• Title/Summary/Keyword: Load Monitoring

Search Result 1,001, Processing Time 0.036 seconds

Implementation of Smart Devices and Applications for Monitoring the Load Power of Industrial Manufacturing Machine (산업용 생산 장비의 부하 전력 모니터링을 위한 스마트 디바이스와 애플리케이션의 구현)

  • Wahyutama, Aria Bisma;Yoo, Bongsoo;Hwang, Mintae
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.26 no.3
    • /
    • pp.469-478
    • /
    • 2022
  • This paper contains the results of developing smart devices and applications to monitor the load power of the industrial manufacturing machine and evaluate its performance. The smart devices in this paper are divided into two functionalities, which are collecting load power along with operating environment data of industrial manufacturing machines and transmitting the data to servers. Load power data collected from the smart devices are uploaded to MariaDB inside the Amazon Web Service (AWS) server. Using the RESTFul API, the uploaded power data can be retrieved and shown on the web and mobile application in the form of a graph to provide monitoring capability. To evaluate the performance of the developed system, the response time from MariaDB to web and mobile applications was measured. The results is ranging from 0.0256 to 0.0545 seconds in a 4G (LTE) network environment and from 0.6126 to 1.2978 seconds in a 3G network environment, which is considered a satisfactory result.

The Anti-Islanding Method with Compensation of Load Reactive Power for Grid-connected Photovoltaic Generation System (계통 연계형 태양광 발전 시스템의 부하 무효전력 보상이 적용된 단독운전 인지법)

  • Jeong, Jin-Beom;Shin, Dong-Hyun;Kim, Hee-Jun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.57 no.1
    • /
    • pp.58-64
    • /
    • 2008
  • In this paper, we present an active anti-islanding method with a load monitoring system using reactive power control. The proposed method, which is based on reactive power control, has fewer harmonics components than those in conventional methods, and it can minimize the reactive power component of the grid because it compensates the reactive power component with the load monitoring. The proposed quick islanding detection method was confirmed from the experimental results with an inverter for a 3kW photovoltaic system.

Condition Monitoring in a Gear with Initial Pitting Using Phase Map of Wavelet Transform (웨이블렛 변환의 위상 지도를 이용한 초기 피팅 결함을 갖는 기어의 상태 감시)

  • 심장선;이상권
    • Proceedings of the Korean Society for Noise and Vibration Engineering Conference
    • /
    • 2001.05a
    • /
    • pp.590-595
    • /
    • 2001
  • Vibration transient generated by developing localized fault in gear can be used as indicators of condition monitoring in a gear. In this paper, we propose the phase map for a fault signal using continuous wavelet transform to detect this vibration transient. Local fault induces the abrupt fluctuation of load exciting tooth and phase lag in the vibration signal measured on the gearbox. The relatively large fault like "tip breakage" easily can be detected by the clear fluctuation of exciting load. However, minor fault like "initial pitting" cannot be detected using the load fluctuation. To detect this kind of minor fault, the phase map for a fault signal is taken into account. The phase lag by minor fault is observed well in the phase map.

  • PDF

The future role of smart structure systems in modern aircraft

  • Becker, J.;Luber, W.;Simpson, J.;Dittrich, K.
    • Smart Structures and Systems
    • /
    • v.1 no.2
    • /
    • pp.159-184
    • /
    • 2005
  • The paper intends to summarize some guidelines for future smart structure system application in military aircraft. This preview of system integration is based upon a review on approximately one and a half decades of application oriented aerospace related smart structures research. Achievements in the area of structural health monitoring, adaptive shape, adaptive load bearing devices and active vibration control have been reached, potentials have been identified, several feasibility studies have been performed and some smart technologies have been already implemented. However the realization of anticipated visions and previously initial timescales announced have been rather too optimistic. The current development shall be based on a more realistic basis including more emphasis on fundamental aircraft strength, stiffness, static and dynamic load and stability requirements of aircraft and interdisciplinary integration requirements and improvements of integrated actors, actuator systems and control systems including micro controllers.

Wind-induced response and loads for the Confederation Bridge -Part II: derivation of wind loads

  • Bakht, Bilal;King, J. Peter C.;Bartlett, F.M.
    • Wind and Structures
    • /
    • v.16 no.4
    • /
    • pp.393-409
    • /
    • 2013
  • This paper uses ten years of on-site monitoring data for the Confederation Bridge to derive wind loads and investigate whether the bridge has experienced its design wind force effects since its completion in 1997. The load effects derived using loads from the on-site monitoring data are compared to the load effects derived using loads from the 1994 and 2009 wind tunnel aerodynamic model tests. The research shows, for the first time, that the aerodynamic model-based methodology originally developed in 1994 is a very accurate method for deriving wind loads for structural design. The research also confirms that the bridge has not experienced its specified (i.e., unfactored) wind force effects since it was opened to traffic in 1997, even during the most severe event that has occurred during this period.

A countermeasure against Foreshadow and ZombieLoad attacks based on segmentation fault monitoring (Segmentation fault 모니터링을 통한 Foreshadow 및 ZombieLoad 공격 방어 기법 연구)

  • Lee, Jun-Yeon;Suh, Taeweon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2019.10a
    • /
    • pp.384-387
    • /
    • 2019
  • 2018년 Meltdown 공격이 발표된 이후 Foreshadow, ZombieLoad 등 다양한 종류의 마이크로아키텍처 기반 부 채널 공격과 방어 기법들이 발표되었다. 그중 Meltdown 공격을 원천 차단할 수 있는 KPTI (Kernel Page Table Isolation)는 커널 영역을 사용자 메모리 영역과 분리하여 커널 정보의 유출을 방어할 수 있으나, 최대 46%의 시스템 성능 저하를 가져온다. 본 연구는 런타임에 시스템콜 발생빈도를 분석하여 낮은 오버헤드로 Meltdown-type 공격을 탐지하고, 방어하는 프로그램을 개발하고 실험하였다. 개발한 Fault Monitoring Tool은 기존 시스템 대비 적은 오버헤드(최대 7%)로 악의적인 사용자를 구분해 내고 방어할 수 있었다.

Intelligent Diagnosis System for an Electronic Weighting Machine (전자 저울을 위한 지능형 고장 진단 시스템)

  • 김종원;김영구;조현찬;서화일;김두용;이병수
    • Proceedings of the Korean Institute of Intelligent Systems Conference
    • /
    • 2001.12a
    • /
    • pp.78-82
    • /
    • 2001
  • Electronic Weighting Machine is used an electronic scale which has many trouble because of broken load cells. In this paper, we propose an intelligent Diagnosis System will for an electronic weighting machine using fuzzy logic. It's purpose be detect of the load cell's trouble. The electronic circuit of system, which call 'junction box', will be connected resistances in a series at circuit of Wheatstone Bridge for monitoring the condition of load cells.

  • PDF

Monitoring of Pollutant load from a Subwatershed in the Jooam lake (주암호 유입 소유역 오염부하 모니터링)

  • Yoon, Kwang-Sik;Choi, Soo-Myung;Han, Kuk-Heon;Cho, Jae-Young
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2001.10a
    • /
    • pp.475-478
    • /
    • 2001
  • Runoff and nutrient concentrations were monitored to identify pollutant load characteristics of a subwatershed in the Jooam lake. Observed concentrations of T-N and T-P were $1.445{\sim}3.980mg/{\ell}\;and\;0{\sim}0.273mg/{\ell}$, respectively. Runoff load of T-N, T-P by single storm occurred June 24th 2001 contributed 55% of T-N and 41% T-P of total pollutant load during study period.

  • PDF

An Expert System for Security Assessment in Distribution System (배전계토에서의 안전도 평가를 위한 전문가 시스)

  • Park, Byoung-youn;Kim, Se-Ho;Moon, Young-Hyun
    • The Transactions of the Korean Institute of Electrical Engineers
    • /
    • v.43 no.2
    • /
    • pp.179-188
    • /
    • 1994
  • This paper deals with implementation of an expert system to obtain an optimal plan of load transfer for fault restoration with the capability of security monitoring and assessment in distribution systems. Based on the technique of load transfer tree analysis, the proposed expert system can afford to assist system operators in proposing an optimal plan of load transfer for fault restoration, In paticular, an application of the proposed ES to practical distribution systems yields an optimal load transfer plan which ensures system security by considering security assessment for contingency of feeders and main transformers in the knowledge based sense.