A
    • /
    • v.54 no.11
    • /
    • pp.518-524
    • /
    • 2005
  • This paper presents an analytical method for the reliability evaluation of distribution system, including the distributed generations. Unlike the large sized generations of transmission system, the distributed generations have complexities in analyzing and determining the operation. In the process of evaluate reliability, it can be shown that the analytical method is simpler than the Monte-Carlo simulation and the method using Load Duration Curve model is more accurate than that using peak load model. The modeling of distributed generation to analysis distribution system reliability using LDC is proposed in this Paper, and is compared with the MCS method as a result of case studies.

Conversion Function and Relationship of Loss of Load Expectation Indices on Two Kinds of Load Duration Curve (두 종류의 부하곡선에 관한 공급지장시간기대치(LOLE)의 상호 변환관계성)

  • Lee, Yeonchan;Oh, Ungjin;Choi, Jaeseok;Cha, Junmin;Choi, Hongseok;Jeon, Donghun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.3
    • /
    • pp.475-485
    • /
    • 2017
  • This paper develops a conversion function and method transforming from daily peak load curve used $LOLE_D$ [days/year] to hourly load curve used $LOLE_H$[hours/year]and describes relationship between $LOLE_D$ [days/year] and $LOLE_H$ [hours/year]. The indices can not only be transformed just arithmetically but also have different characteristics physically because of using their different load curves. The conversion function is formulated as variables of capacity and forced outage rate of generator, hourly load daily load factor and daily peak load yearly load factor, etc. Therefore, the conversion function (${\gamma}={\varphi}$(.)) can not be simple. In this study, therefore, the function is formulated as linear times of separated two functions. One is an exponential formed conversion function of daily load factor. Another is formulated with an exponential typed conversion function of daily peak load yearly load factor. Futhermore, this paper presents algorithm and flow chart for transforming from $LOLE_D$[days/year] to $LOLE_H$[hours/year]. The proposed conversion function is applied to sample system and actual KPS(Korea Power System) in 2015. The exponent coefficients of the conversion functions are assessed using proposed method. Finally, assessment errors using conversion function for case studies of sample system and actual system are evaluated to certify the firstly proposed method.

An Analytic Algotithm to Estimate Expected Generation and Marginal Costs (발전 및 한계비용의 해석적 추정법에 관한 연구)

  • 박영문;서보혁
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.31 no.7
    • /
    • pp.1-10
    • /
    • 1982
  • This paper derives the algorithm to estimate the operating cost, its marginal cost, and the reliability indices for the long term planning of power system. Treating the load duration curve and the system in the stochastic sense takes the place of the inverted load duration curve, effective load duration curve, and the numerical integration in the conventional methods. The time and accuracy of computation are substantially improved due to the fact that all expressions are represented by simple analytic form instead of the existing recursive form.

  • PDF