Stochastic Scheduling for Repetitive Construction Projects

  • Lee, Hong-Chul;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.166-168
    • /
    • 2015
  • Line of Balance (LOB) method is suitable to schedule construction projects composed of repetitive activities. Since existing LOB based repetitive project scheduling methods are deterministic, they do not lend themselves to handle uncertainties involved in repetitive construction process. Indeed, existing LOB scheduling dose not handle variability of project performance indicators. In order to bridge the gap between reality and estimation, this study provides a stochastic LOB based scheduling method that allows schedulers for effectively dealing with the uncertainties of a construction project performance. The proposed method retrieves an appropriate probability distribution function (PDF) concerning project completion times, and determines favorable start times of activities. A case study is demonstrated to verify and validate the capability of the proposed method in a repetitive construction project planning.

  • PDF

Optimizing Construction Alternatives for Repetitive Scheduling (반복공정 최적 공법대안 선정 방법)

  • Park, Sang-Min;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.132-133
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Optimizing Construction Alternatives for Scheduling Repetitive Units

  • Park, Sang-Min;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.158-160
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of existing time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes to cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

Crashing Method for Repetitive Project hybridizing concurrent engineering and LOB (동시공학 및 LOB를 사용한 반복 프로젝트 공기단축 방법론)

  • Min, Gyu-Tae;Lee, Hong-Chu;Li, Xian-Jun;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.41-42
    • /
    • 2018
  • Various methods that crash the project completion time have been studied. Line-of-Balance (LOB) is well accepted as a useful method that enables steady resource utilization without frequent hire-and-fire of resources for a project having repetitive units. Existing studies involved in LOB-CPM focuses on thesis such as resource leveling and optimization in construction scheduling community. However, crashing methods are not arrived at a full maturity in LOB scheduling, because no one handles steady resource utilization while keeping activity-relationships. This paper proposes a method that crashes project completion time by hybridizing concurrent engineering and LOB scheduling without using additional resources.

  • PDF

A Study on the Heuristic Algorithm Development for Load Balance Ratio Increase of Workers in Warehouse (물류창고 불출자 로드밸런스율 증대 휴리스틱 알고리즘 개발)

  • Quan, Yu;Jang, Jung-Hwan;Jang, Jing-Lun;Jho, Yong-chul;Lee, Chang-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.19 no.1
    • /
    • pp.203-210
    • /
    • 2017
  • Companies are pursuing the management of small quantity batch production or JIT(Just-in-time) system for improving the delivery response and LOB(Line Balancing) in order to satisfy consumers' increasing demands in the current global economic recession. And in order to improve the growth of production for reducing manufacturing cost, improvements of the Load Balancing have become an important reformation factor. Thus this paper is aimed at warehouse which procures materials on the assembly line in procurement logistics of automotive logistics and proceed with research on heuristic algorithm development which can increase the Load Balancing of workers. As a result of this study, when applied the primary target value, it was verified that the whole workers decreased from 28 to 24. Furthermore, when specified the secondary target value and applied algorithm once more, it was verified that the Load Balance Ratio was improved from 44.96% to 91.7%.

A Stochastic Linear Scheduling Method using Monte Carlo Simulation

  • Soderlund, Chase;Park, Borinara
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.169-173
    • /
    • 2015
  • The linear scheduling method or line-of-balance (LOB) is a popular choice for projects that involve repetitive tasks during project execution. The method, however, produces deterministic schedule that does not convey a range of potential project outcomes under uncertainty. This results from the fact the basic scheduling parameters such as crew production rates are estimated to be deterministic based on single-point value inputs. The current linear scheduling technique, therefore, lacks the capability of reflecting the fluctuating nature of the project operation. In this paper the authors address the issue of how the variability of operation and production rates affects schedule outcomes and show a more realistic description of what might be a realistic picture of typical projects. The authors provide a solution by providing a more effective and comprehensive way of incorporating the crew performance variability using a Monte Carlo simulation technique. The simulation outcomes are discussed in terms of how this stochastic approach can overcome the shortcomings of the conventional linear scheduling technique and provide optimum schedule solutions.

  • PDF

A Method of Applying Work Relationships for a Linear Scheduling Model (선형 공정계획 모델의 작업 관계성 적용 방법)

  • Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.4
    • /
    • pp.31-39
    • /
    • 2010
  • As the linear scheduling method has been used since the Empire State Building linear schedule in 1929, it is being applied in various fields, such as construction and manufacturing. When addressing concurrent critical paths occurring in a linear construction schedule, empirical researches have stressed resource management, which should be applied for optimizing workflow, ensuring flexible work productivity and continuous resource allocation. However, work relationships have been usually overlooked in making the linear schedule from an existing network schedule. Therefore, this research analyzes the previous researches related to the linear scheduling model, and then proposes a method that can be applied for adopting the relationships of a network schedule to the linear schedule. To this end, this research considers the work relationships occurring in changing a network schedule into a linear schedule, and then confirms the activities movement phenomenon of linear schedule due to workspace change, such as physical floors change. As a result, this research can be used as a basic research in order to develop a system generating a linear schedule from a network schedule.